2.4 continued<br />

Generating capacity<br />

Figure 2.4.4:<br />

Contracted background capacity mix<br />

GW (installed capacity)<br />

180<br />

160<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Figure 2.4.4 illustrates the capacity mix for the<br />

contracted background.<br />

Please note that as we continue to sign new<br />

connection agreements on an ongoing basis<br />

the latest TNQCU, which is available on the<br />

<strong>National</strong> <strong>Grid</strong> website, should be referred to<br />

for an updated position.<br />

Page 26<br />

2012<br />

2013<br />

2014<br />

Nuclear<br />

Onshore Wind<br />

2015<br />

2016<br />

2017<br />

2018<br />

2019<br />

2020<br />

Coal<br />

Other Renewables<br />

2021<br />

2022<br />

2023<br />

2024<br />

2025<br />

Gas/CHP<br />

Interconnector<br />

2026<br />

2027<br />

2028<br />

2029<br />

2030<br />

2031<br />

2032<br />

Offshore Wind<br />

Other (Oil/Pumped)