PROJECTS FOR <strong>USAID</strong><br />

ASSISTANCE<br />

(ONGOING – NEW)<br />

FOR 2012-2017<br />

October 2012<br />

1


CONTENTS<br />

DESCRIPTION PAGE<br />

WATER AND POWER SECTOR DEVELOPMENT ........................................................................................ 4<br />

ONGOING AND NEW PROJECTS PROPOSED FOR <strong>USAID</strong> ASSISTANCE .................................................. 5<br />

GOMAL ZAM DAM PROJECT...................................................................................................................... 7<br />

SATPARA DAM PROJECT ........................................................................................................................ 10<br />

REPAIR AND MAINTENANCE OF UNITS 1, 3 & 4 OF TARBELA DAM ........................................................ 12<br />

NEW PROJECTS FOR US ASSISTANCE .................................................................................................. 14<br />

DIAMER BASHA DAM PROJECT .............................................................................................................. 16<br />

KURRAM TANGI DAM MULTIPURPOSE PROJECT ................................................................................... 21<br />

DARAWAT DAM PROJECT ....................................................................................................................... 23<br />

NAI GAJ DAM PROJECT........................................................................................................................... 25<br />

NAULONG DAM PROJECT ....................................................................................................................... 26<br />

GARUK DAM PROJECT ............................................................................................................................ 27<br />

PELAR DAM PROJECT ............................................................................................................................. 28<br />

ALLAI KHWAR HYDROPOWER PROJECT ................................................................................................ 30<br />

DUBER KHWAR HYDROPOWER PROJECT ............................................................................................. 32<br />

KHAN KHWAR HYDROPOWER PROJECT ................................................................................................ 34<br />

REPAIR & MAINTENANCE OF TARBELA POWER STATION ..................................................................... 37<br />

UP-GRADATION AND REFURBISHMENT OF GENERATING UNITS OF MANGLA POWER STATION ........ 39<br />

UP-GRADATION, REHABILITATION AND MODERNIZATION OF WARSAK HYDROELECTRIC POWER<br />

STATION .................................................................................................................................................. 40<br />

APPOINTMENT OF GENERAL CONSULTANTS ........................................................................................ 41<br />

TRAINING & CAPACITY BUILDING – US$ 21 Million .................................................................................. 42<br />

TREATMENT OF EFFLUENT WATER OF RBOD ....................................................................................... 43<br />

SUMMARY OF <strong>USAID</strong> FINANCIAL ASSISTANCE COMMITTED ................................................................. 44<br />

SUMMARY OF <strong>USAID</strong> FINANCIAL ASSISTANCE REQUESTED ................................................................. 44<br />

JOINT WAPDA <strong>USAID</strong> TASK FORCE ON THE PROJECTS ........................................................................ 45<br />

EXISTING INSTALLED GENERATION CAPACITY ..................................................................................... 46<br />

EXISTING INSTALLED GENERATION CAPACITY ..................................................................................... 46<br />

PEAK DEMAND PROJECTIONS (WHOLE COUNTRY) 2009–2030 ............................................................. 47<br />

www.wapda.gov.pk<br />

2


VISION<br />

� Pakistan’s Vision about Development of Water Resources is the optimum utilization of Water<br />

Resources <strong>for</strong> irrigation and generation of Energy <strong>for</strong> sustainable Economic Growth<br />

GOALS<br />

� Development of projects in water sector <strong>for</strong> irrigation, flood control, water supply and drainage.<br />

� Development of projects in power sector <strong>for</strong> generation, transmission and distribution of power.<br />

� Prevention of Water-logging, salinity and reclamation of Waterlogged and saline land.<br />

� Flood Mitigation.<br />

� Conservation of Water – High Efficiency Micro Irrigation Water Techniques.<br />

� Inland Waterways Navigation<br />

� Transfer of technology through expertise in Water & Power sectors.<br />

� Full Cost Recovery.<br />

� Subsidies reduction<br />

PRIORITIES<br />

Establishment of Large Reservoirs - Request <strong>for</strong> <strong>USAID</strong><br />

� Diamer-Basha Dam (6.4 MAF Live Storage, 4500 MW Power, 19 Billion Units)<br />

� Kurram Tangi (0.90 MAF Live Storage, 83.4 MW Power)<br />

Ongoing Hydel Power <strong>Project</strong>s – under <strong>USAID</strong><br />

� Gomal Zam <strong>Project</strong> US$ 80 Million (US$ 55.589 M released so far)<br />

� Waran Canal (Under Gomal Zam) US$ 12 Million<br />

� Satpara Dam US$ 26 Million (US$ 21.485 M released so far)<br />

� Upgradation & Rehabilitation of<br />

Tarbela Power Units US$ 16.5 M (US$ 10.210 M released so far)<br />

<strong>Proposed</strong>/New Hydel Power <strong>Project</strong>s<br />

Provision of US$ 54 Million would add 417 MW of cheap Hydropower to National Grid.<br />

� Allai Khwar Hydropower <strong>Project</strong> (121 MW) – US$ 26 M to complete the project<br />

� Duber Khwar Hydropower <strong>Project</strong> (130 MW) – US$ 20 M to complete the project<br />

� Khan Khwar Hydropower <strong>Project</strong> (72 MW) – US$ 4 M to complete the project<br />

� Jinnah Hydropower <strong>Project</strong> (96 MW) – US$ 4 M to complete the project<br />

� Upgradation of Mangla Power House<br />

� Rehabilitation of Warsak Hydel <strong>Project</strong><br />

� Munda Dam – (1.3 MAF)<br />

Increase Water Efficiency<br />

� Introduction of high level micro irrigation techniques (Drip & Sprinkle Irrigation System)<br />

� Treatment of Effluent Water of RBOD<br />

� Canal Lining<br />

� Establishment of underground water reservoirs<br />

Technical Assistance<br />

� Appointment of services of General Consultants<br />

� Capacity building of WAPDA staff by strengthening and upgradation of training institutes of WAPDA<br />

(Staff College, Engineering Academy).<br />

� Training of WAPDA officers/staff in USA & Pakistan through exchange programme<br />

� Remote Sensing to assess the Hydrology, Glacial Melt under Global Warming.<br />

3


WATER AND POWER SECTOR DEVELOPMENT<br />

� Irrigated agriculture is the backbone of Pakistan's economy. The agriculture sector is the major user of water<br />

and its consumption will continue to dominate the water requirements. Direct rainfall contributes less than 15<br />

percent of the water supplied to the crops. The major user of water <strong>for</strong> irrigation is the Indus Basin Irrigation<br />

System. About 105 Million Acres Feet (MAF) out of 155 MAF of surface water is being diverted annually <strong>for</strong><br />

irrigation while around 48 MAF is pumped from ground.<br />

� Pakistan has a total of 197 million acres (MA) area out of which 73 MA is cultivable. The cultivated area<br />

(Irrigated & Barani) is 52 MA, whereas 48 MA is irrigated. With large cultivable land base of 73 MA of which<br />

only 27 MA is canal commanded, Pakistan still has the potential of bringing about 20 MA of rain fed land<br />

under irrigation.<br />

� With increased population, Pakistan is fast heading towards a situation of serious water crises. Per capita<br />

surface water availability was 5,260 cubic meters in 1951 when population was 34 million, which has reduced<br />

to 1,038 cubic meter in 2010 when the estimated population is 172 million.<br />

� Due to excessive sediment inflows in the river water, all the three storages (Tarbela, Mangla, Chashma) are<br />

rapidly losing their capacities. By the year 2025, these storages would lose 37% (6.27 MAF) of their capacity<br />

which virtually means loss of one mega storage project.<br />

� An annual average of over 32 MAF water escapes below Kotri varying from 0.3 to 92 MAF. However this<br />

surplus water is available <strong>for</strong> about 70-100 days of summers only. To save and utilize available water,<br />

construction of additional storage facilities is essential <strong>for</strong> sustainable irrigated agriculture which supports<br />

about 70% of the population of Pakistan.<br />

� At present the installed power generation capacity is 20,982 MW. However, the dependable capacity is<br />

19,421 MW out of which 6,516 is being produced through Hydropower, 3,580 by Government (GENCOs),<br />

9637 by Independent Private Power Producers (IPPs) and Private Rental. Gap in demand and supply which<br />

rose to 5,000 MW in summer depicts acute power crises. The demand of power is currently about 20,000<br />

MW which will rise to 36,000 MW in the year 2015. In order to bridge the energy gap the new hydropower<br />

projects are of vital importance.<br />

� At present the hydel/thermal mix is 32:68% whereas it should be the other way round. Though induction of<br />

thermal generation initially helped in overcoming load shedding, it resulted in substantial increase in power<br />

tariff. There<strong>for</strong>e, a sizeable injection of cheaper hydropower through multipurpose storages is the only viable<br />

option to keep the cost of electricity within af<strong>for</strong>dable limits.<br />

� It is an economically unsustainable fact that the total water storages capacity in the country is only 15 MAF<br />

representing 13% of the total annual flows of 136 MAF. To address this problem the Government of Pakistan<br />

(GoP) is developing feasibility and detailed engineering studies <strong>for</strong> nearly 20 MAF of water storage and<br />

25,000 MW of hydel power.<br />

� To facilitate the process of economic development and to ensure greater economic and social stabilization in<br />

Pakistan, it is imperative that employment creation and poverty reduction issues are addressed on priority.<br />

Additional water storages and power generation would <strong>for</strong>m the basis of this strategy during the next decade.<br />

In the next few years: (i) Construction of large dams including Diamer-Basha during 2011 (ii)<br />

Construction of Medium/Small Water Storage Dams (iii) Construction of Canals (iv) Construction of<br />

