Bird hides for Gemmill’s Swamp were constructed<br />

under the Drought Employment Program.<br />

A number of priority wetl<strong>and</strong>s have been fenced to<br />

improve management.<br />

Priority wetl<strong>and</strong>s in the <strong>Catchment</strong> have been<br />

identified, based on their conservation significance<br />

<strong>and</strong> threats, to inform resource decision-making<br />

<strong>and</strong> guide the allocation of limited resources.<br />

A Wetl<strong>and</strong> Implementation Plan for lower <strong>Broken</strong><br />

to <strong>Goulburn</strong> River commenced.<br />

The Kanyapella Wetl<strong>and</strong> Management Plan was<br />

completed. This will assist l<strong>and</strong>owners <strong>and</strong> agencies<br />

identify weeds.<br />

Environmental Flows<br />

Given the potential for severe drought in 2007-<br />

2008, the GB CMA participated in planning how<br />

to share the potentially very limited available<br />

water. This included preparing a GB CMA dry<br />

inflow contingency plan which identified the critical<br />

environmental assets that needed to be protected<br />

under a survival scenario.<br />

Expert advice was obtained on the potential<br />

impacts of low flows on the <strong>Goulburn</strong> River<br />

below <strong>Goulburn</strong> Weir as part of the dry inflow<br />

contingency planning.<br />

A study into the environmental implications of<br />

high summer flows in the <strong>Goulburn</strong> River below<br />

<strong>Goulburn</strong> Weir was completed, setting limits to<br />

flows for different environmental impacts <strong>and</strong> levels<br />

of risk.<br />

A review of the Lower <strong>Goulburn</strong> <strong>Water</strong>way Plan<br />

<strong>and</strong> a review of the Kialla Streams Plan were<br />

completed.<br />

Studies were conducted on:<br />

• constraints to delivery of environmental<br />

flows in the <strong>Goulburn</strong> River <strong>and</strong> to the<br />

River Murray, finding that flooding <strong>and</strong><br />

high summer river flows were significant<br />

constraints.<br />

• the interaction between environmental<br />

flows <strong>and</strong> flooding. This included obtaining<br />

comprehensive l<strong>and</strong> surface elevation data<br />

for the <strong>Goulburn</strong> River <strong>and</strong> its floodplain.<br />

• the monitoring program to determine<br />

ecological response to environmental flow<br />

releases in the <strong>Goulburn</strong> River, <strong>Broken</strong> River<br />

<strong>and</strong> <strong>Broken</strong> Creek.<br />

The environmental condition of the <strong>Broken</strong> <strong>and</strong><br />

Boosey Creeks (as part of the assessment of<br />

the environmental impacts associated with the<br />

Tungamah Pipeline) was further benchmarked.<br />

An environmental flow determination for the<br />

upper <strong>Broken</strong> <strong>and</strong> Boosey Creeks was completed.<br />

Hydraulic modelling of flooding in the Barmah<br />

Forest progressed, with improved elevation data<br />

captured by airborne laser scanning <strong>and</strong> field<br />

surveys.<br />

Barmah Forest Environmental Management<br />

Plan<br />

In conjunction with Yorta Yorta students, a<br />

waterbird survey was carried out in Barmah Forest,<br />

resulting in the first recording of Brolga presence.<br />

The Barmah Forest Environmental Management<br />

Plan was updated, a new blueprint plan developed<br />

for future directions prepared, <strong>and</strong> a new vegetation<br />

monitoring program implemented.<br />

Weeds Booklet<br />

A weeds booklet was prepared to assist<br />

l<strong>and</strong>holders <strong>and</strong> agencies identify weeds which<br />

impact on the quality of riparian l<strong>and</strong>s <strong>and</strong> in-stream<br />

habitats. This information will be incorporated<br />

into the overall <strong>Goulburn</strong> <strong>Broken</strong> Weed booklet<br />

currently being reprinted as a third edition.<br />

RiverConnect - Shepparton Region<br />

A number of projects have been achieved through<br />

the RiverConnect Project including:<br />

• The GB CMA hosted 15 Australian National<br />

PROGRAM REPORTS<br />