Figure 10: Supplier process flow chart<br />

Quotations will be<br />

produced within<br />

10 Days<br />

Manufacturing Lead Time is<br />

42 Days<br />

From receipt of order to first day<br />

on site<br />

Approved Drawings issued to<br />

Supplier by Regional Works<br />

Contractor<br />

2.27 Suppliers were also able to feedback on the areas for improvement in advance of the<br />

next phase. For example, Allan Nuttall Ltd. provided an clear presentation of commonly<br />

encountered problems with the installation of interview screens and booths including:<br />

• Runs of several booths set out staggered to suit local site conditions<br />

• Adjacent walls had insufficient length to accept bulkhead<br />

• Various assortment of CAD blocks used some showing desks with return tops<br />

• Mechanical ducting installed too low, fouling bulkhead<br />

• Product size altered to suit local conditions<br />

• Structural objects fouling installation area<br />

• Ceilings Installed prior to our installation<br />

• Varying sizes of structural openings.<br />

2.28 Figure 11 shows how an existing structural column and a flank wall which is too short<br />

results in modifications to the:<br />

• Desktop<br />

• Modesty panel<br />

• Canopy Sub Frame<br />

• Canopy Bulkhead & Fascia Panels<br />

• Glass Mounting Trough<br />

• Position Closed Blind.<br />

Supplier prepare<br />

Quotation<br />

Order Received<br />

Product Manufacture<br />

Site Installation<br />

Site Survey<br />

(Health & Safety)<br />

19