Transmission Lines <strong>for</strong> dispersal of Power from Hydropower <strong>Project</strong> to Load Centres of National Grid<br />

would be priority issues. These projects would create additional water storages, generate cheap<br />

indigenously developed electricity and prevent flood damages. All these measures would also ensure food<br />

security, employment generation and above all poverty alleviation.<br />

� Due to financial constraints, WAPDA has received only Rs. 9.5 billion out of its allocation of Rs. 27.5 billion<br />

under the PSDP <strong>for</strong> the year 2009-10 which indicates that the ongoing projects would be delayed, resulting in<br />

cost overrun and denying the desired benefits. The financial constraints continued in FY 2010-11 and 2011-<br />

12 when PSDP was reduced from Rs.15.365 Billion to Rs.9.693 Billion and Rs.20.115 Billion out of which<br />

11.977 Billion has been released so far. In view of this financial constraint, WAPDA has made ef<strong>for</strong>ts in<br />

generating financial resources during the current year <strong>for</strong> its projects which are of critical national importance.<br />

<strong>USAID</strong> has signed agreement with WAPDA Repair and Maintenance of Units 1,3 &4 of Tarbela Power House<br />

US$ 16.5 million in year 2010. Besides it also signed Gomal Zam (Power & Irrigation Portion) and Satpara<br />

Dam (Power Portion) on 7.1.2011 & 5.10.2011 <strong>for</strong> providing US$ 80 million and US$ 26 million<br />

respectively. <strong>USAID</strong> has released US$ 50.089 million <strong>for</strong> Gomal Zam Dam, US$ 21.485 Million <strong>for</strong><br />

Satpara Dam <strong>Project</strong> and US$ 10.210 Million <strong>for</strong> Repair & Maintenance of Units 1,3 & 4 of Tarbela Dam<br />

<strong>Project</strong>. The assistance from <strong>USAID</strong> came at the most appropriate time helping WAPDA to complete these<br />

projects. In addition WAPDA has proposed Diamer Basha Dam, Kurram Tangi Dam, Upgradation of Mangla<br />

and Warsak Power Stations and Training and Capacity Building as new projects <strong>for</strong> the assistance from<br />

<strong>USAID</strong>.<br />

4


ONGOING AND NEW PROJECTS PROPOSED FOR <strong>USAID</strong><br />

ASSISTANCE<br />

(US$ in Millions<br />

S# Name of <strong>Project</strong> Total Cost<br />

A. Under Implementation (2010-11)<br />

Gomal Zam Dam (South Waziristan)<br />

Agreements signed on 7.1.2011 (US$<br />

40 M) <strong>for</strong> Dam Portion, 5.10.2011 (US$<br />

1<br />

40 M) <strong>for</strong> Irrigation Portion and<br />

30.7.2012 (US$ 12 M) <strong>for</strong> Waran Canal<br />

System<br />

Satpara Dam (Gilgit-Baltistan)<br />

2 Agreements signed on 7.1.2011 (US$<br />

26 M)<br />

Repair and Maintenance of Units 1, 3 & 4<br />

Of Tarbela Dam<br />

3<br />

Agreements signed in May 2010 (US$<br />

16.5 M)<br />

B. <strong>Proposed</strong> New <strong>Project</strong>s <strong>for</strong> <strong>USAID</strong> (2012-13)<br />

Diamer Basha Dam (NWFP.Gilgit<br />

1<br />

Baltistan)<br />

2 Kurram Tangi Dam (North Waziristan)<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

Darawat Dam<br />

(Jamshoro, Sindh)<br />

Nai Gaj Dam<br />

(Dadu, Sindh)<br />

Naulong Dam<br />

(Jhal Magsi, Balochistan)<br />

Garuk Dam<br />

(Kharan, Balochistan)<br />

Pelar Dam<br />

(Awaran, Balochistan)<br />

Allai Khwar Hydropower <strong>Project</strong><br />

(Battagram, Khyber Pakhtunkhwa)<br />

Duber Khwar Hydrpower <strong>Project</strong><br />

(Shangla, Khyber Pakhtunkhwa)<br />

Khan Khwar Hydropower <strong>Project</strong><br />

(Kohistan, Khyber Pakhtunkhwa)<br />

Jinnah Hydropower <strong>Project</strong><br />

(Mianwali, Punjab)<br />

Repair and Maintenance of Tarbela<br />

Power Station (KPK)<br />

Upgradation (E&M)* of Mangla Hydel<br />

Power Station (AJK)<br />

Upgradation (E&M)*of Warsak Hydel<br />

Power Station (KPK)<br />

15 Appointment of General Consultants<br />

16 Training & Capacity Building<br />

$ 150<br />

Rs 12.8<br />

$ 52<br />

Rs 4.4<br />

$ 320<br />

Rs 27.2<br />

$ 11178<br />

Rs 950.0<br />

$ 700<br />

Rs 59.0<br />

$ 104<br />

Rs.9.394<br />

$ 292<br />

Rs 26.240<br />

$ 177<br />

Rs 18.0<br />

$ 73<br />

Rs 6.85<br />

$ 93<br />

Rs 8.740<br />

$ 143<br />

Rs. 8.578<br />

$ 272<br />

Rs. 16.324<br />

$ 138<br />

Rs. 8.301<br />

$ 226<br />

Rs. 13.547<br />

$ 100<br />

Rs 9.0<br />

$ 508<br />

Rs 42.5<br />

$ 308<br />

Rs 25.5<br />

$ 50<br />

Rs 4.2<br />

$ 21<br />

Rs 1.8<br />

PSDP<br />

Allocation <strong>for</strong><br />

2012-13<br />

(Rs)<br />

0.8<br />

0.2<br />

PSDP<br />

Releases<br />

so far<br />

(Rs)<br />

-<br />

TOTAL (A)<br />

18.0 2.9<br />

0.1 0.1<br />

2.0 -<br />

2.0 -<br />

1.5 -<br />

0.050 -<br />

2.173 -<br />

3.859 -<br />

-<br />

- -<br />

1.032 -<br />

-<br />

- -<br />

- -<br />

- -<br />

- -<br />

TOTAL<br />

(B)<br />

G.<br />

TOTAL;<br />

Rs in Billions)<br />

Request <strong>for</strong> <strong>USAID</strong><br />

Funds during 2011-12 &<br />

2012-13/ Released so far<br />

$ 92.0<br />

Rs 8.0<br />

US$ 55.089 M Released<br />

$<br />

Rs<br />

US$ 21.485 M Released<br />

$<br />

Rs<br />

US$ 11.250 M Released<br />

<strong>USAID</strong> Assistance requested <strong>for</strong> ongoing projects Year 2011-12 US$ 92 Million<br />

Rs 8.0 Billion<br />

<strong>USAID</strong> Assistance requested <strong>for</strong> ongoing/ new projects (2012-17) US$ 3323 Million<br />

Rs 316 Billion<br />

$ 92<br />

Rs 8.0<br />

$ 200<br />

Rs 17.0<br />

$ 2<br />

Rs 0.17<br />

$<br />

Rs<br />

$<br />

Rs<br />

$<br />

Rs<br />

$<br />

Rs<br />

$<br />

Rs<br />

$<br />

Rs<br />

$<br />

Rs<br />

$<br />

Rs<br />

$<br />

Rs<br />

$ 8.5<br />

Rs0.77<br />

$ 2<br />

Rs 0.17<br />

$ 2<br />

Rs 0.17<br />

$<br />

Rs<br />

$<br />

Rs<br />

$ 218<br />

Rs 18.6<br />

$ 298<br />

Rs 25.4<br />

5


GOMAL ZAM DAM PROJECT<br />

Location On Gomal river in South Waziristan Agency, West of Tank and D.I.Khan District of Khyber<br />

Pakhtunkhwa..<br />

This project is located at Khajuri Kach on Gomal River in South Waziristan Agency about 60 km west<br />

of Tank and being constructed as a Rein<strong>for</strong>ced Cement Concrete (RCC) dam. WAPDA has conceived<br />

this project <strong>for</strong> the uplift of Tribal Areas particularly of South Waziristan Agency. This dam will store<br />

1 MAF of water and irrigate 163,000 Acres of land, besides generating 17 MW of electricity. The<br />

project has been awarded to M/s Frontier Works Organization (FWO) of the Army, M/s Sinohydro<br />

(China) and M/s TEKSER (Turkey) are its joint partners. To execute a development project in militant<br />

infested area of South Waziristan, was a difficult task but WAPDA and its partners made all-out ef<strong>for</strong>ts<br />

<strong>for</strong> the continuation of work on this project. It is near completion as almost 90% work is completed. Due<br />

to paucity of development funds, completion could not be achieved. An additional funding of Rs3.0<br />

billion/US$35 million would complete this project to bring significant impact on the people of South<br />

Waziristan to generate economic activity, conducive <strong>for</strong> peace and catalyst <strong>for</strong> national production.<br />

♦ Salient Features<br />

� Type<br />

� Height of Dam<br />

� Length of Dam<br />

� Length of Main Canal<br />

� Length of Distributaries<br />

� Gross Storage<br />

� Live Storage<br />

� Command Area<br />

� Power Generation<br />

� EIRR<br />

♦ Date of Commencement Actual July 2002 / Revised June 2007<br />

RCC Gravity Dam<br />

437 ft<br />

758 ft<br />

63 km<br />

203 km<br />

1.140 MAF<br />

0.892 MAF<br />

163,086 Acres<br />

17.4 MW / 90.9 Gwh<br />

12%<br />

♦ Date of Completion Actual Sep 2006 / Revised Jan. 2013<br />

♦ Financial Status Local Foreign Total (Rs. Million)<br />

Approved PC-I Cost 7,865.000 4,964.000 12,829.000<br />

Expenditures upto 30.06.2012 8,934.312 3,317.936 12,252.248<br />

PSDP Allocation <strong>for</strong> 2012-2013 1,000.000 800.000 1,800.000<br />

Expenditures during the Month 22.961 365.477 388.438<br />

Current F/Y Expenditures 43.703 365.477 409.180<br />

Total Expenditures 8,978.015 3,683.413 12,661.428<br />

− Contract re-awarded to FWO on 09.03.2007 at a cost of Rs. 10,400.634 Million (equivalent to US$ 171.063 M).<br />

o Physical Progress 81.67 % against 96.26 %<br />

o Financial Progress 98.69 % against 97.84 %<br />

<strong>USAID</strong> has signed agreements with WAPDA to provide US$ 40 Million <strong>for</strong> the Power Portion of<br />

