Conclusion<br />

Interest in the DNRIS program fell during 2006-<br />

2007, due to the lower than average water<br />

allocations <strong>and</strong> the drought conditions experienced<br />

across the SIR. Three approved applications are<br />

current into the 2007-2008 financial year. A review<br />

of the DNRIS will be conducted during 2007-2008<br />

to determine its ongoing viability.<br />

Environmental Assessment for Primary <strong>and</strong><br />

Community Surface <strong>Water</strong> Management<br />

Systems<br />

Project Target<br />

Provide support, comment, reporting <strong>and</strong> report<br />

compilation from an environmental assessment<br />

perspective to the Primary <strong>and</strong> Community Surface<br />

<strong>Water</strong> Management Program <strong>and</strong> the Sub-surface<br />

Drainage Program, as required.<br />

Primary Program<br />

• Greens Swamp Management Plan.<br />

• Assisted in the development <strong>and</strong> overseeing<br />

of the writing of the Green Swamp<br />

Management Plan with consultants Sinclair<br />

Knight Merz (SKM), Tatura. Assisted in field<br />

work (transects) document comment, editing,<br />

l<strong>and</strong>holder visits <strong>and</strong> explanation <strong>and</strong> final<br />

individual l<strong>and</strong>holder works agreements.<br />

• Primary Surface <strong>Water</strong> Management System<br />

l<strong>and</strong>holder visits.<br />

• Approximately 32 l<strong>and</strong>holder or site visit days/<br />

half days conducted with G-MW <strong>and</strong> SKM<br />

on Murray Valley 11, Mosquito 40, Mosquito<br />

36, Mosquito 22. These visits consisted of<br />

discussion with l<strong>and</strong>holders re final design,<br />

alignment, placement, environmental issues,<br />

structures, revegetation.<br />

• Completed 21 Final Alignment Checks <strong>and</strong><br />

Realignment Checks that involved a response<br />

to G-MW. Majority of responses from Murray<br />

Valley 11, Muckatah Stage 8, Old Deakin 5P.<br />

• One Property Vegetation Plan completed<br />

jointly with DSE Benalla on Muckatah Main.<br />

• Two Surface <strong>Water</strong> Management System<br />

Planning Scheme Amendment Reviews<br />

conducted: Mosquito 40 <strong>and</strong> Deakin 16.<br />

Community Program<br />

• Two initial Environmental Assessments<br />

completed using the new format being a<br />

20-page document with several maps <strong>and</strong><br />

associated text: Muckatah 4/8P <strong>and</strong> Muckatah<br />

15P.<br />

• Community Surface <strong>Water</strong> Management<br />

Planning Works.<br />

• 15 Community Surface <strong>Water</strong> Management<br />

System realignment, l<strong>and</strong>holder meetings, site<br />

inspections.<br />

• Community Surface <strong>Water</strong> Management<br />

Program Planning Day.<br />

Irrigation Drain Management<br />

Targets<br />

• Drain Management & <strong>Water</strong> Quality<br />

Coordination - Support Irrigation Areas; input<br />

to Drainwatch; participate in working groups.<br />

• Irrigation Drainage Memor<strong>and</strong>um of<br />

Underst<strong>and</strong>ing implementation - Decision<br />

Support Systems for Key Performance<br />

Indicators & Management Actions <strong>and</strong><br />

<strong>Catchment</strong> Asset Operation Plans; Murray<br />

Valley Drain 13 project.<br />

• Installation of flow meters on drainage<br />

diversion pumps (approximately 10).<br />

Progress Towards Targets<br />

• Supported Irrigation Areas in drain diversion<br />

management; input to Drainwatch community<br />

monitoring program; input to Surface<br />

<strong>Water</strong> Management Systems review; review<br />

of drainage diversion agreements status;<br />

participated in working groups.<br />

• Implementation of Irrigation Drainage<br />

Memor<strong>and</strong>um of Underst<strong>and</strong>ing Decision<br />

Support System in <strong>Broken</strong> Creek catchment.<br />

Initial work on SIR <strong>Catchment</strong> Assessment<br />

Operational Plan to commence after final<br />

sign-off of Stanhope <strong>Catchment</strong> Assessment<br />

Operational Plan. Barmah-Nathalia<br />

<strong>Catchment</strong> Assessment Operational Plan to<br />

be done in conjunction with SIR <strong>Catchment</strong><br />

Assessment Operational Plan.<br />

• Flowmeters were purchased <strong>and</strong> installed on<br />

drain diversion pumps.<br />