ALLAI KHWAR HYDROPOWER PROJECT<br />

♦ Location On Allai Khwar, Left Tributary of Indus River near Besham<br />

in District Battagram, Khyber Pakhtunkhwa<br />

♦ Salient Features � Dam Height<br />

� Length of Headrace<br />

� Installed Capacity<br />

� Annual Energy<br />

� Gross Head<br />

� Objectives<br />

� EIRR<br />

32.50m<br />

2366 m<br />

121 MW<br />

463 GWh<br />

697 m<br />

To Generate Electricity<br />

23.97%<br />

♦ Execution by WAPDA<br />

♦ Consultants HHH Consultants NDC, LAHMEYER, BARQAAB,<br />

BAK, PES, EGC, RC, IDC & DMC<br />

♦ Contractor<br />

DEC Astron, VA Tech<br />

♦ Donor Agency Government of Pakistan<br />

♦ Date of Commencement June, 2003<br />

♦ Date of Completion Actual Jan 2009 / Revised Oct,2011<br />

Expected Oct, 2012<br />

♦ Financial Status Local FEC F/LOAN Total (Rs. M)<br />

Original PC-I Cost 5,124.284 3,453.540 - 8,577.824<br />

Revised PC-I Cost 7,312.687 6,522.261 - 13,834.948<br />

Expenditures upto 30.6.2012 5,261.974 3,327.478 2,315.596 10,905.048<br />

PSDP Allocation 2012-2013 804.000 725.000 644.000 2,173.000<br />

Expenditure During the Month 3.868 35.268 101.801 140.937<br />

Current F/Y Expenditure 6.868 197.706 179.534 384.108<br />

Upto date Expenditure 5,268.842 3,525.184 2,495.130 11,289.156<br />

o Physical Progress 94.00% against 98.00%<br />

o Financial Progress 81.60% against 81.44%<br />

Revised PC-I amounting to Rs. 13834.948 Million approved on 27.09.2011.<br />