Gomal Zam Dam on 07.01.2011, US$ 40 Million <strong>for</strong> Irrigation Portion on 05.10.2011 and US$ 12<br />

Million <strong>for</strong> Waran Canal (under Gomal Zam Dam <strong>Project</strong>) on 30.07.2012.<br />

<strong>USAID</strong> has released US$ 55.089 Million so far.<br />

7


US DELEGATION VISIT TO GOMAL ZAM DAM<br />

8


SATPARA DAM PROJECT<br />

9


SATPARA DAM PROJECT<br />

♦ Location Downstream of Satpara Lake on Satpara Nullah near Skardu,<br />

Northern Area, about 6 miles south of Skardu Town<br />

Satpara Dam <strong>Project</strong> is one of the highest situated dams in the world and is located near Skardu city in<br />

Gilgit-Baltistan. This dam has a storage capacity of 93,000 Acres Feet of water whereas the command<br />

area consists of 15,536 Acres and it will generate 17.3 MW of electricity on completion. This dam was<br />

conceived to provide water and power in Skardu City (Baltistan). This area is suitable <strong>for</strong> producing<br />

vegetables & fruits and this project will play significant role in the social and economic uplift of Skardu<br />

area (Baltistan).<br />

♦ Salient Features � Type of Dam<br />

� Height of dam<br />

� Length of dam<br />

� Gross Storage<br />

� Live Storage<br />

� Command Area<br />

� Power Generation<br />

� EIRR<br />

Earth Fill<br />

128 Ft<br />

560 Ft<br />

0.093 MAF<br />

0.053 MAF<br />

15536 Acres<br />

17.3 MW/ 105.51 Gwh<br />

12.9%<br />

♦ Commencement Date As per Original PC-I Sep, 2002 / Actual April 2003<br />

♦ Completion Date Actual / Revised Actual Dec 2006/Revised Jan. 2012 (P/H # 3&4 Feb. 13)<br />

♦ Financial Status Local Foreign Total (Rs. Million)<br />

Rev: Approved PC-I Cost (03.09.09) 3,925.342 554.679 4,480.021<br />

Expenditures upto 30.06.2012 2900.033 1917.627 4817.660<br />

PSDP Allocation <strong>for</strong> 2012-2013 100.000 200.000 300.000<br />

Expenditures during the Month 3.949 - 3.949<br />

Current F/Y Expenditures 8.929 - 8.929<br />

Upto date Expenditures 2,908.962 1917.627 4,826.589<br />

o Physical Progress 100% against 100% (P/H # 3&4 80.43 % against 87.00%)<br />

o Financial Progress 107.74 % against 100 %<br />

<strong>USAID</strong> has signed an agreement with WAPDA to provide US$ 26 Million <strong>for</strong> Satpara Dam <strong>Project</strong><br />

on 07.01.2011.<br />

<strong>USAID</strong> has released US$ 21.485 Million so far.<br />

10


US DELGATION VISIT TO SATPAR DAM<br />

11


REPAIR AND MAINTENANCE OF UNITS 1, 3 & 4 OF<br />

TARBELA DAM<br />

WAPDA operates Tarbela Hydroelectric Power Station having total installed capacity of 3478<br />

MW from 14 Generating Units installed on three Power Tunnels. The plant is capable to<br />

deliver upto 3700 MW during high flow months of summer but sometimes fails to reach its<br />

maximum capacity due to the several reasons e.g. Generator windings <strong>for</strong> Units 1, 3 & 4 (175<br />

MW each) have developed problems due to aging; there is shortage of essential spare parts<br />

<strong>for</strong> extensive maintenance of Generating Units, and maintenance skills are deficient due to<br />

lack of training.<br />

An assistance agreement <strong>for</strong> implementation of Emergency Supplemental Funding has been<br />

concurred between Government of Pakistan through Ministry of Water & Power and <strong>USAID</strong>.<br />

The Implementation Letter (IL) dated January 13, 2010 commits an amount of US$16.5 million<br />

<strong>for</strong> carrying out a program to support the <strong>Project</strong> Funding will be provided through<br />

Reimbursement Agreement to be signed with WAPDA. The activity is estimated to be<br />

completed within 24 months from date of IL. Agreement was signed with <strong>USAID</strong> in May 2010.<br />

Accordingly, WAPDA has planned to implement a short term Repair & Maintenance program<br />

which includes replacement of old Class-B Winding of Generators 1, 3 & 4 with the latest<br />

Class-F Winding which will enhance output of these machines under overload conditions by<br />

about 100 MW and additional energy generation of 200 GWh per year. Reliability of the Power<br />

Plant is also likely to increase due to replacement/upgradation of some old systems.<br />

An agreement has been signed between GoP/WAPDA and <strong>USAID</strong> <strong>for</strong> an assistance of $16.5<br />

million <strong>for</strong> this project. The hydropower equipment <strong>for</strong> Rehabilitation of Tarbela Power House<br />

(1 st Trench) has been arrived at Tarbela. Unit 4 has been rehabilitated and generating 195<br />

MW as against 87 MW generating earlier and Unit 1 has also been rehabilitated and<br />

generating 195 MW as against 175 MW generating earlier. Rehabilitation work of Unit 3 is<br />

started from February 17, 2012 and is in progress.<br />

<strong>USAID</strong> has signed an agreement with WAPDA to provide US$ 16.5 Million <strong>for</strong> the <strong>Project</strong>. <strong>USAID</strong><br />

has released US$ 11.250 Million so far.<br />

12


US DELEGATION VISIT TO TARBELA POWER HOUSE<br />

13


NEW PROJECTS FOR US ASSISTANCE<br />

• Diamer Basha Dam <strong>Project</strong><br />

• Kurram Tangi Dam <strong>Project</strong><br />

• Darawat Dam <strong>Project</strong><br />

• Nai Gaj Dam <strong>Project</strong><br />

• Naulong Dam <strong>Project</strong><br />

• Garuk Dam <strong>Project</strong><br />

• Pelar Dam <strong>Project</strong><br />

• Allai Khwar Hydropower <strong>Project</strong><br />

• Duber Khwar Hydropower <strong>Project</strong><br />

• Khan Khwar Hydropower <strong>Project</strong><br />

• Jinnah Hydropower <strong>Project</strong><br />

• Up-gradation & Refurbishment of Mangla Power Station<br />

• Up-gradation, Rehabilitation & Modernization of<br />

WARSAK Power Station<br />

• Treatment of Effluent Water of RBOD (Pilot <strong>Project</strong>)<br />

• Appointment of General Consultants<br />

• Training & Capacity Building<br />

14


DIAMER BASHA DAM PROJECT<br />

15


DIAMER BASHA DAM PROJECT<br />

Diamer Basha Dam <strong>Project</strong> the first mega dam project conceived after Tarbela Dam <strong>Project</strong> at a cost of<br />

US$ 11.178 billion will play significant role in the economic development of Pakistan. The project is<br />

located on Indus River, about 315 km upstream of Tarbela Dam, 165 km downstream of the Gilgit-<br />

Baltistan (GB) capital Gilgit and 40 km downstream of Chilas. The proposed dam would have a<br />

maximum height of 272 meters, and impound a reservoir of about 8.1million acre feet (MAF), with live<br />

storage of more than 6.4 MAF and produce 4500 MW of power generation. The mean annual discharge<br />

of Indus River at the site is 50 MAF. Thus the dam will impound 15% of the annual river flow. It will<br />

extend the life of Tarbela Reservoir by blocking the sediments and additional annual Generation at<br />

Tarbela would be 1111GWh. With the creation of massive infrastructure leading to overall socioeconomic<br />

uplift of the area and better standard of living of people, this project will generate employment<br />

opportunities, particularly to the locals, during the construction and operation. The dam is located at the<br />

boundary of Gilgit-Baltistan (GB) and North Western Frontier Province (NWFP) in such a way that the<br />

right abutment and the right Power House is in GB while the left bank of the dam and the left Power<br />

House is in NWFP. ECNEC has approved this project at a cost of Rs.894,257 million (US$ 11.178<br />

billion). The <strong>Project</strong> will pay back its cost in 8 years with an EIRR of 18%.<br />

WAPDA carried out the feasibility of Diamer Basha Dam <strong>Project</strong> from 2002 to 2004 and Detailed<br />

Engineering Design from 2005 to 2008. during this period field investigations comprising of Drilling,<br />

Aditing, Field Testing & Topographic Survey also carried out. WAPD spent US$ 58.734 million on these<br />

works including Consultancy charges, Admn & other expenses.<br />

WAPDA started the Land Acquisition process in 2010-11. an amount of US$ 25 million has been paid to<br />

Government of Gilgit-Baltistan <strong>for</strong> Land Acquisition. The priority land <strong>for</strong> project colony infrastructure<br />

and Land <strong>for</strong> one model village <strong>for</strong> the affectees has been acquired. The acquisition of Land <strong>for</strong> Dam<br />

foot prints, other structures and the reservoir is in progress. The required land would be acquired in<br />

three years with an estimated cost of US$ 513.37 million.<br />

WAPDA intends to start the construction of infrastructure; WAPDA Offices, Consultants Office WAPDA<br />

Colony roads etc. Model Villages, Right Bank Periphery road and relocation of KKH in project area<br />

be<strong>for</strong>e the start of the main project which shall require US$ 461 million.<br />

Construction of small Hydropower Stations on Nullahs <strong>for</strong> providing power during construction of Main<br />

