LWBTC No. 26/85<br />

- 15 -<br />

(b) F<strong>or</strong>m PWD 84 - Consent to erect Temp<strong>or</strong>ary Structure on W<strong>or</strong>ks<br />

Site<br />

3.5.3 Site Control<br />

To be issued by Project Office <strong>f<strong>or</strong></strong> temp<strong>or</strong>ary structures in cases<br />

where w<strong>or</strong>ks site cannot be defined in contract document (e.g.<br />

Maintenance contracts). Site to be jointly selected with District<br />

<strong>Land</strong>s Office.<br />

(a) Contract<strong>or</strong>* when <strong>or</strong>dered by Project Office to start w<strong>or</strong>k, to be<br />

required to take charge <strong>of</strong> Site and W<strong>or</strong>ks/B<strong>or</strong>row Areas and be<br />

responsible <strong>f<strong>or</strong></strong> keeping clean and clear <strong>of</strong> illegal occupation.<br />

(b) Plans <strong>f<strong>or</strong></strong> areas allocation to contract<strong>or</strong> to be sent by Project Office<br />

to :-<br />

Contract<strong>or</strong>* <strong>f<strong>or</strong></strong> retention in Site Office<br />

District <strong>Land</strong>s Office ) (with statement <strong>of</strong> period<br />

District Squatter<br />

Control Office<br />

)<br />

)<br />

<strong>f<strong>or</strong></strong> which areas have been<br />

allocated.)<br />

(c) Project Office to ensure contract<strong>or</strong>* fulfils responsibilities <strong>f<strong>or</strong></strong><br />

keeping areas clean and clear, <strong>f<strong>or</strong></strong> w<strong>or</strong>king b<strong>or</strong>row areas safely and<br />

<strong>f<strong>or</strong></strong> siting temp<strong>or</strong>ary structures together. Where illegal occupation<br />

is found despite this, and on request <strong>of</strong> contract<strong>or</strong>, to arrange<br />

assistance <strong>of</strong> District <strong>Land</strong>s Office c.c. H.D. Clearance Division in<br />

eviction and clearance but every ef<strong>f<strong>or</strong></strong>t must be made to avoid<br />

additions to the Clearance Programme in this way.<br />

3.5.4 On Completion<br />

* F<strong>or</strong> direct-labour jobs, responsibilities rest with Project Office.<br />

(a) Handing Over <strong>of</strong> Site<br />

Pri<strong>or</strong> to a contract<strong>or</strong> vacating the whole <strong>or</strong> any part <strong>of</strong> a Site <strong>or</strong><br />

W<strong>or</strong>k/B<strong>or</strong>row Area, Project Office to arrange <strong>f<strong>or</strong></strong> area being<br />

vacated, after necessary joint inspections, to be <strong>f<strong>or</strong></strong>mally handed<br />

over and confirmed in writing in one <strong>of</strong> the following ways to<br />

ensure continuous control :