LWBTC No. 26/85<br />

3.2.2 Project Plan<br />

- 6 -<br />

(ii) Project <strong>of</strong>fice to state when land likely to be required, to<br />

identify w<strong>or</strong>ks Division/Office and to request District <strong>Land</strong>s<br />

Office and H.D. Clearance Division to give estimate <strong>of</strong> time<br />

required <strong>f<strong>or</strong></strong> resumption and clearance, c.c. Area Clearance Co<strong>or</strong>dinat<strong>or</strong>.<br />

Prepared by Project Office after comments on Preliminary Project Plan<br />

and consultation as necessary and issued to these listed in para. 3.2.1.<br />

3.2.3 Approval<br />

Project Plan by L & W Conference if required by standing procedure.<br />

3.2.4 Follow up<br />

3.3 <strong>Land</strong> Allocation<br />

Where proposed timing requires funds <strong>f<strong>or</strong></strong> resumption, compensations<br />

and/<strong>or</strong> clearances be<strong>f<strong>or</strong></strong>e funds will become available <strong>f<strong>or</strong></strong> construction,<br />

Chief Estate Survey<strong>or</strong>/Acquisition <strong>of</strong> <strong>Land</strong>s Department should ensure<br />

that adequate funds are available to meet the estimated cost when the<br />

w<strong>or</strong>ks item is in Categ<strong>or</strong>y AB. Project Office to consult with CES/A,<br />

District <strong>Land</strong>s Office, H.D. Clearance Division and DO and Area<br />

Clearance Co-<strong>or</strong>dinat<strong>or</strong> <strong>of</strong> changes in project programme and layout; see<br />

also Paragraph 3.4(a)(vi) regarding Office Clearance Co-<strong>or</strong>dinat<strong>or</strong>s.<br />

This part <strong>of</strong> the procedure is to be followed <strong>f<strong>or</strong></strong> buildings, treatment plants, service<br />

reservoirs, depots, W<strong>or</strong>ks Areas, B<strong>or</strong>row area etc. which involve <strong>f<strong>or</strong></strong>mal<br />

permanent <strong>or</strong> temp<strong>or</strong>ary allocations <strong>of</strong> specifically defined lands; access roads<br />

may be included.<br />

3.3.1 Request <strong>f<strong>or</strong></strong> Allocation<br />

(a) By client Department <strong>or</strong> Project Office to District <strong>Land</strong>s Office,<br />

when Project in Cat. B <strong>or</strong> D <strong>of</strong> the Public W<strong>or</strong>ks Programme <strong>or</strong><br />

accepted as a charge to another vote with a statement on when land<br />

likely to be required and request that allocation conditions and site<br />

plan be prepared copying request to DO, CPWO <strong>of</strong> the Urban<br />

District and Area Clearance Co-<strong>or</strong>dinat<strong>or</strong>. District <strong>Land</strong>s Office,<br />

Client Department, <strong>or</strong> Project Office as appropriate to in<strong>f<strong>or</strong></strong>m H.D.<br />

Clearance Division at this stage <strong>of</strong> location and when land likely to<br />

be required.