Innovations 2012
Innovations 2012
Innovations 2012
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sample applications<br />
Master-slave principle<br />
Up to 3 slave PDUs may be connected to<br />
one PDU.<br />
metered master<br />
switched master<br />
managed master<br />
Rittal <strong>Innovations</strong> <strong>2012</strong><br />
managed slave 1)<br />
Configuration example for a redundant network structure<br />
Monitoring across two separate networks. The leading system<br />
is configurable.<br />
CMC III<br />
IP network<br />
metered master<br />
switched master<br />
managed master<br />
CAN<br />
PDU – Power Distribution Unit<br />
Connection of CAN bus sensors<br />
Up to 4 additional CMC III CAN bus sensors may be connected<br />
to the PDU master for ambient monitoring (temperature, humidity,<br />
access, vandalism).<br />
IP network<br />
managed slave 1)<br />
1) Without display/network<br />
metered master<br />
switched master<br />
managed master<br />
CMC III sensors<br />
Up to 4 CAN bus components<br />
supported<br />
95