SOUTHERN REGION<br />

Expansion of the equipment room in the TWR<br />

in Malaga, The basic objectiv<strong>es</strong> of this plan are to fi t<br />

out spac<strong>es</strong>, undertake nec<strong>es</strong>sary renovations and dismantlement,<br />

in addition to revamping the electrical<br />

and mechanical faciliti<strong>es</strong>, for the eventual installation<br />

of the air navigation equipment associated with the<br />

projected demands of the future layout of the airport.<br />

2,6,3 IN-FLIGHT VERIFICATION<br />

The most relevant actions during 2009 were:<br />

IN-FLIGHT CALIBRATION:<br />

Preferential use of <strong>Aena</strong> Internacional’s In-Flight Verifi -<br />

cation Unit over other units that operated for <strong>Aena</strong> in<br />

this capacity: the agreed-upon number of hours to carry<br />

out with this unit for 2009 was exceeded.<br />

Permits for authorization fl ights at new faciliti<strong>es</strong><br />

and associated procedur<strong>es</strong>: The State Agency for Air<br />

Safety (AESA) obtained the abovementioned permits<br />

for the new unit of <strong>Aena</strong> Internacional, which will also<br />

allow the reports generated to be pr<strong>es</strong>ented at air<br />

navigation forums.<br />

Periodic Calibrations Plan<br />

The completion of 96,68% of the fl ights planned repr<strong>es</strong>ented<br />

the succ<strong>es</strong>sful accomplishment of the objectiv<strong>es</strong>.<br />

2,7 CNS/ATM SYSTEMS<br />

The main activiti<strong>es</strong> carried out during 2009 are d<strong>es</strong>cribed<br />

below by areas:<br />

2,7,1 AUTOMATION<br />

General information<br />

Air navigation<br />

Functional chang<strong>es</strong> in the SACTA, ÍCARO and<br />

SCV systems<br />

SACTA SYSTEM (Automated Air Traffi c Control<br />

System):<br />

Launching the 3,Z5 version of the SACTA System<br />

(Automated Air Traffi c Control System) at the TMAroute<br />

control centr<strong>es</strong> of the AN network (ACC Canari<strong>es</strong>,<br />

ACC Madrid, ACC Seville, ACC Barcelona,<br />

ACC Palma, TACC Valencia, Madrid-Barajas Tower,<br />

Barcelona Tower).<br />

Transition to opening of the new Terminal 1 at the<br />

Barcelona Tower, Adaptation of the SACTA System<br />

to the operation of the tower in the environs of the<br />

new airfi eld and launching the surface movement<br />

radar (SMR) service.<br />

ÍCARO System:<br />

The strategy of evolving the Ícaro 2000 system into the<br />

Ícaro XXI system was completed, ending the proc<strong>es</strong>s<br />

that has allowed migrating from network architecture<br />

to a centralized architecture integrating all the information<br />

and functions, This architecture allows more<br />

control of the system from the logistical and management<br />

standpoints, thus facilitating the integrity and<br />

availability of the information.<br />

The transition of Ícaro 2000 to Ícaro XXI enabled reaching<br />

as many as 4,451 users, of whom 3,500 were users who<br />

connected to the system through the Internet in its Icaronet<br />

function, 430 were users who gained acc<strong>es</strong>s to the<br />

system through the user stations provided in ARO offi c<strong>es</strong><br />

of the airports and 450 were system operators.<br />

VCS SYSTEM (Voice Communications System) IN<br />

THE ACCs:<br />

Updating and deployment of the 2,4,T version VCS<br />

in the ACC of the Canary Islands and Palma de Ma-<br />

Annual report 2009 241