Report Investigation of gas blowout on Snorre A - Well Integrity ...
Report Investigation of gas blowout on Snorre A - Well Integrity ...
Report Investigation of gas blowout on Snorre A - Well Integrity ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
47. Exempti<strong>on</strong> Synergi No. 36064 for well 34/7-P-26<br />
48. E-mail from SNA safety supervisor: Power point presentati<strong>on</strong> with visualizati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>gas</str<strong>on</strong>g> leak,<br />
evacuati<strong>on</strong> and well fighting<br />
49. Notes from program engineer (notebook with relevant papers from the program engineer)<br />
50. Cementing problems. Doc id RA 95-191/SBB Saga Petroleum AS<br />
51. Gas flow report, Unintended flow <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>gas</str<strong>on</strong>g>/diesel RUH 283229<br />
52. E-mail from SNA c<strong>on</strong>structi<strong>on</strong> manager re: low pressure in fire water<br />
53. Statoil's investigati<strong>on</strong> report with appendices (doc 2240-61) no print-out<br />
54. Detailed program for <strong>Snorre</strong> 34/7-P-31 A - Signed interim procedure pull string<br />
55. E-mail: Reply from program engineer to drilling supervisor SNA <str<strong>on</strong>g>of</str<strong>on</strong>g> 23 November 2004<br />
56. Pictures <str<strong>on</strong>g>of</str<strong>on</strong>g> acti<strong>on</strong> board SNA 28-29 November 2004 (doc. no. 2240-17)<br />
57. Safety supervisor's notes in c<strong>on</strong>necti<strong>on</strong> with "<strong>Well</strong> P-31 out <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>trol”<br />
58. ROV film Oceaneering<br />
59. Video log Oceaneering<br />
60. <strong>Snorre</strong> A RESU transcript from MIS (Goal management in Statoil)<br />
61. E-mail from SNA safety supervisor: Experience from SNA lifeboat captain<br />
62. E-mail to JAN/PSA <str<strong>on</strong>g>of</str<strong>on</strong>g> 29 November 2004: Applicati<strong>on</strong> for extended safety z<strong>on</strong>e<br />
63. Positi<strong>on</strong> descripti<strong>on</strong>s<br />
a) RESU manager (<strong>Snorre</strong>)<br />
b) RESU unit manager (<strong>Snorre</strong> A)<br />
c) Drilling operati<strong>on</strong>s supervisor<br />
d) Drilling supervisor<br />
e) Lead drilling and well engineers<br />
f) Drilling engineers<br />
64. WR0011 ”Exempti<strong>on</strong>s, improvement and n<strong>on</strong>-c<strong>on</strong>formities” Procedure for handling n<strong>on</strong>c<strong>on</strong>formities<br />
65. <str<strong>on</strong>g>Report</str<strong>on</strong>g> from internal audit <strong>Snorre</strong> RESU in 2003 (c<strong>on</strong>ducted by process owner B&B)<br />
66. <str<strong>on</strong>g>Report</str<strong>on</strong>g> from internal audit <strong>Snorre</strong> RESU in June 2004 (c<strong>on</strong>ducted by process owner B&B)<br />
67. Positi<strong>on</strong> descripti<strong>on</strong>, operati<strong>on</strong>s engineer<br />
68. ”<strong>Snorre</strong> CCR log”. (Pages 165-168)<br />
52