Sr.<br />

No.<br />

KURRAM TANGI DAM PROJECT<br />

ABSTRACT OF COST ESTIMATES<br />

Description<br />

Local<br />

Component<br />

(Million Rs.)<br />

Foreign<br />

Component<br />

(Million Rs.)<br />

Total<br />

Amount<br />

(Million Rs.)<br />

A.<br />

Kaitu Weir and Affiliated<br />

Structures - (7.1)<br />

Main Dam, spillway, Power<br />

3,166.441 - 3,166.441<br />

B. Houses and Affiliated Structures -<br />

(7.2)<br />

11,510.822 - 11,510.822<br />

C.<br />

Thal Canal & Affiliated Structures<br />

- (7.3)<br />

6,655.758 - 6,655.758<br />

D.<br />

Remodeling of Existing Canals /<br />

Vials - (7.4)<br />

1,984.089 - 1,984.089<br />

E.<br />

Electrical & Mechanical<br />

Equipment - (7.5)<br />

- - -<br />

E-1. Power House No. 1 (36.5 MW) 575.331 3,002.477 3,577.808<br />

E-2. Power House No. 2 (11.0 MW) 185.762 969.437 1,155.199<br />

E-3. Power House No. 3 (17.0 MW) 285.408 1,489.459 1,774.868<br />

E-4. Power House No. 4 (18.5 MW) 299.594 1,563.489 1,863.083<br />

E-5. Power House No. 5 (400 Kw) 16.683 87.065 103.749<br />

E-6. Pump House 1.792 - 1.792<br />

E-7. Transmission Line 89.700 - 89.700<br />

Sub-Total of (E) 1,454.272 7,111.928 8,566.199<br />

F.<br />

Preliminary Works (Residential<br />

Colony, Office etc.)<br />

226.181 - 226.181<br />

Total of H = (A + B + C + D + E +<br />

F + G)<br />

24,997.562 7,111.928 32,109.490<br />

G.<br />

Land acquisition and resettlement<br />

cost<br />

2,790.500 - 2,790.500<br />

I. Physical Contingency at 3% of (H) 826.69 213.358 1,040.048<br />

J.<br />

Authority's Over heads 2.25% of<br />

(H).<br />

Engineering Services<br />

620.02 160.018 780.036<br />

K. (Construction Supervision and<br />

Design Reviews) 3% of (H).<br />

826.69 213.358 1,040.048<br />

L. Security Arrangements etc. 3,619.000 - 3,619.000<br />

M. Furniture, T&P, Vehicles etc. 201.526 - 201.526<br />

Total N = (H + I + J + K + L + M) 33,881.986 7,698.662 41,580.648<br />

Total Base Cost 33,881.986 7,698.662 41,580.648<br />

O<br />

Escalation (local 6.5%, <strong>for</strong>eign<br />

2.5%)<br />

1640.45 375.310 2,015.760<br />

Total cost<br />

IDC (14.23% & 3% Financal Risk)<br />

35,522.436 8,073.972 43,596.408<br />

P as per Planning Commission<br />

Instructions<br />

13,710.560 2,124.030 15,834.590<br />

Note:-<br />

Grand Total 49,232.996 10,198.002 59,430.998<br />

US$ 699 Million<br />

(i) Increased 15% on Works as Tribal Commission<br />

(ii) Increased Security Arrangement Cost as per FWO Estimates<br />

(iii) Increased IDC(14.23%) and 3% Financial Risk as per Planning Commission Guidelines.<br />

22