Sash windows<br />

Continued from page 28<br />

The project had to carried out over<br />

five phases to limit the impact on<br />

the school<br />

further improve upon these key assets to offer the<br />

best possible window.”<br />

A solution that delivers<br />

A total of 189 REHAU vertical sliding sash<br />

windows needed to be fitted by Hadrian<br />

throughout the school. In addition to this, 40<br />

replacement casement windows were required<br />

to the toilet blocks and external wellways, which<br />

the installer manufactured inhouse, with REHAU<br />

profiles.<br />

As this project was to be carried out during<br />

term-time, ongoing works needed to cause<br />

minimal disruption for pupils, teachers and other<br />

“Everyone has been<br />

commenting on how<br />

good the windows<br />

look and the quality is<br />

top class, so we’re all<br />

really pleased”<br />

on-site staff. Indeed, due to size of the windows,<br />

measuring 1200 x 3300mm and weighing<br />

in excess of 150kg, they had to be split into<br />

separate frames and coupled together on site.<br />

In order to ensure school activities during the day<br />

remained undisturbed, these product deliveries<br />

and joining activities occurred outside teaching<br />

hours.<br />

David Carr, Quantity Surveyor at Hadrian Window<br />

Systems, commented: “We have worked with<br />

Roseview for many years and, in that time, have<br />

built a good relationship and have confidence in<br />

the quality of their vertical sliding sash windows.<br />

“The size and weight of the windows meant<br />

two installers were required to manoeuvre each<br />

frame into position, so good ease-of-fit was<br />

a must when using an external scaffold and a<br />

telehandler.<br />

Five stars<br />

The whole project was carried out over five<br />

phases, running from July 2020 to January 2021<br />

in order to limit the impact on the school.<br />

Each phase was linked to the building elevations<br />

and was planned so that one classroom was<br />

released at a time, enabling the school to relocate<br />

pupils to different classrooms without impinging<br />

on teaching.<br />

The five-phase approach was praised by<br />

Chris Martindale, Project Development Officer<br />

at Gateshead Council: “We were extremely<br />

impressed with how smoothly this project ran<br />

from the beginning to completion, especially given<br />

the complex circumstances involved.<br />

He concluded: “As a client, I was able to leave<br />

everyone involved in this to carry out the works<br />

required – the fact I could do this, and still have<br />

the project delivered on time, was something I<br />

really appreciated.<br />

“We would happily engage Hadrian again because<br />

their communication was excellent. Since the<br />

project was completed, everyone has been<br />

commenting on how good the windows look<br />

and the quality is top class, so we’re all really<br />

pleased.”<br />

Contact REHAU / Roseview<br />

01989 762600 / 01234 712 657<br />

www.rehau.com/uk-en / roseview.co.uk<br />

@REHAUWindows / @RoseviewWindows<br />

30 TI MARCH <strong>2022</strong> PRACTICAL CONTENT FOR THE GLAZING INSTALLER & HOME IMPROVEMENT SPECIALIST

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!