20.01.2013 Views

Innovations 2012

Innovations 2012

Innovations 2012

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sample applications<br />

Master-slave principle<br />

Up to 3 slave PDUs may be connected to<br />

one PDU.<br />

metered master<br />

switched master<br />

managed master<br />

Rittal <strong>Innovations</strong> <strong>2012</strong><br />

managed slave 1)<br />

Configuration example for a redundant network structure<br />

Monitoring across two separate networks. The leading system<br />

is configurable.<br />

CMC III<br />

IP network<br />

metered master<br />

switched master<br />

managed master<br />

CAN<br />

PDU – Power Distribution Unit<br />

Connection of CAN bus sensors<br />

Up to 4 additional CMC III CAN bus sensors may be connected<br />

to the PDU master for ambient monitoring (temperature, humidity,<br />

access, vandalism).<br />

IP network<br />

managed slave 1)<br />

1) Without display/network<br />

metered master<br />

switched master<br />

managed master<br />

CMC III sensors<br />

Up to 4 CAN bus components<br />

supported<br />

95

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!