Barcelona Plan<br />

Progr<strong>es</strong>s continued to be made on the projected<br />

actions, with the conclusion of construction work in<br />

the new terminal area, and that corr<strong>es</strong>ponding to the<br />

expansions and upgrading of the car parks, cargo area<br />

and service area of the new Terminal 1, The most signifi<br />

cant construction under way includ<strong>es</strong> building the<br />

south Control Tower, the east aircraft apron, the road<br />

connecting the terminals and expanding the general<br />

car park.<br />

«Terminal 1 of Barcelona<br />

Airport went into service on<br />

June 17th, 2009»<br />

However, the most signifi cant event as regards the actions<br />

encompassed in the Barcelona Plan was that which<br />

took place on June 17, the opening of Barcelona Airport’s<br />

Terminal 1, which was inaugurated the previous day.<br />

Levante Plan<br />

The Levante Plan pertains to the airports of Alicante<br />

and Valencia, and during 2009 the following were the<br />

most signifi cant actions carried out:<br />

Alicante Airport, The airport servic<strong>es</strong> building was<br />

completed, construction of the New Terminal Area<br />

is under way, the airfi eld is being upgraded and the<br />

electrical system is being revamped: new power plant,<br />

connections, galleri<strong>es</strong>, etcetera.<br />

Projects were drawn up for expanding the aircraft<br />

holding bay, repairing the runway thr<strong>es</strong>holds and implementing<br />

an integrated security system.<br />

General information<br />

Infrastructur<strong>es</strong><br />

Valencia Airport, The programmed construction<br />

work progr<strong>es</strong>sed as planned, That related to upgrading<br />

the airfi eld and building the new treatment plant was<br />

completed and that corr<strong>es</strong>ponding to the entranc<strong>es</strong><br />

to and utiliti<strong>es</strong> for the new control centre are still<br />

under way.<br />

Malaga Plan<br />

Considerable progr<strong>es</strong>s was made on the promised and<br />

projected actions of the Malaga Plan, namely:<br />

New Terminal Building, The new proc<strong>es</strong>sing<br />

building will be adjacent to the northern façade<br />

of the existing terminal so as to integrate the<br />

three terminals within a single terminal concept<br />

so that users can get around easily and conveniently,<br />

It will also boast a transport interchange<br />

to further intermodality.<br />

«Malaga Airport achiev<strong>es</strong><br />

the integration of its three<br />

terminals through a single<br />

terminal concept»<br />

Railway station and underground rail, The construction<br />

of a new railway station will complete the<br />

provision of the means of transport to the airport<br />

site.<br />

New north-south connection tunnel, The<br />

expansion of the Terminal Area includ<strong>es</strong> building a<br />

false tunnel that will become the airport’s main artery,<br />

as it will link the north and south acc<strong>es</strong>s roads,<br />

Aircraft aprons, The following improvements<br />

have been projected to enable operating at the<br />

Annual report 2009 225