Water, Land and People - Goulburn Broken Catchment ...
Water, Land and People - Goulburn Broken Catchment ...
Water, Land and People - Goulburn Broken Catchment ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Conclusion<br />
Interest in the DNRIS program fell during 2006-<br />
2007, due to the lower than average water<br />
allocations <strong>and</strong> the drought conditions experienced<br />
across the SIR. Three approved applications are<br />
current into the 2007-2008 financial year. A review<br />
of the DNRIS will be conducted during 2007-2008<br />
to determine its ongoing viability.<br />
Environmental Assessment for Primary <strong>and</strong><br />
Community Surface <strong>Water</strong> Management<br />
Systems<br />
Project Target<br />
Provide support, comment, reporting <strong>and</strong> report<br />
compilation from an environmental assessment<br />
perspective to the Primary <strong>and</strong> Community Surface<br />
<strong>Water</strong> Management Program <strong>and</strong> the Sub-surface<br />
Drainage Program, as required.<br />
Primary Program<br />
• Greens Swamp Management Plan.<br />
• Assisted in the development <strong>and</strong> overseeing<br />
of the writing of the Green Swamp<br />
Management Plan with consultants Sinclair<br />
Knight Merz (SKM), Tatura. Assisted in field<br />
work (transects) document comment, editing,<br />
l<strong>and</strong>holder visits <strong>and</strong> explanation <strong>and</strong> final<br />
individual l<strong>and</strong>holder works agreements.<br />
• Primary Surface <strong>Water</strong> Management System<br />
l<strong>and</strong>holder visits.<br />
• Approximately 32 l<strong>and</strong>holder or site visit days/<br />
half days conducted with G-MW <strong>and</strong> SKM<br />
on Murray Valley 11, Mosquito 40, Mosquito<br />
36, Mosquito 22. These visits consisted of<br />
discussion with l<strong>and</strong>holders re final design,<br />
alignment, placement, environmental issues,<br />
structures, revegetation.<br />
• Completed 21 Final Alignment Checks <strong>and</strong><br />
Realignment Checks that involved a response<br />
to G-MW. Majority of responses from Murray<br />
Valley 11, Muckatah Stage 8, Old Deakin 5P.<br />
• One Property Vegetation Plan completed<br />
jointly with DSE Benalla on Muckatah Main.<br />
• Two Surface <strong>Water</strong> Management System<br />
Planning Scheme Amendment Reviews<br />
conducted: Mosquito 40 <strong>and</strong> Deakin 16.<br />
Community Program<br />
• Two initial Environmental Assessments<br />
completed using the new format being a<br />
20-page document with several maps <strong>and</strong><br />
associated text: Muckatah 4/8P <strong>and</strong> Muckatah<br />
15P.<br />
• Community Surface <strong>Water</strong> Management<br />
Planning Works.<br />
• 15 Community Surface <strong>Water</strong> Management<br />
System realignment, l<strong>and</strong>holder meetings, site<br />
inspections.<br />
• Community Surface <strong>Water</strong> Management<br />
Program Planning Day.<br />
Irrigation Drain Management<br />
Targets<br />
• Drain Management & <strong>Water</strong> Quality<br />
Coordination - Support Irrigation Areas; input<br />
to Drainwatch; participate in working groups.<br />
• Irrigation Drainage Memor<strong>and</strong>um of<br />
Underst<strong>and</strong>ing implementation - Decision<br />
Support Systems for Key Performance<br />
Indicators & Management Actions <strong>and</strong><br />
<strong>Catchment</strong> Asset Operation Plans; Murray<br />
Valley Drain 13 project.<br />
• Installation of flow meters on drainage<br />
diversion pumps (approximately 10).<br />
Progress Towards Targets<br />
• Supported Irrigation Areas in drain diversion<br />
management; input to Drainwatch community<br />
monitoring program; input to Surface<br />
<strong>Water</strong> Management Systems review; review<br />
of drainage diversion agreements status;<br />
participated in working groups.<br />
• Implementation of Irrigation Drainage<br />
Memor<strong>and</strong>um of Underst<strong>and</strong>ing Decision<br />
Support System in <strong>Broken</strong> Creek catchment.<br />
Initial work on SIR <strong>Catchment</strong> Assessment<br />
Operational Plan to commence after final<br />
sign-off of Stanhope <strong>Catchment</strong> Assessment<br />
Operational Plan. Barmah-Nathalia<br />
<strong>Catchment</strong> Assessment Operational Plan to<br />
be done in conjunction with SIR <strong>Catchment</strong><br />
Assessment Operational Plan.<br />
• Flowmeters were purchased <strong>and</strong> installed on<br />
drain diversion pumps.<br />
PROGRAM REPORTS<br />
21