Dam and project colony / model villages shall require funding of tune of US$ 43.925 million.<br />

Implementation of the Diamer Basha Dam appurtenant structures shall be through international<br />

competitive bidding comprising of the five lots. Funding requirement <strong>for</strong> these lots are US$ 5,027<br />

million.<br />

PROJECT BENEFITS<br />

• Availability of about 6.4 MAF annual surface water storage <strong>for</strong> supplementing irrigation supplies during low<br />

flow periods<br />

• Harnessing of renewable source of clean and cheap energy through installed capacity of 4500 MW<br />

• Average Annual Generation 19208 GWh<br />

• Extend Life of Tarbela reservoir by blocking the sediments<br />

• Additional Annual Generation at Tarbela 1111GWh<br />

• Reduction of dependence on thermal power, thus saving <strong>for</strong>eign exchange<br />

• Employment opportunities (direct employment = 70,426 persons & indirect employment = 2.78 million<br />

persons), particularly to the locals during the construction and operation 7633 worker to be trained.<br />

• Creation of massive infrastructure leading to overall socio-economic uplift of the area and standard of living of<br />

people<br />

• The <strong>Project</strong> will pay back its cost in 8 years<br />

FINANCIAL BENEFITS<br />

• Financial Benefits of electricity produced – US$ 1.9 Billion (19 Billion units x 10 cents)<br />

• Financial Benefits of water stored – US$ 0.660 Billion<br />

• Water impounded by reservoir shall help to mitigate downstream flood losses. The avoidance of flood<br />

damages cost would be even much more than Rs.2, 331 million per annum.<br />

• Savings in Foreign Exchange of Equivalent electricity on imported oil - US$ 2.85 Billion<br />

• Carbon Credit Benefits – US$ 0.300 Billion<br />

16


PRESENT STATUS:<br />

• Detailed Engineering Design of Diamer Basha Dam <strong>Project</strong> (DBDP) was completed in June-2008.<br />

• PC-I <strong>for</strong> Land Acquisition and Resettlement was approved by Executive Committee of National Economic<br />

Council (ECNEC) on 6.11.2008 <strong>for</strong> Rs. 60 billion.<br />

• Main PC-I <strong>for</strong> DBDP was approved by ECNEC on 20.08.2009 <strong>for</strong> Rs.894.257 billion.<br />

• Resolution on Consensus of Diamer Basha Dam <strong>Project</strong> approved from Council of Common Interest (CCI)<br />

on 18.07.2010 headed by Prime Minister of Pakistan.<br />

• Bridge at Thakot on Indus River is completed by NHA <strong>for</strong> transportation of material and heavy machinery<br />

<strong>for</strong> construction of Diamer Basha Dam <strong>Project</strong>.<br />

• Priority Land Acquisition has started.<br />

• Rs.6.563 billion have been released to the Government of Gilgit-Baltistan <strong>for</strong> acquisition of land and 1783<br />

Acres of land has been acquired.<br />

• Rs.262 million was released in to D.C. Kohistan <strong>for</strong> acquisition of land and 162 Acres land has been acquired<br />

of Khyber Pakhtunkhwa area.<br />

• A vocational Training Institute has been setup.<br />

• Inauguration ceremony <strong>for</strong> commencement of works of Diamer Basha Dam <strong>Project</strong> has been carried out by<br />

the Prime Minister of Pakistan on 18.10.2011.<br />

PROJECT IMPLEMENTATION<br />

Implementation of the dam appurtenant structures shall be through international competitive bidding<br />

comprising of the following five lots:-<br />

Sr.<br />

No.<br />

Description of work Local Foreign<br />

1. Contract Lot-1<br />

(Concrete Dam and Related Structures including<br />

Diversion Tunnels and Permanent Access Bridge)<br />

2. Contract Lot-2<br />

(Underground Works and Related Structures (Left<br />

and Right Banks)<br />

3. Contract Lot-3<br />

(Hydro-Mechanical Equipment and Hydraulic Steel<br />

Structures)<br />

4. Contract Lot-4<br />

(Power Plant Generation Equipment (Left and Right<br />

Bank)<br />

Total<br />

Cost<br />

US$ Million<br />

Const.<br />

Period<br />

(Yrs.)<br />

1,096 731 1,827 9<br />

512 173 685 6.4<br />

42 380 422 8<br />

103 927 1,030 7<br />

5. Contract Lot-5<br />

(Electrical High Voltage Equipment and Power Plant<br />

Electrical Equipment (Left and Right Bank).<br />

109 954 1,063 7<br />

Total 1,862 3165 5,027<br />

Strategy<br />

• After approval of FODP/ADB Report on Water Sector Task Force by Federal Cabinet new strategy to be<br />

adopted.<br />

• In view of the reluctance of World Bank/ADB <strong>for</strong> financing Diamer Basha Dam <strong>Project</strong> an alternate financing<br />

plan needs to be prepared.<br />

• GoP to provide funds <strong>for</strong> land acquisition.<br />

• 80% of the cost of project will be met through loan/supplier credit/buyer’s credit.<br />

• 20% of the cost of the project will be met through Govt. funding, domestic loan/local bonds (Sukuk) and<br />

PSDP.<br />

• Foreign financing will be made through Donor Agency/ADB//IDB/Middle East Donors/Buyer Credits/Supplier’s<br />

Credit<br />

• Special request will be made to Islamic Development Bank, Asian Development Bank, Kuwait Development<br />

Fund, Saudi Development Fund, Qatar Development Fund, Abu Dhabi Fund <strong>for</strong> investing in Diamer Basha<br />

Dam <strong>Project</strong>.<br />

• Special request may be made to <strong>USAID</strong> to support this project as signatory project in Pakistan.<br />

• Consortium will be made comprising of Chinese Turkish and other Civil Contractors.<br />

• Consortium will also be made <strong>for</strong> supplying Electro-Mechanical equipment as Supplier’s Credit.<br />

17


Tentative Summary of Updated Capital Cost (June 2012 Prices)<br />

Sr. No. Component<br />

A. Indirect Costs<br />

I Land Acquisition and Resettlement :<br />

Estimated Cost (US$ Million)<br />

Local a) Foreign Total<br />

i. Land Acquisition 542 - 542<br />

ii. Resettlement & Incidentals 721 - 721<br />

Potential<br />

Financing<br />

GoP (Rs. 50 billion<br />

equivalent)<br />

GoP / Sukuk Bonds<br />

(Rs. 66 billion<br />

equivalent)<br />

iii. Total 1,263 - 1263 (b)<br />

II<br />

KKH Relocation from Shatial to Raikot<br />

(141 km)<br />

363 - 363 (c) <strong>USAID</strong> / Donors<br />

III <strong>Project</strong> Colony in Thor Valley 75 - 75 (d)<br />

GoP (Rs. 6.9 billion<br />

equivalent)<br />

Sub-Total (A) 1,701 - 1,701<br />

B. Direct Costs e)<br />

Concrete Dam & Related Structures<br />

IV<br />

V<br />

Including Diversion Tunnels &<br />

Permanent Access Bridge (Lot 1)<br />

Construction of Underground Works &<br />

Related Structures (Lot 2)<br />

1377<br />

643<br />

781<br />

185<br />

2,157<br />

828<br />

EXIM / Local<br />

Pakistan Banks<br />

VI<br />

Hydraulic Steel Structure & Hydro-<br />

Mechanical Equipment (Lot 3)<br />

53 406 459<br />

VII<br />

Power Plant Generation Equipment<br />

(Lot 4)<br />

129 990 1,120 Supplier's Credit<br />

VIII<br />

Electrical HV Equipment and Power<br />

Plant Electrical Equipment (Lot 5)<br />

137 1019 1,156<br />

Sub-Total (B) 2,339 3,381 5,719<br />

C. Incidental Costs<br />

Engineering & <strong>Project</strong> Management<br />

IX including Authority's Overheads 6% of<br />

(B)<br />

140 203 343<br />

GoP<br />

X Physical Contingency 3% of (B) 70 101 171<br />

Sub-Total (C) 210 304 514<br />

D. Total Base Cost (A+B+C) 4,250 3,685 7,935<br />

E. Other Costs<br />

XI Duties & Taxes 110 - 110 Exemption by GoP<br />

XII<br />

Escalation During Construction on<br />

(B+C+E) at:<br />

6.5% on Local Component<br />

2% on Foreign Component<br />

1,205 479 1,684 Donor's liability<br />

XIII<br />

Interest During Construction (IDC) on<br />

(B + C + E + Escalation) at:<br />

9.96% on Local Component<br />

12% on Foreign Component<br />

3,943 - 3,943<br />

Deferred payment<br />

from power<br />

revenues<br />

Sub-Total (E) 5,258 479 5,737<br />

F. Total Financial Cost (A to E) 9,508 4,164 13,672<br />

a) Converted at the average June 2012 parity rate of 1 US$ = Rs. 92.00<br />

b) Cost of PC-I (WAPDA) updated to June 2012 price level including additionalities to con<strong>for</strong>m to ADB's Social Safeguards.<br />

c) Cost of PC-I (NHA) escalated by 46% on the basis of increase in Consumer Price Index from January 2009 to June 2012.<br />

d) Based on actual contract awards / lowest evaluated bids <strong>for</strong> most of the packages.<br />

e) Updated by applying escalation factors <strong>for</strong> the period from March 2008 to June 2012 separately <strong>for</strong> local and <strong>for</strong>eign<br />

components.<br />

18


CURRENT DEMAND<br />

The project was placed in the FODP conference, wherein the Donors assured their commitment to fund<br />

this project. Middle East Donors, particularly Islamic Development Bank (IDB)/Saudi Fund and Kuwait<br />

