REPAIR & MAINTENANCE OF TARBELA POWER<br />

STATION<br />

Tarbela Dam is one of the world’s largest earth and rock filled dam. It is one of the world<br />

greatest resources development projects built on one of the world’s largest river Indus called<br />

Abbasin or Father of Rivers. Tarbela Power Station is located on the right bank of river Indus.<br />

Power Station is equipped with fourteen generating units having total capacity of 3478 MW. It<br />

is the biggest hydel power station completed in four phases since 1977 to 1993-93.<br />

The total power potential of the station is 3478 MW with 14 generating units constitutes about<br />

25~35% of the total power presently generated in the country.<br />

The existing equipment of Tarbela Power Station are in service since commissioning and<br />

reliability of most of the equipment have considerably been reduced and the station<br />

desperately require planned repair and maintenance programme.<br />

The planned repair and maintenance programme will enhance reliability and will ensure<br />

smooth operation of the station by minimizing prolonged and <strong>for</strong>ced outages in one way or the<br />

other. The sever power crises in the prevailing situation have created energy crises and<br />

ultimately lead to public unrest and put the country economic stability at stake due to<br />

prolonged interruption.<br />

The procurement of spares/equipment demanded under additional requirement will enhance<br />

the reliability of the station in the following manner :<br />

• Help to improve the reliability factor of the plant.<br />

• To minimize <strong>for</strong>ced outages.<br />

• Help to reduce the energy crises.<br />

• To improve the availability of units.<br />

• Will enhance the life of units.<br />

The close analysis shows that the proposed R&M programme of Tarbela Power Station will<br />

earn WAPDA 1973 Million KWH per month or Rs.19730 Million/US$ 232 Million per month.<br />

� If power trans<strong>for</strong>mer of Units 1~10 goes out of order due to some fault, the relevant unit<br />

will also remain out till the availability of the trans<strong>for</strong>mer. The authority in shape of<br />

revenue will suffer 0.412 Million US$ per day and the station utilization factor will also<br />

go down by 5% at least.<br />

Similarly, if power trans<strong>for</strong>mer of any unit from Units 11~14 goes out or order due to<br />

fault then the authority will suffer by a loss of 0.819 Million US$ per day till the<br />

availability of new power trans<strong>for</strong>mer.<br />

� If 220KV breaker of unit is develops fault, the relevant unit will remain out till the<br />

availability of breaker. The station and authority will suffer 0.412 Million US$ per day till<br />

the availability of the breaker. Also utilization factor of the station will reduce by 5% at<br />

least. Similarly if breaker of 220KV transmission line develops fault, the station and<br />

authority will suffer a revenue loss of 0.37 Million US$ per day till the availability of the<br />

breaker.<br />

� If stator core of a unit is damaged, then the authority will duffer a revenue loss of 0.412<br />

Million US$ per day till the availability and erection of the new stator.<br />

� If 2 Nos. 30 ton bridge cranes <strong>for</strong> lifting the rotor of Units 1~10 goes out of order, then<br />

no alternate arrangement is available <strong>for</strong> lifting the rotor and the unit will remain out till<br />