REPAIR & MAINTENANCE OF TARBELA POWER<br />
STATION<br />
Tarbela Dam is one of the world’s largest earth and rock filled dam. It is one of the world<br />
greatest resources development projects built on one of the world’s largest river Indus called<br />
Abbasin or Father of Rivers. Tarbela Power Station is located on the right bank of river Indus.<br />
Power Station is equipped with fourteen generating units having total capacity of 3478 MW. It<br />
is the biggest hydel power station completed in four phases since 1977 to 1993-93.<br />
The total power potential of the station is 3478 MW with 14 generating units constitutes about<br />
25~35% of the total power presently generated in the country.<br />
The existing equipment of Tarbela Power Station are in service since commissioning and<br />
reliability of most of the equipment have considerably been reduced and the station<br />
desperately require planned repair and maintenance programme.<br />
The planned repair and maintenance programme will enhance reliability and will ensure<br />
smooth operation of the station by minimizing prolonged and <strong>for</strong>ced outages in one way or the<br />
other. The sever power crises in the prevailing situation have created energy crises and<br />
ultimately lead to public unrest and put the country economic stability at stake due to<br />
prolonged interruption.<br />
The procurement of spares/equipment demanded under additional requirement will enhance<br />
the reliability of the station in the following manner :<br />
• Help to improve the reliability factor of the plant.<br />
• To minimize <strong>for</strong>ced outages.<br />
• Help to reduce the energy crises.<br />
• To improve the availability of units.<br />
• Will enhance the life of units.<br />
The close analysis shows that the proposed R&M programme of Tarbela Power Station will<br />
earn WAPDA 1973 Million KWH per month or Rs.19730 Million/US$ 232 Million per month.<br />
� If power trans<strong>for</strong>mer of Units 1~10 goes out of order due to some fault, the relevant unit<br />
will also remain out till the availability of the trans<strong>for</strong>mer. The authority in shape of<br />
revenue will suffer 0.412 Million US$ per day and the station utilization factor will also<br />
go down by 5% at least.<br />
Similarly, if power trans<strong>for</strong>mer of any unit from Units 11~14 goes out or order due to<br />
fault then the authority will suffer by a loss of 0.819 Million US$ per day till the<br />
availability of new power trans<strong>for</strong>mer.<br />
� If 220KV breaker of unit is develops fault, the relevant unit will remain out till the<br />
availability of breaker. The station and authority will suffer 0.412 Million US$ per day till<br />
the availability of the breaker. Also utilization factor of the station will reduce by 5% at<br />
least. Similarly if breaker of 220KV transmission line develops fault, the station and<br />
authority will suffer a revenue loss of 0.37 Million US$ per day till the availability of the<br />
breaker.<br />
� If stator core of a unit is damaged, then the authority will duffer a revenue loss of 0.412<br />
Million US$ per day till the availability and erection of the new stator.<br />
� If 2 Nos. 30 ton bridge cranes <strong>for</strong> lifting the rotor of Units 1~10 goes out of order, then<br />
no alternate arrangement is available <strong>for</strong> lifting the rotor and the unit will remain out till<br />