Fund, has consented <strong>for</strong> a financial assistance of US$ 2 billion whereas Supplier’s Credit will be<br />

available <strong>for</strong> US$ 2.5 billion <strong>for</strong> the supply of electro-mechanical equipment. WAPDA expects US$ 1.0<br />

billion shortfall in its financing plan and accordingly <strong>USAID</strong> is requested to extend US$ 1.0 billion<br />

Financial Assistance <strong>for</strong> this project over a period of five years <strong>for</strong> the execution of initial civil works and<br />

land acquisition <strong>for</strong> this mega project. Keeping in view the urgency of the situation, an amount of US$<br />

200 million is required on priority basis <strong>for</strong> the year 2011-12 is requested.<br />

FUTURE FINANCING PHASING<br />

Financial Year Rs. Billion US$ Million<br />

2011-12 17.0 200<br />

2012-13 34.0 400<br />

2013-14 34.0 400<br />

DIAMER BASHA DAM STAKEHOLDERS SEMINAR<br />

19


KURRAM TANGI DAM MULTIPURPOSE PROJECT<br />

Location<br />

The proposed project is located on Kurram River in North Waziristan Agency about 22 km<br />

upstream of Kurram Garhi Head works and 32 KM North of Bannu City in NWFP.<br />

This project was conceived by WAPDA <strong>for</strong> a multipurpose dam in North Waziristan on Kurram River<br />

with storage of 1.20 MAF of water and power generation of 83.4 MW on completion. It will irrigate<br />

362,380 Acres of land and will usher a positive impact on the socio economic conditions of Tribal<br />

Areas and particularly North Waziristan Agency. It will not only irrigate the barren lands but further<br />

produce electricity & generate employment opportunities during construction and maintenance of the<br />

project. This project will play a significant role, in providing economic & social stability in North<br />

Waziristan Agency by offering economic opportunities and employment generation <strong>for</strong> local people.<br />

Salient Features<br />

• Dam Height 322 ft<br />

• Gross Storage 1.20 MAF-1.48 BCM<br />

• Live Storage 0.90 MAF-1.11 BCM<br />

• Power Houses (5 Nos) 83.4 MW (350 GWh)<br />

• Command Area 3,62,380 ACRES (including new area of 84,380 Acres)<br />

• Supplementing existing<br />

System of Civil & Marwat<br />

277,500 Acres<br />

Canals<br />

• EIRR 16.12%<br />

<strong>Project</strong> Benefits • Irrigated Agriculture Development<br />

• Hydropower generation<br />

• Socio-economic uplift of the area.<br />

• Employment opportunities during the construction<br />

and maintenance of the <strong>Project</strong>.<br />

• Development of Agriculture/Fisheries.<br />

PC-I Cost<br />

(Based on Revised Estimate)<br />

Rs. 59 Billion (including Rs. 5.37 Billion FEC)<br />

FINANCING OF KURRAM TANGI DAM PROJECT<br />

Total Estimated Cost as per revised PC-I US$ 700 million<br />

Request <strong>for</strong> US Assistance <strong>for</strong> Construction US$ 543 Million<br />

FUTURE FINANCING PHASING<br />

Financial Year Rs. Billion US$ Million<br />

2011-12 0.17 2<br />

2012-13 7.0 83<br />

2013-14 17.9 210<br />

2014-15 16.7 196<br />

2015-16 18.2 214<br />

21


Sr.<br />

No.<br />

KURRAM TANGI DAM PROJECT<br />

ABSTRACT OF COST ESTIMATES<br />

Description<br />

Local<br />

Component<br />

(Million Rs.)<br />

Foreign<br />

Component<br />

(Million Rs.)<br />

Total<br />

Amount<br />

(Million Rs.)<br />

A.<br />

Kaitu Weir and Affiliated<br />

Structures - (7.1)<br />

Main Dam, spillway, Power<br />

3,166.441 - 3,166.441<br />

B. Houses and Affiliated Structures -<br />

(7.2)<br />

11,510.822 - 11,510.822<br />

C.<br />

Thal Canal & Affiliated Structures<br />

- (7.3)<br />

6,655.758 - 6,655.758<br />

D.<br />

Remodeling of Existing Canals /<br />

Vials - (7.4)<br />

1,984.089 - 1,984.089<br />

E.<br />

Electrical & Mechanical<br />

Equipment - (7.5)<br />

- - -<br />

E-1. Power House No. 1 (36.5 MW) 575.331 3,002.477 3,577.808<br />

E-2. Power House No. 2 (11.0 MW) 185.762 969.437 1,155.199<br />

E-3. Power House No. 3 (17.0 MW) 285.408 1,489.459 1,774.868<br />

E-4. Power House No. 4 (18.5 MW) 299.594 1,563.489 1,863.083<br />

E-5. Power House No. 5 (400 Kw) 16.683 87.065 103.749<br />

E-6. Pump House 1.792 - 1.792<br />

E-7. Transmission Line 89.700 - 89.700<br />

Sub-Total of (E) 1,454.272 7,111.928 8,566.199<br />

F.<br />

Preliminary Works (Residential<br />

Colony, Office etc.)<br />

226.181 - 226.181<br />

Total of H = (A + B + C + D + E +<br />

F + G)<br />

24,997.562 7,111.928 32,109.490<br />

G.<br />

Land acquisition and resettlement<br />

cost<br />

2,790.500 - 2,790.500<br />

I. Physical Contingency at 3% of (H) 826.69 213.358 1,040.048<br />

J.<br />

Authority's Over heads 2.25% of<br />

(H).<br />

Engineering Services<br />

620.02 160.018 780.036<br />

K. (Construction Supervision and<br />

Design Reviews) 3% of (H).<br />

826.69 213.358 1,040.048<br />

L. Security Arrangements etc. 3,619.000 - 3,619.000<br />

M. Furniture, T&P, Vehicles etc. 201.526 - 201.526<br />

Total N = (H + I + J + K + L + M) 33,881.986 7,698.662 41,580.648<br />

Total Base Cost 33,881.986 7,698.662 41,580.648<br />

O<br />

Escalation (local 6.5%, <strong>for</strong>eign<br />

2.5%)<br />

1640.45 375.310 2,015.760<br />

Total cost<br />

IDC (14.23% & 3% Financal Risk)<br />

35,522.436 8,073.972 43,596.408<br />

P as per Planning Commission<br />

Instructions<br />

13,710.560 2,124.030 15,834.590<br />

Note:-<br />

Grand Total 49,232.996 10,198.002 59,430.998<br />

US$ 699 Million<br />

(i) Increased 15% on Works as Tribal Commission<br />

(ii) Increased Security Arrangement Cost as per FWO Estimates<br />

(iii) Increased IDC(14.23%) and 3% Financial Risk as per Planning Commission Guidelines.<br />

22


DARAWAT DAM PROJECT<br />

• Location The proposed site <strong>for</strong> Darawat Storage Dam is located<br />

at about 70 kms West of Hyderabad and 135 kms<br />

North East of Karachi across Nai Baran River in Thatta/<br />

Jamshoro districts of Sindh.<br />

• Salient Features • Dam Type Concrete Faced Rock fill<br />

• Height of Dam 118 ft<br />

• Reservoir Capacity 121,790 AF<br />

• CCA 47,000 Acres<br />

• Power Generation 0.45 MW<br />

• Execution by WAPDA<br />

• Supervision Consultants M/s NDC - CAMOES JV<br />

• Contractor M/s Sinohydro – MAJ JV<br />

• Donor Agency Government of Pakistan<br />

• Date of Commencement July 2010<br />

• Date of Completion June 2013<br />

• Financial Status Local FEC Total (Rs. Million)<br />

Approved PC-I Cost 3,175.000 - 3,175.000<br />

Expenditures upto 30.06.2012 1,926.552 - 1,926.552<br />

PSDP Allocation 2012-13 1,800.000 200.000 2,000.000<br />

Expenditures during the Month 5.762 - 5.762<br />

Current F/Y Expenditures 510.080 - 510.080<br />

Upto date Exp: 2,436.632 - 2, 436.632<br />

Physical Progress 60%<br />

23


LOCATION MAP – NAI GAJ DAM PROJECT<br />

24


NAI GAJ DAM PROJECT<br />

• Location Nai Gaj Dam <strong>Project</strong> is proposed across Gaj River in the<br />

gorge area at the edge of Kirthar range at about 65 km<br />

(40 miles) north-west of Dadu city in Sindh Province<br />

• Salient Features • Dam Type Earth Core Rock Fill Dam<br />

• Height of Dam 194 ft<br />

• Installed Capacity 4.2 MW<br />

• Gross Storage Capacity 300,000 AF<br />

• Dead Storage Capacity 140,000 AF<br />

• Live Storage Capacity 160,000 AF<br />

• Cropped Area 28,800 Acres<br />

• Execution by WAPDA<br />

• Detailed Engineering<br />

M/s NESPAK<br />

Consultants<br />

• Contractor M/s NEIE – SMADB JV<br />

• Donor Agency Government of Pakistan<br />

• Date of Commencement Not yet Commenced<br />

• Date of Completion -<br />

• Financial Status Local FEC Total (Rs. Million)<br />

Approved PC-I Cost 16,924.000 - 16,924.000<br />

Expenditures upto 30.06.2012 688.430 - 688.430<br />

PSDP Allocation 2012-13 2,000.000 - 2,000.000<br />

Expenditures during the Month 6.295 - 6.295<br />

Current F/Y Expenditures 11.459 - 11.459<br />

Upto date Exp: 699.889 699.889<br />

Status:-<br />

� PC-I amounting to Rs. 16.924 Billion approved by ECNEC in its meeting held on Sep. 3, 2009.<br />

� Tenders <strong>for</strong> construction opened on July 16, 2010. Letter of Acceptance issued to<br />

M/s NEIE – SMADB JV on 13.01.2011 (Bid Price = Rs. 38.702 Billion). Contract Agreement has<br />

been signed on April 12, 2011. Letter of commencement issued on May 04, 2012.<br />

