20.05.2022 Views

Highway DBN -June 22

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

In 2021, numerous upgrades added immeasurable value to<br />

our campus giving our boys the opportunity to use their<br />

potential to perform to the best of their ability in every sphere<br />

of school life, to ultimately fulfil their potential.<br />

This included upgraded cricket nets, an outdoor multi-sport<br />

court with stands for an extended Grade 10 break area.<br />

Huberta House had a complete overhaul as the Grade 8<br />

Boarding House and the Matric break area was revamped<br />

into an incredible space for our Grade 12s.<br />

20<strong>22</strong> has already started on a positive note with the Grade 9<br />

classrooms being completely transformed. Bowden’s Sports<br />

Pavilion has undergone significant changes. The Grade 11<br />

break area has also had a facelift, and our Cricket Academy<br />

is due for completion by the end of August. A second<br />

boarding house is due for an upgrade, which will add<br />

to parking on the school grounds as well.<br />

These campus upgrades are vital to maintain Westville Boys’<br />

reputation as a high school that consistently has<br />

representatives at KZN and SA level in both academics and<br />

sport.<br />

52&53_Westville Boys.indd 2<br />

20<strong>22</strong>/05/19 07:35:35 PM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!