In general terms, gas supply is not constrained in the Yorkshire region, as it benefits from a<br />

number of connections to the national High Pressure Transmission Network, as well as<br />

having an extensive and robust core network around the main urban areas such as <strong>Bradford</strong><br />

<strong>District</strong>. However, many rural areas have no gas supply. This may limit scope for housing<br />

and economic growth in some rural parts of the district.<br />

The following table lists some of the major gas infrastructure projects above £0.5m that are<br />

being undertaken in and around <strong>Bradford</strong> <strong>District</strong>:<br />

Table: Major Gas infrastructure projects above £0.5m<br />

The projects included in the table above are subject to the acceptance of a formal quotation. The<br />

Eggborough Reinforcement scheme has been kept in the plan due to the major impact this potential<br />

new load would have on the system.<br />

Source: The Regional Integrated <strong>Infrastructure</strong> Scoping <strong>Study</strong> (Arup, 2008)<br />

The Regional Integrated <strong>Infrastructure</strong> Scoping <strong>Study</strong> (Arup, 2008) forecasts growth in gas<br />

demand across the whole North East LDZ during the next ten years (2008-2016) of 7.15%<br />

but declining towards the end of the forecast, with the average growth 0.86% per annum.<br />

49