� The Contractor mobilized to site with limited financing basis and established field camp /<br />

mobilized equipments <strong>for</strong> the <strong>Project</strong>.<br />

� M/s. Techno International JV appointed <strong>Project</strong> Supervision Consultants.<br />

� Revised PC-I amounting to Rs. 26.240 Billion approved by ECNEC in its meeting held on Aug.<br />

16, 2012.<br />

25


NAULONG DAM PROJECT<br />

LOCATION<br />

The proposed dam site is located on Mula river at Sunt about 30 kms from Gandawa City in tehsil and<br />

district Jhal Magsi (Balochistan).<br />

OBJECTIVES<br />

– Irrigated agriculture development of 47,000 acres of culturable command area.<br />

– Hydropower generation of 4.4MW.<br />

– Flood Mitigation.<br />

– Socio-economic uplift, poverty reduction and women emancipation.<br />

SALIENT FEATURES<br />

– Dam Type Earth fill<br />

– Dam Height 186 ft<br />

– Gross Storage 242,452 AF<br />

– Live Storage 200,000 AF<br />

– Culturable Command Area 47,000 acres<br />

– Power Generation 4.4 MW<br />

– Annual Energy 26.6 GWh<br />

– Revised <strong>Project</strong> Cost Rs. 18.028 billion<br />

CURRENT STATUS<br />

• Feasibility study and detailed engineering design of the <strong>Project</strong> completed in 2009.<br />

• PC-I amounting to Rs. 11.699 Billion approved by ECNEC in its meeting held on<br />

Sep. 3, 2009.<br />

• Tenders <strong>for</strong> construction received and opened on April 17, 2010. Letter of intent<br />

issued to the lowest bidder M/s. Descon – Zargoon JV on April 12, 2011. Letter of<br />

Acceptance issued on May 10, 2012.<br />

• During visit to China the President invited Chinese firms to participate <strong>for</strong><br />

construction of Naulong Dam <strong>Project</strong>.<br />

• Governor Balochistan and Chief Minister Balochistan assured Chinese Ambassador<br />

<strong>for</strong> providing full security arrangements <strong>for</strong> the construction firms especially the<br />

Chinese.<br />

• M/s Descon & Sinohydro of China have signed a joint venture agreement as<br />

contractor <strong>for</strong> construction of the project.<br />

• Memorandum of Understanding (MOU) <strong>for</strong> security arrangement <strong>for</strong> contractor<br />

concurred by Government of Balochistan.<br />

• Expression of Interest (EOI) <strong>for</strong> construction supervision of the <strong>Project</strong> received on<br />

June 25, 2012. Six (06) firms / JV’s submitted EOI documents and are under<br />

evaluation.<br />

• Revised PC-I amounting to Rs. 18.028 Billion approved by ECNEC in its meeting<br />

held on Aug. 16, 2012.<br />

26


GARUK DAM PROJECT<br />

LOCATION<br />

The dam site is located about 47 kms south east of Kharan Town across Garuk River in<br />

District Kharan (Balochistan).<br />

OBJECTIVES<br />

- Storage of flood water <strong>for</strong> irrigated agriculture development of 12,500 acres of culturable<br />

command area.<br />

- Hydropower generation of 300 KW.<br />

- Socio-economic uplift, poverty reduction and women emancipation.<br />

SALIENT FEATURES<br />

– Type of Dam Earth Core Rock fill<br />

– Height of Dam 184 ft<br />

– Length of Dam 2,323 ft<br />

– Reservoir Capacity 50,695 AF<br />

– Culturable Command Area 12,500 acres<br />

– Power Generation 300 KW<br />

– Revised <strong>Project</strong> Cost Rs. 6.850 billion<br />

CURRENT STATUS<br />

• PC-I approved by ECNEC in its meeting held on September 3, 2009.<br />

• Tenders of Garuk Dam on EPC basis invited on Oct 03, Nov 19, 2009 Feb. 20,<br />

March 24, October 20 and December 23, 2010. No bid received.<br />

• WAPDA proposed the <strong>Project</strong> through local District contractors by subletting the<br />

various components to increase participation of the local community; local<br />

monetary benefits.<br />

• Government of Balochistan suggested transferring the <strong>Project</strong> to I & P Department<br />

of Balochistan <strong>for</strong> execution.<br />

• Revised PC-I is under preparation.<br />

• No funds allocated in PSDP 2012-13 <strong>for</strong> construction of the <strong>Project</strong>.<br />

27


PELAR DAM PROJECT<br />

LOCATION<br />

The dam site is located about 160 kms from Awaran Town in District Awaran (Balochistan).<br />

OBJECTIVES<br />

- Storage of flood water <strong>for</strong> irrigated agriculture development of 25,650 acres of culturable<br />

command area.<br />

- Hydropower generation of 300 KW.<br />

- Socio-economic uplift, poverty reduction and women emancipation.<br />

SALIENT FEATURES<br />

– Type of Dam Concrete Gravity<br />

– Height of Dam 60 ft<br />

– Length of Dam 714 ft<br />

– Reservoir Capacity 99,175 AF<br />

– Culturable Command Area 25,650 acres<br />

– Power Generation 300 KW<br />

– Revised <strong>Project</strong> Cost Rs.8.740 billion<br />

CURRENT STATUS<br />

• PC-I amounting to Rs. 1.692 Billion approved by ECNEC in its meeting held on<br />

September 3, 2009.<br />

• Tenders of Pelar Dam on EPC basis invited on Sep. 30, Nov 12, 2009, Feb. 20,<br />

March 17, October 27 and December 29, 2010. No bid received.<br />

• WAPDA proposed the <strong>Project</strong> through local District contractors by subletting the<br />

various components to increase participation of the local community; local<br />

monetary benefits.<br />

• Government of Balochistan suggested transferring the <strong>Project</strong> to I & P Department<br />

of Balochistan <strong>for</strong> execution.<br />

• Revised PC-I is under preparation.<br />

• Funds amounting to Rs. 50 Million allocated in PSDP 2012-13 against a demand of<br />

