26.12.2012 Views

Transocean Proxy Statement and 2010 Annual Report

Transocean Proxy Statement and 2010 Annual Report

Transocean Proxy Statement and 2010 Annual Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

St<strong>and</strong>ard Jackups<br />

The following table provides certain information regarding our 54 St<strong>and</strong>ard Jackups as of February 10, 2011:<br />

Year Water Drilling<br />

entered depth depth<br />

service/ capacity capacity<br />

Name upgraded (a) (in feet) (in feet) Location<br />

Trident IX 1982 400 21,000 Idle<br />

GSF Adriatic II 1981 350 25,000 Stacked<br />

GSF Adriatic IX 1981 350 25,000 Nigeria<br />

GSF Adriatic X 1982 350 30,000 Idle<br />

GSF Key Manhattan 1980 350 25,000 Italy<br />

GSF Key Singapore 1982 350 25,000 Stacked<br />

GSF Adriatic VI 1981 328 25,000 Stacked<br />

GSF Adriatic VIII 1983 328 25,000 Stacked<br />

C. E. Thornton 1974 300 25,000 India<br />

D. R. Stewart 1980 300 25,000 Stacked<br />

F. G. McClintock 1975 300 25,000 India<br />

George H. Galloway 1984 300 25,000 Stacked<br />

GSF Adriatic I 1981 300 25,000 Stacked<br />

GSF Adriatic V 1979 300 25,000 Stacked<br />

GSF Adriatic XI 1983 300 25,000 Stacked<br />

GSF Compact Driller 1992 300 25,000 Thail<strong>and</strong><br />

GSF Galveston Key 1978 300 25,000 Vietnam<br />

GSF Key Gibraltar 1976/1996 300 25,000 Thail<strong>and</strong><br />

GSF Key Hawaii 1982 300 25,000 Qatar<br />

GSF Labrador 1983 300 25,000 Stacked<br />

GSF Main Pass I 1982 300 25,000 Arabian Gulf<br />

GSF Main Pass IV 1982 300 25,000 Arabian Gulf<br />

GSF Rig 136 1982 300 25,000 Stacked<br />

Harvey H. Ward 1981 300 25,000 Idle<br />

J. T. Angel 1982 300 25,000 India<br />

R<strong>and</strong>olph Yost 1979 300 25,000 Stacked<br />

Roger W. Mowell 1982 300 25,000 Stacked<br />

Ron Tappmeyer 1978 300 25,000 India<br />

<strong>Transocean</strong> Shelf Explorer 1982 300 20,000 Stacked<br />

Interocean III 1978/1993 300 25,000 Stacked<br />

<strong>Transocean</strong> Nordic 1984 300 25,000 Stacked<br />

Trident II 1977/1985 300 25,000 India<br />

Trident IV-A 1980/1999 300 25,000 Stacked<br />

Trident 17 1983 300 25,000 Stacked<br />

Trident XII 1982/1992 300 25,000 India<br />

Trident XIV 1982/1994 300 25,000 Angola<br />

Trident 15 1982 300 25,000 Thail<strong>and</strong><br />

Trident 16 1982 300 25,000 Vietnam<br />

Trident VIII 1981 300 21,000 Gabon<br />

GSF Parameswara 1983 300 20,000 Indonesia<br />

GSF Rig 134 1982 300 20,000 Stacked<br />

GSF High Isl<strong>and</strong> II 1979 270 20,000 Arabian Gulf<br />

GSF High Isl<strong>and</strong> IV 1980/2001 270 20,000 Arabian Gulf<br />

GSF High Isl<strong>and</strong> V 1981 270 20,000 Stacked<br />

GSF High Isl<strong>and</strong> VII 1982 250 20,000 Nigeria<br />

GSF High Isl<strong>and</strong> IX 1983 250 20,000 Stacked<br />

GSF Rig 103 1974 250 20,000 Stacked<br />

GSF Rig 105 1975 250 20,000 Egypt<br />

GSF Rig 124 1980 250 20,000 Idle<br />

GSF Rig 127 1981 250 20,000 Stacked<br />

GSF Rig 141 1982 250 20,000 Egypt<br />

<strong>Transocean</strong> Comet 1980 250 20,000 Egypt<br />

Trident VI 1981 220 21,000 Stacked<br />

GSF Britannia 1968 200 20,000 Stacked<br />

______________________________<br />

(a) Dates shown are the original service date <strong>and</strong> the date of the most recent upgrade, if any.<br />

AR-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!