2003 February<br />
R & D Research <strong>and</strong> Development<br />
RFC Release for <strong>Construction</strong><br />
S/B Service Building<br />
SCP St<strong>and</strong>ard Commissioning Procedure<br />
SCR Secondary Control Room<br />
SDC Shutdown cooling (pumps)<br />
SFB Spent Fuel Bay<br />
SFTB Spent Fuel Transfer Bay<br />
SPMO Site <strong>Project</strong> Management Organization<br />
SQA Site Quality Assurance<br />
SSP System Surveillance Plan<br />
STAR Chinese Quality organization overseeing NSP construction on behalf of owner<br />
T/B Turbine Building<br />
T/G Turbine Generator<br />
T/H Turbine Hall<br />
T/O Turnover<br />
TRAK Electronic document control system developed by AECL<br />
TQNPC Third <strong>Qinshan</strong> Nuclear Power Company Limited<br />
U/G Underground<br />
US-EXIM Export-Import Bank of the United States<br />
VHL Very Heavy Lift<br />
WIS Weld Information System<br />
WMS Work Permit Management System<br />
WP Work Plan<br />
WR Work Request<br />
WTR Water Treatment Plant<br />
ZTPC Zhejiang Thermal Nuclear Power Company<br />