Rs. 1,000 Million.<br />

28


BESHAM<br />

AKHP LAYOUT<br />

ALLAI WEIR<br />

R.C.C<br />

R.C.C<br />

BRIDGE<br />

INDUS RIVER<br />

37 Km.<br />

ALLAI KHWAR<br />

HEADRACE TUNNEL<br />

POWERHOUSE<br />

S/Y<br />

CONTRACTOR'S<br />

CAMP & COLONY<br />

ALLAI KHWAR<br />

S/Y<br />

TO BASHAMTHAKOT<br />

THAHKOT<br />

BRIDGE<br />

HELIPAD<br />

TO MANSEHRA<br />

BANA<br />

BAUNA<br />

BRIDGE<br />

BATGRAM<br />

29


ALLAI KHWAR HYDROPOWER PROJECT<br />

♦ Location On Allai Khwar, Left Tributary of Indus River near Besham<br />

in District Battagram, Khyber Pakhtunkhwa<br />

♦ Salient Features � Dam Height<br />

� Length of Headrace<br />

� Installed Capacity<br />

� Annual Energy<br />

� Gross Head<br />

� Objectives<br />

� EIRR<br />

32.50m<br />

2366 m<br />

121 MW<br />

463 GWh<br />

697 m<br />

To Generate Electricity<br />

23.97%<br />

♦ Execution by WAPDA<br />

♦ Consultants HHH Consultants NDC, LAHMEYER, BARQAAB,<br />

BAK, PES, EGC, RC, IDC & DMC<br />

♦ Contractor<br />

DEC Astron, VA Tech<br />

♦ Donor Agency Government of Pakistan<br />

♦ Date of Commencement June, 2003<br />

♦ Date of Completion Actual Jan 2009 / Revised Oct,2011<br />

Expected Oct, 2012<br />

♦ Financial Status Local FEC F/LOAN Total (Rs. M)<br />

Original PC-I Cost 5,124.284 3,453.540 - 8,577.824<br />

Revised PC-I Cost 7,312.687 6,522.261 - 13,834.948<br />

Expenditures upto 30.6.2012 5,261.974 3,327.478 2,315.596 10,905.048<br />

PSDP Allocation 2012-2013 804.000 725.000 644.000 2,173.000<br />

Expenditure During the Month 3.868 35.268 101.801 140.937<br />

Current F/Y Expenditure 6.868 197.706 179.534 384.108<br />

Upto date Expenditure 5,268.842 3,525.184 2,495.130 11,289.156<br />

o Physical Progress 94.00% against 98.00%<br />

o Financial Progress 81.60% against 81.44%<br />

Revised PC-I amounting to Rs. 13834.948 Million approved on 27.09.2011.<br />

30


DUBER KHWAR HYDROPOWER PROJECT<br />

♦ Location On Duber Khwar River, Right Bank Tributary of Indus<br />

River near Patan in Kohistan District, Khyber<br />

Pakhtunkhwa<br />

♦ Salient Features � Dam Height<br />

� Length of Tunnel<br />

� Gross Head<br />

� Installed Capacity<br />

� Annual Energy<br />

� Objectives<br />

� EIRR<br />

32 m (Concrete weir)<br />

5243 m<br />

540 m<br />

130 MW<br />

595 GWh<br />

To Generate Electricity<br />

32.12%<br />

♦ Scope of Work The project envisages installation of 130 MW Hydropower<br />

plant along with allied transmission and grid facility. The<br />

plant will generate 595 GWh/annum of electricity.<br />

♦ Execution by WAPDA<br />

♦ Consultants HHH Consultants, NDC, LAHMEYER, BARQAAB, BAK,<br />

PES, EGC, RC, IDC & DMC<br />

♦ Contractor CWH-HE, VA Tech<br />

♦ Date of Commencement June, 2003<br />

♦ Date of Completion Revised Aug, 2011 / Expected April, 2013<br />

♦ Financial Status Local FEC Total (Rs. Million)<br />

Approved PC-I Cost on 8,068.655 8,255.821 16,324.476<br />

Expenditures upto 30.6.2012 7,237.218 6,835.513 14,072.731<br />

PSDP Allocation 2012-2013 1,716.920 2,142.080 3,859.000<br />

Expenditure during the Month 21.050 21.430 42.480<br />

Current F/Y Expenditure 476.992 171.290 648.282<br />

Upto date Expenditure 7,714.210 7,006.803 14,721.013<br />

o Physical Progress 88.00% against 92.00%<br />

o Financial Progress 90.18% against 90.15%<br />

32


KHAN KHWAR HYDROPOWER PROJECT<br />

♦ Location Khan Khwar River, A Tributary of Indus River in District<br />

Shangla (Khyber Pakhtunkhwa)<br />

♦ Salient Features � Dam Height<br />

30 m<br />

� Length of Headrace<br />

Tunnel<br />

� Gross Head<br />

� Objectives<br />

� Installed Capacity<br />

� Annual Energy<br />

� EIRR<br />

4540 m<br />

257 m<br />

To Generate Electricity<br />

72 MW<br />

306 GWh<br />

29.56%<br />

♦ Scope of Work The project envisages installation of 72 MW Hydropower<br />

plant along with allied transmission and grid facility. The<br />

plant will generate 306 GWh/annum of electricity.<br />

♦ Consultants HHH Consultants, NDC, LAHMEYER, BARQAAB, BAK,<br />

PES, EGC, RC, IDC & DMC<br />

♦ Contractor CWH-HE, DEC<br />

♦ Execution by WAPDA<br />

♦ Date of Commencement June, 2003<br />

♦ Date of Completion Actual June 2006 / Expected March 2012 (MoU-2)<br />

♦ Financial Status Local FEC Total (Rs. Million)<br />

Original PC-I Cost 2,718.607 2,644.098 5,362.705<br />

Revised PC-I Cost 4,573.688 3,727.791 8,301.479<br />

Expenditures upto 30.6.2012 4,927.132 4,301.934 9,229.066<br />

PSDP Allocation 2012-2013 - - -<br />

Expenditure during the Month 4.820 - 4.820<br />

Current F/Y Expenditure 8.420 - 8.420<br />

Upto date Expenditure (O&M) *8.420 - *8.420<br />

* There is no PSDP Allocation <strong>for</strong> F/Y 2012-13. Expenditure is chargeable to O&M Budget.<br />

Physical Progress<br />

o Physical Progress 99.90 % against 100 %<br />

o Financial Progress *111.17 % against 100 % (upto 30.06.2012)<br />

* 2 nd revised PC-I cleared by CDWP at revised cost of Rs. 10,732.788 Million on 18.06.2012 [<br />

- Testing/commissioning of unit # 2 started on Oct, 04. 2010.<br />

- Testing/commissioning of unit # 1 started on Oct, 19. 2010.<br />

- Commercial operation started w.e.f. Nov 08, 2010.<br />

34


JINNAH HYDROPOWER PROJECT<br />

♦ Location The <strong>Project</strong> is located on right side of Jinnah Barrage<br />

on Indus River about 5 km downstream of Kalabagh<br />

Town and 234 km from Islamabad.<br />

♦ Salient Features � Installed Capacity<br />

� Annual Energy<br />

� Gross Head<br />

� Design Discharge<br />

� No. of Units<br />

� Objectives<br />

96 MW<br />

688 GWh<br />

4.88 m<br />

2400 m 3 /sec<br />

8 units<br />

To Generate Electricity<br />

♦ Consultants ACE (JV) NESPAK, NDC, & MWH. EASEPAK,DMC<br />

♦ Contractor: M/s Dongfeng Electric Corporation (DEC) of China<br />

♦ Date of Commencement as PC- I February 2006<br />

♦ Date of Completion Actual/Revised<br />

Expected Dec 2012<br />

♦ Financial Status<br />

FEC Total (Rs. Million)<br />

Local<br />

Approved PC-I Cost 6,935.950 6,610.850 13,546.800<br />

Expenditures upto 30.6.2012 6,753.847 6,528.000 13,281.847<br />

PSDP Allocation 2012-2013 1,032.000 - 1,032.000<br />

Expenditure during the Month 18.570 - 18.570<br />

Current F/Y Expenditure 27.664 - 27.664<br />

Upto date Expenditure 6,781.511 6,528.000 13,309.511<br />

• The Jinnah Hydropower <strong>Project</strong> is being financed through supplier’s credit. The utilization of Foreign Loan / supplier’s credit in above statement based on<br />

figures provided by the M/s. DEC China. However, there is no <strong>for</strong>eign loan utilization in <strong>Project</strong> Books and no IPC’s are submitted by the Contractor as it is an<br />

EPC / Turnkey basis <strong>Project</strong>.<br />

Physical Progress / Status<br />

PC-I <strong>for</strong> the Construction of O&M Staff Colony approved on 19.11.2009 <strong>for</strong> Rs. 253.07 million<br />

Unit No. 1: The Unit is in commercial operation.<br />

Unit No. 2: 72 Hours per<strong>for</strong>mance test of unit is under progress.<br />

Unit No. 3: The Unit is in commercial operation since 15.08.2012.<br />

Unit No. 5: 72 Hours commissioning test of the unit is expected to start on 15.09.2012.<br />

o Physical Progress 98.00 %<br />

o Financial Progress *15.00 %<br />

*Being an EPC contract only mobilization advance of 15% has been paid to the contractor; Rest<br />

85% is arranged under supplier’s credit by the contractor.<br />

36


REPAIR & MAINTENANCE OF TARBELA POWER<br />

STATION<br />

Tarbela Dam is one of the world’s largest earth and rock filled dam. It is one of the world<br />

greatest resources development projects built on one of the world’s largest river Indus called<br />

Abbasin or Father of Rivers. Tarbela Power Station is located on the right bank of river Indus.<br />

Power Station is equipped with fourteen generating units having total capacity of 3478 MW. It<br />

is the biggest hydel power station completed in four phases since 1977 to 1993-93.<br />

The total power potential of the station is 3478 MW with 14 generating units constitutes about<br />

25~35% of the total power presently generated in the country.<br />

The existing equipment of Tarbela Power Station are in service since commissioning and<br />

reliability of most of the equipment have considerably been reduced and the station<br />

desperately require planned repair and maintenance programme.<br />

The planned repair and maintenance programme will enhance reliability and will ensure<br />

smooth operation of the station by minimizing prolonged and <strong>for</strong>ced outages in one way or the<br />

other. The sever power crises in the prevailing situation have created energy crises and<br />

ultimately lead to public unrest and put the country economic stability at stake due to<br />

prolonged interruption.<br />

The procurement of spares/equipment demanded under additional requirement will enhance<br />

the reliability of the station in the following manner :<br />

• Help to improve the reliability factor of the plant.<br />

• To minimize <strong>for</strong>ced outages.<br />

• Help to reduce the energy crises.<br />

• To improve the availability of units.<br />

• Will enhance the life of units.<br />

The close analysis shows that the proposed R&M programme of Tarbela Power Station will<br />

earn WAPDA 1973 Million KWH per month or Rs.19730 Million/US$ 232 Million per month.<br />

� If power trans<strong>for</strong>mer of Units 1~10 goes out of order due to some fault, the relevant unit<br />

will also remain out till the availability of the trans<strong>for</strong>mer. The authority in shape of<br />

revenue will suffer 0.412 Million US$ per day and the station utilization factor will also<br />

go down by 5% at least.<br />

Similarly, if power trans<strong>for</strong>mer of any unit from Units 11~14 goes out or order due to<br />

fault then the authority will suffer by a loss of 0.819 Million US$ per day till the<br />

availability of new power trans<strong>for</strong>mer.<br />

� If 220KV breaker of unit is develops fault, the relevant unit will remain out till the<br />

availability of breaker. The station and authority will suffer 0.412 Million US$ per day till<br />

the availability of the breaker. Also utilization factor of the station will reduce by 5% at<br />

least. Similarly if breaker of 220KV transmission line develops fault, the station and<br />

authority will suffer a revenue loss of 0.37 Million US$ per day till the availability of the<br />

breaker.<br />

� If stator core of a unit is damaged, then the authority will duffer a revenue loss of 0.412<br />

Million US$ per day till the availability and erection of the new stator.<br />

� If 2 Nos. 30 ton bridge cranes <strong>for</strong> lifting the rotor of Units 1~10 goes out of order, then<br />

no alternate arrangement is available <strong>for</strong> lifting the rotor and the unit will remain out till<br />

37


the availability or procurement and installation of new cranes. The authority will suffer a<br />

huge loss of amount till the availability of the cranes.<br />

� 230V DC battery system comprising of 115 cells if went out of order, then protection<br />

system of all Units 1~10 will not work and the units will remain shut down till the<br />

availability of new batter set. The authority will suffer a revenue loss of huge amount.<br />

Estimated Cost US$ 100 million<br />

Request <strong>for</strong> US Assistance US$ 100 Million<br />

FUTURE FINANCING PHASING<br />

Financial Year Rs. Billion US$ Million<br />

2011-12 0.76 8.5<br />

2012-13 5.35 59.5<br />

2013-14 2.9 32.0<br />

38


UP-GRADATION AND REFURBISHMENT OF<br />

GENERATING UNITS OF MANGLA POWER STATION<br />

Mangla Dam <strong>Project</strong> completed in 1967 is located on River Jhelum at about 120 Km from Islamabad.<br />

The Power House was completed in four stages, the initial phase comprising four units of 100 MW<br />

each was completed in 1967~1969. The first extension of Units 5~6 (2X100 MW) was completed in<br />

1974 while second extension comprising units 7~8(2X100 MW) was completed in 1981. The project<br />

attained its maximum capacity of 1000MW with the final extension of units 9&10(2X100 MW) in 1993-<br />

