Sash windows<br />
Continued from page 28<br />
The project had to carried out over<br />
five phases to limit the impact on<br />
the school<br />
further improve upon these key assets to offer the<br />
best possible window.”<br />
A solution that delivers<br />
A total of 189 REHAU vertical sliding sash<br />
windows needed to be fitted by Hadrian<br />
throughout the school. In addition to this, 40<br />
replacement casement windows were required<br />
to the toilet blocks and external wellways, which<br />
the installer manufactured inhouse, with REHAU<br />
profiles.<br />
As this project was to be carried out during<br />
term-time, ongoing works needed to cause<br />
minimal disruption for pupils, teachers and other<br />
“Everyone has been<br />
commenting on how<br />
good the windows<br />
look and the quality is<br />
top class, so we’re all<br />
really pleased”<br />
on-site staff. Indeed, due to size of the windows,<br />
measuring 1200 x 3300mm and weighing<br />
in excess of 150kg, they had to be split into<br />
separate frames and coupled together on site.<br />
In order to ensure school activities during the day<br />
remained undisturbed, these product deliveries<br />
and joining activities occurred outside teaching<br />
hours.<br />
David Carr, Quantity Surveyor at Hadrian Window<br />
Systems, commented: “We have worked with<br />
Roseview for many years and, in that time, have<br />
built a good relationship and have confidence in<br />
the quality of their vertical sliding sash windows.<br />
“The size and weight of the windows meant<br />
two installers were required to manoeuvre each<br />
frame into position, so good ease-of-fit was<br />
a must when using an external scaffold and a<br />
telehandler.<br />
Five stars<br />
The whole project was carried out over five<br />
phases, running from July 2020 to January 2021<br />
in order to limit the impact on the school.<br />
Each phase was linked to the building elevations<br />
and was planned so that one classroom was<br />
released at a time, enabling the school to relocate<br />
pupils to different classrooms without impinging<br />
on teaching.<br />
The five-phase approach was praised by<br />
Chris Martindale, Project Development Officer<br />
at Gateshead Council: “We were extremely<br />
impressed with how smoothly this project ran<br />
from the beginning to completion, especially given<br />
the complex circumstances involved.<br />
He concluded: “As a client, I was able to leave<br />
everyone involved in this to carry out the works<br />
required – the fact I could do this, and still have<br />
the project delivered on time, was something I<br />
really appreciated.<br />
“We would happily engage Hadrian again because<br />
their communication was excellent. Since the<br />
project was completed, everyone has been<br />
commenting on how good the windows look<br />
and the quality is top class, so we’re all really<br />
pleased.”<br />
Contact REHAU / Roseview<br />
01989 762600 / 01234 712 657<br />
www.rehau.com/uk-en / roseview.co.uk<br />
@REHAUWindows / @RoseviewWindows<br />
30 TI MARCH <strong>2022</strong> PRACTICAL CONTENT FOR THE GLAZING INSTALLER & HOME IMPROVEMENT SPECIALIST