WIR 03/2021 [EN]
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
International Projects<br />
15<br />
Architectural gem makes waves in South Tyrol<br />
10-MGD Olang 1 + 2 | Kronplatz (Plan de Corones), South Tyrol (ITA)<br />
Olanger Seilbahnen GmbH<br />
3,021 m (Olang 1), 1,050 m (Olang 2) 909 m (Olang 1), 200 m (Olang 2) 3,900 PPH 6.5 m/s<br />
9.74 min (Olang 1), 4.2 min (Olang 2) 182 10-passenger cabins D-Line<br />
The new 10-passenger gondola lift Olang<br />
1+2 is not just high-performance and cuttingedge<br />
but also an architectural showpiece.<br />
In spite of the diffi cult situation due to Covid-19,<br />
the Kronplatz (Plan de Corones) ski resort in<br />
South Tyrol took the conscious decision to go<br />
ahead with the planned construction of its<br />
ambitious 10-passenger gondola lift Olang 1+2<br />
in collaboration with Doppelmayr from summer<br />
2020. The both visually and technically outstanding<br />
installation has two sections and<br />
represents a flagship project for tourism<br />
throughout the entire region. The new lift acts<br />
as the main feeder from the catchment area<br />
Olang, Rasen-Antholz and Hochpustertal in<br />
winter and summer.<br />
A touch of Hamburg flair<br />
The first thing that catches the eye is the impressive<br />
architecture of the station buildings.<br />
The striking wave design and a distinctive roof<br />
made from translucent foil are the result of an<br />
architecture competition that was won by the<br />
innovative Hamburg-based architecture firm<br />
studio schlotthauer matthiessen architecturemade.<br />
Three stunning station buildings were<br />
created at elevations of 1,164, 2,073 and 2,274<br />
meters in just five months. The dome-shaped<br />
roof construction, which overarches the machinery,<br />
is transparent and allows visitors to<br />
see the technology in action. The bottom station<br />
houses the information and ticket desk as<br />
well as the offices that are accessible from the<br />
inside. The new mid station incorporates the<br />
cabin parking facility, which was previously in<br />
the bottom station on the predecessor lift. In<br />
addition, this station also provides space for<br />
parking snow vehicles.<br />
High-performance and record-breaking<br />
The performance specifi cations for this installation<br />
are remarkable. In comparison with the<br />
previous 6-passenger gondola lift built in 1989,<br />
capacity has been almost doubled. Its rope<br />
speed of 6.5 meters per second, the 64 mm<br />
rope diameter and the 2,130 kW drive power<br />
are unique in Italy and also virtually unequalled<br />
in the rest of Europe. Passenger safety is ensured<br />
by a high-tech system for continuous<br />
monitoring of the rope position on the sheaves.<br />
This is the first time that the RPD Nexo system<br />
has been used in Italy. For top comfort, the<br />
elegant OMEGA V cabins are fitted with seat<br />
heating. Visitors to the Kronplatz can look<br />
forward to an exceptional ropeway experience<br />
on the Olang 1+2.<br />
With this lift installation, we want to set the<br />
trend for the entire region and perhaps encourage<br />
other tourist areas<br />
to do the same and join<br />
forces to boost momentum.<br />
Matthias Prugger,<br />
President, Olanger<br />
Seilbahnen