Proposed Project for USAID - Wapda
Proposed Project for USAID - Wapda
Proposed Project for USAID - Wapda
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PELAR DAM PROJECT<br />
LOCATION<br />
The dam site is located about 160 kms from Awaran Town in District Awaran (Balochistan).<br />
OBJECTIVES<br />
- Storage of flood water <strong>for</strong> irrigated agriculture development of 25,650 acres of culturable<br />
command area.<br />
- Hydropower generation of 300 KW.<br />
- Socio-economic uplift, poverty reduction and women emancipation.<br />
SALIENT FEATURES<br />
– Type of Dam Concrete Gravity<br />
– Height of Dam 60 ft<br />
– Length of Dam 714 ft<br />
– Reservoir Capacity 99,175 AF<br />
– Culturable Command Area 25,650 acres<br />
– Power Generation 300 KW<br />
– Revised <strong>Project</strong> Cost Rs.8.740 billion<br />
CURRENT STATUS<br />
• PC-I amounting to Rs. 1.692 Billion approved by ECNEC in its meeting held on<br />
September 3, 2009.<br />
• Tenders of Pelar Dam on EPC basis invited on Sep. 30, Nov 12, 2009, Feb. 20,<br />
March 17, October 27 and December 29, 2010. No bid received.<br />
• WAPDA proposed the <strong>Project</strong> through local District contractors by subletting the<br />
various components to increase participation of the local community; local<br />
monetary benefits.<br />
• Government of Balochistan suggested transferring the <strong>Project</strong> to I & P Department<br />
of Balochistan <strong>for</strong> execution.<br />
• Revised PC-I is under preparation.<br />
• Funds amounting to Rs. 50 Million allocated in PSDP 2012-13 against a demand of<br />
Rs. 1,000 Million.<br />
28