Barcelona Plan<br />
Progr<strong>es</strong>s continued to be made on the projected<br />
actions, with the conclusion of construction work in<br />
the new terminal area, and that corr<strong>es</strong>ponding to the<br />
expansions and upgrading of the car parks, cargo area<br />
and service area of the new Terminal 1, The most signifi<br />
cant construction under way includ<strong>es</strong> building the<br />
south Control Tower, the east aircraft apron, the road<br />
connecting the terminals and expanding the general<br />
car park.<br />
«Terminal 1 of Barcelona<br />
Airport went into service on<br />
June 17th, 2009»<br />
However, the most signifi cant event as regards the actions<br />
encompassed in the Barcelona Plan was that which<br />
took place on June 17, the opening of Barcelona Airport’s<br />
Terminal 1, which was inaugurated the previous day.<br />
Levante Plan<br />
The Levante Plan pertains to the airports of Alicante<br />
and Valencia, and during 2009 the following were the<br />
most signifi cant actions carried out:<br />
Alicante Airport, The airport servic<strong>es</strong> building was<br />
completed, construction of the New Terminal Area<br />
is under way, the airfi eld is being upgraded and the<br />
electrical system is being revamped: new power plant,<br />
connections, galleri<strong>es</strong>, etcetera.<br />
Projects were drawn up for expanding the aircraft<br />
holding bay, repairing the runway thr<strong>es</strong>holds and implementing<br />
an integrated security system.<br />
General information<br />
Infrastructur<strong>es</strong><br />
Valencia Airport, The programmed construction<br />
work progr<strong>es</strong>sed as planned, That related to upgrading<br />
the airfi eld and building the new treatment plant was<br />
completed and that corr<strong>es</strong>ponding to the entranc<strong>es</strong><br />
to and utiliti<strong>es</strong> for the new control centre are still<br />
under way.<br />
Malaga Plan<br />
Considerable progr<strong>es</strong>s was made on the promised and<br />
projected actions of the Malaga Plan, namely:<br />
New Terminal Building, The new proc<strong>es</strong>sing<br />
building will be adjacent to the northern façade<br />
of the existing terminal so as to integrate the<br />
three terminals within a single terminal concept<br />
so that users can get around easily and conveniently,<br />
It will also boast a transport interchange<br />
to further intermodality.<br />
«Malaga Airport achiev<strong>es</strong><br />
the integration of its three<br />
terminals through a single<br />
terminal concept»<br />
Railway station and underground rail, The construction<br />
of a new railway station will complete the<br />
provision of the means of transport to the airport<br />
site.<br />
New north-south connection tunnel, The<br />
expansion of the Terminal Area includ<strong>es</strong> building a<br />
false tunnel that will become the airport’s main artery,<br />
as it will link the north and south acc<strong>es</strong>s roads,<br />
Aircraft aprons, The following improvements<br />
have been projected to enable operating at the<br />
Annual report 2009 225