Aeropuertos Españoles y Navegación Aérea - Aena.es
Aeropuertos Españoles y Navegación Aérea - Aena.es
Aeropuertos Españoles y Navegación Aérea - Aena.es
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SOUTHERN REGION<br />
Expansion of the equipment room in the TWR<br />
in Malaga, The basic objectiv<strong>es</strong> of this plan are to fi t<br />
out spac<strong>es</strong>, undertake nec<strong>es</strong>sary renovations and dismantlement,<br />
in addition to revamping the electrical<br />
and mechanical faciliti<strong>es</strong>, for the eventual installation<br />
of the air navigation equipment associated with the<br />
projected demands of the future layout of the airport.<br />
2,6,3 IN-FLIGHT VERIFICATION<br />
The most relevant actions during 2009 were:<br />
IN-FLIGHT CALIBRATION:<br />
Preferential use of <strong>Aena</strong> Internacional’s In-Flight Verifi -<br />
cation Unit over other units that operated for <strong>Aena</strong> in<br />
this capacity: the agreed-upon number of hours to carry<br />
out with this unit for 2009 was exceeded.<br />
Permits for authorization fl ights at new faciliti<strong>es</strong><br />
and associated procedur<strong>es</strong>: The State Agency for Air<br />
Safety (AESA) obtained the abovementioned permits<br />
for the new unit of <strong>Aena</strong> Internacional, which will also<br />
allow the reports generated to be pr<strong>es</strong>ented at air<br />
navigation forums.<br />
Periodic Calibrations Plan<br />
The completion of 96,68% of the fl ights planned repr<strong>es</strong>ented<br />
the succ<strong>es</strong>sful accomplishment of the objectiv<strong>es</strong>.<br />
2,7 CNS/ATM SYSTEMS<br />
The main activiti<strong>es</strong> carried out during 2009 are d<strong>es</strong>cribed<br />
below by areas:<br />
2,7,1 AUTOMATION<br />
General information<br />
Air navigation<br />
Functional chang<strong>es</strong> in the SACTA, ÍCARO and<br />
SCV systems<br />
SACTA SYSTEM (Automated Air Traffi c Control<br />
System):<br />
Launching the 3,Z5 version of the SACTA System<br />
(Automated Air Traffi c Control System) at the TMAroute<br />
control centr<strong>es</strong> of the AN network (ACC Canari<strong>es</strong>,<br />
ACC Madrid, ACC Seville, ACC Barcelona,<br />
ACC Palma, TACC Valencia, Madrid-Barajas Tower,<br />
Barcelona Tower).<br />
Transition to opening of the new Terminal 1 at the<br />
Barcelona Tower, Adaptation of the SACTA System<br />
to the operation of the tower in the environs of the<br />
new airfi eld and launching the surface movement<br />
radar (SMR) service.<br />
ÍCARO System:<br />
The strategy of evolving the Ícaro 2000 system into the<br />
Ícaro XXI system was completed, ending the proc<strong>es</strong>s<br />
that has allowed migrating from network architecture<br />
to a centralized architecture integrating all the information<br />
and functions, This architecture allows more<br />
control of the system from the logistical and management<br />
standpoints, thus facilitating the integrity and<br />
availability of the information.<br />
The transition of Ícaro 2000 to Ícaro XXI enabled reaching<br />
as many as 4,451 users, of whom 3,500 were users who<br />
connected to the system through the Internet in its Icaronet<br />
function, 430 were users who gained acc<strong>es</strong>s to the<br />
system through the user stations provided in ARO offi c<strong>es</strong><br />
of the airports and 450 were system operators.<br />
VCS SYSTEM (Voice Communications System) IN<br />
THE ACCs:<br />
Updating and deployment of the 2,4,T version VCS<br />
in the ACC of the Canary Islands and Palma de Ma-<br />
Annual report 2009 241