Planning Guide AC Servomotors 1FT5 - Siemens Automation and ...
Planning Guide AC Servomotors 1FT5 - Siemens Automation and ...
Planning Guide AC Servomotors 1FT5 - Siemens Automation and ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1 Kapitel<br />
Hotline<br />
vi<br />
If you have any questions, please contact the following Hotline:<br />
A&D Technical Support Tel.: +49 (180) 5050–222<br />
Fax: +49 (180) 5050–223<br />
eMail: adsupport@siemens.com<br />
If you have any questions regarding the documentation (suggestions, corrections)<br />
then please send a fax to the following number:<br />
+49 (9131) 98–2176<br />
Fax form: Refer to the feedback sheet at the end of the document<br />
05.03<br />
Definition of qualified personnel<br />
For the purpose of this document <strong>and</strong> warning information on the product itself,<br />
”Qualified personnel” are those who are familiar with the installation, mounting,<br />
start–up <strong>and</strong> operation of the equipment <strong>and</strong> are appropriately qualified <strong>and</strong> trained<br />
for the function which they perform.<br />
� Trained <strong>and</strong> authorized to energize/de–energize, circuits <strong>and</strong> equipment in<br />
accordance with established safety procedures.<br />
� Trained in the proper care <strong>and</strong> use of protective equipment in accordance with<br />
established safety procedures.<br />
� Trained in rendering first aid.<br />
© <strong>Siemens</strong> AG 2003 All rights reserved<br />
<strong>AC</strong> <strong>Servomotors</strong> <strong>1FT5</strong> (PFT5) – 05.03 Edition