2.6 continued<br />

Renewables<br />

Figure 2.6.6:<br />

Marine contracted Vs scenarios<br />

GW<br />

4<br />

3<br />

2<br />

1<br />

0<br />

2.6.3<br />

Marine<br />

Figure 2.6.6 shows the current contracted position<br />

for marine (wave and tidal generation) against the<br />

requirement for marine generation under each of<br />

the three scenarios over the period to 2032.<br />

In the Gone Green scenario the level of marine<br />

generation capacity required in 2020, if the<br />

scenario is to be met, is 20 MW. The current<br />

level of marine generation capacity that is<br />

either existing or under construction is 7 MW,<br />

therefore leaving a total of 13 MW (of the 2 GW<br />

that is contracted with a signed connection<br />

agreement and completion date before 2020) to<br />

be connected to the transmission system by this<br />

Page 40<br />

2012<br />

2013<br />

2014<br />

Marine Existing<br />

2015<br />

2016<br />

2017<br />

2018<br />

2019<br />

2020<br />

2021<br />

2022<br />

2023<br />

2024<br />

Marine Under Construction<br />

Marine Awaiting Consent Marine Scoping<br />

2025<br />

2026<br />

2027<br />

2028<br />

2029<br />

2030<br />

point. By the end of the period the Gone Green<br />

scenario shows a marine generating capacity of<br />

around 1.3 GW.<br />

In Slow Progression, marine is assumed to<br />

develop very slowly due to high costs, with<br />

minimal deployment by 2030.<br />

2031<br />

Marine Consented<br />

In Accelerated Growth, there is a stronger build<br />

up of marine capacity, mainly post 2030.<br />

SP<br />

GG<br />

Apart from the 7 MW of existing or under<br />

construction capacity all marine generation is<br />

currently in the scoping phase.<br />

2032<br />