94.<br />

Mangla reservoir capacity reduced to 4.674 MAF from 5.88 MAF due to sedimentation. As such<br />

Raising of Mangla Dam height by 30 ft. was carried out (2004~2009). The <strong>Project</strong> will provide<br />

additional water storage of 2.88 MAF, increase of water head by 40 ft and additional power generation<br />

of 644 GWh per annum will be achieved.<br />

In the light of increase in a<strong>for</strong>esaid parameters, WAPDA intends to carry out a Feasibility Study <strong>for</strong> Upgradation<br />

& Refurbishment of the old Generating Units and Allied Equipment of Mangla Power Station<br />

to ensure their optimized, reliable and sustainable operation in the Post Raised Mangla Dam Scenario.<br />

Electrical & Mechanical Equipment after having spent nearly 40 years of their useful lives have<br />

deteriorated due to aging effects resulting in reduction of efficiency and dependability.<br />

The Feasibility Study is aimed to assess the present operating conditions of existing Civil Structures &<br />

Plant Machinery, Study of various options of Refurbishment of E&M Equipment and to recommend the<br />

most viable option <strong>for</strong> Up-gradation / Refurbishment of Power House Generating Units <strong>for</strong> achieving<br />

optimum benefits as a result of enhanced water availability and increased head after Mangla Dam<br />

Raising.<br />

PROJECT COST<br />

Cost of the Consultancy Services <strong>for</strong> Feasibility Study is US$ 2.0 Million.<br />

Total cost of the Rehabilitation <strong>Project</strong> is estimated to be US $ 518 Million.<br />

PRESENT STATUS<br />

M/s MWH (USA) – NESPAK (Pakistan) JV have been engaged to carry out Feasibility Study of the<br />

<strong>Project</strong>. The Consultancy Agreement was signed in 27 th April 2011 with eight (08) months completion<br />

time. Feasibility study submitted by consultants in December, 2011 and is under evaluation/approval<br />

by WAPDA. After which Detail Engineering Design, preparation of Tender Documents etc. will be<br />

started, requiring six (06) months period, followed by the Bidding.<br />

FINANCIAL PHASING<br />

(Million US$)<br />

Component<br />

2012 2013<br />

Year<br />

2014 2015 2016 2017<br />

Total<br />

Consultancy Services 8 5 5 5 5 5 33<br />

<strong>Project</strong> Construction Cost 10 50 100 125 125 75 485<br />

Total 18 55 105 130 130 80 518<br />

<strong>USAID</strong> has shown interest to finance the subject <strong>Project</strong>.<br />

FUTURE FINANCING PHASING<br />

Financial Year Rs. Billion US$ Million<br />

2012 1.6 18<br />

2013 4.7 55<br />

2014 8.9 105<br />

2015 11.0 130<br />

2016 11.0 130<br />

2017 6.8 80<br />

39


UP-GRADATION, REHABILITATION AND<br />

MODERNIZATION OF WARSAK HYDROELECTRIC POWER<br />

STATION<br />

Warsak Hydel Power Station is located on River Kabul at 30 KM in North – West of Peshawar. The<br />

<strong>Project</strong> was completed under Colombo Plan under two phases and financed by Canadian government.<br />

The first phase completed in 1960 consisted of construction of Dam, irrigation tunnels and installation<br />

of four power generating units, each of 40 MW capacity with 132 KV transmission system which was<br />

completed in 1960. Two additional generating units each of 41.48 MW capacities were added in 1980-<br />

81 in the second phase. The total installed capacity of the station thus became nearly 243 MW.<br />

WAPDA intends to carry out a Feasibility Study <strong>for</strong> Rehabilitation, Up-gradation & Modernization of<br />

Electrical & Mechanical Equipment of Warsak Hydroelectric Power Station to ensure its reliable and<br />

sustainable operation at the total installed capacity of 243 MW. The Electrical & Mechanical Equipment<br />

of the existing units having spent 50 years (Units 1~4) and 30 years (Units 5~6) of their useful lives,<br />

have deteriorated due to aging effects resulting in reduction of reliability and dependability.<br />

The Feasibility Study is aimed to study and determine viable solutions and required Works <strong>for</strong><br />

Rehabilitation, Up-gradation and Modernization of old E&M Equipment, recommend necessary<br />

remedial measures to overcome the defects in Civil Structures and to carry out Sedimentation<br />

Management Studies. preparation of Detail Design, Tender Documents and PC-I <strong>for</strong> Warsak<br />

Rehabilitation <strong>Project</strong> will also be a part of the required Consultancy Services.<br />

PROJECT COST<br />

Cost of Consultancy Services <strong>for</strong> Detail Design etc. is US$ 4.0 Million.<br />

Total cost of the <strong>Project</strong> is estimated to be US $ 308 Million.<br />

PRESENT STATUS<br />

Joint Venture of RSW (Canada)-DCE (Pakistan) has been appointed as Consultants to carry out<br />

Feasibility Study, Detail Engineering Design and Tender Documents with 12 months completion time.<br />

FINANCIAL PHASING<br />

Component<br />

2012 2013<br />

Year<br />

2014 2015 2016<br />

(Million US$)<br />

Total<br />

Consultancy Services 4 4<br />

<strong>Project</strong> Construction Cost - 42 71 102 90 305<br />

Total 4 42 71 102 90 309<br />

FUTURE FINANCING PHASING<br />

Financial Year Rs. Billion US$ Million<br />

2012 0.34 4<br />

2013 3.6 42<br />

2014 6.0 71<br />

2015 8.7 102<br />

2016 7.7 90<br />

40


APPOINTMENT OF GENERAL CONSULTANTS<br />

WAPDA is going to launch mega projects such as Diamer Basha Dam, Tarbela Dam 4 th<br />

Extension, Kurram Tangi Dam, Munda Dam etc. etc. wherein the services of General<br />

Consultants of world repute will be required on priority basis to build the capacity to meet the<br />

challenges. It is worth mentioning that when the replacement work of Indus Basin System was<br />

initiated M/s. Harza (USA) was hired as General Consultants which helped WAPDA to build its<br />

capacity <strong>for</strong> building mega projects like Tarbela Dam, Mangla Dam, Chashma, Link Canals<br />

etc. At this time, there are greater challenges like Global Warming on climatic effects, Hydro<br />

Power Potential, Lining of Canal, Treatment of Saline Water, Underground Water Storage,<br />

initiatives require services of General Consultants to steer WAPDA in this difficult situation.<br />

The estimated expenditure to be incurred on hiring the services of General Consultants is<br />

about US$ 50 million <strong>for</strong> a period of 10 years whereas the request <strong>for</strong> 2011-12 will be about<br />

US$ 3 million.<br />

COST ESTIMATE (2011-2020)<br />

AMOUNT<br />

� Annual Foreign Cost = US$ 3 Million<br />

� Annual Local Cost = Rs.150 Million<br />

� Total Budget Cost = 10 Years<br />

- Foreign = US$ 30 Million<br />

- Local = Rs.2366 Million<br />

41


TRAINING & CAPACITY BUILDING – US$ 21 Million<br />

i. WAPDA Administrative Staff College Islamabad<br />

• Revitalization of Hardcore Training Activities at WAPDA Administrative Staff College<br />

under <strong>USAID</strong> Economic Growth Program has been worked out with financial implication<br />

of approximately Rs. 150 Milllion. (US$ 1.9 Million)<br />

ii. WAPDA Engineering Academy Faisalabad<br />

• Revitalization of Hardcore Training Activities at WAPDA Engineering Academy<br />

Faisalabad under <strong>USAID</strong> Economic Growth Program has been worked out with<br />

financial implication of approximately Rs. 478.333 Million. (US$ 5.98 Million)<br />

iii. WAPDA Hydel Training Center Mangla<br />

• It has been planned to convert WAPDA Training Centre Mangla into a high quality<br />

Training Academy duly equipped with modern laboratories having latest machinery and<br />

teaching techniques under <strong>USAID</strong> Economic Growth Program.<br />

• Approximate Cost <strong>for</strong> revamping the training activities of Hydel training Centre Mangla<br />

will be Rs. 85 Million. (US$ 1.06 Million)<br />

iv. Capacity Building<br />

• A number of run of river projects on River Indus and its tributaries are proposed to be<br />

constructed in Pakistan. These projects are financially viable and necessary <strong>for</strong><br />

reducing the power tariff to be within the reach of common man. For implementation of<br />

these projects WAPDA needs technical assistance in capacity building; especially of<br />

Engineers training in Tunneling, Roller Compacted Concrete dam construction and<br />

special tests of Rock mechanics. (US$ 2 Million)<br />

• Central Material Testing Laboratory established with UNDP grant in 1980s in order to<br />

carry out the investigations and tests <strong>for</strong> Hydropower and other projects. It needs<br />

upgradation to carryout special tests especially <strong>for</strong> large concrete dams.<br />

(US$ 5 Million)<br />

• Pakistan Snow & Ice Hydrology <strong>Project</strong> (PSIHP) is a research project on high altitude<br />

hydrology in relation to Snow and Ice regime basins in the Northern Areas of Pakistan.<br />

Up-gradation and improvement is required to install new gauges, equipment,<br />

implementation of remote sensing technology, GIS and training to WAPDA engineers.<br />

(US$ 5 Million.)<br />

42


TREATMENT OF EFFLUENT WATER OF RBOD<br />

(PILOT PROJECT)<br />

• WAPDA in line with the directives of the President of Pakistan in October 2009, engaged<br />

M/s EASE-PAK Consultants to carryout the detailed feasibility study with a completion period<br />

of six months.<br />

• The Consultants have submitted the draft feasibility study which is under review with<br />

WAPDA.<br />

• The initial findings are:<br />

• The project is technically feasible, economically viable and environment friendly.<br />

• In-situ analysis of effluent through Prototype plant is planned to authenticate the exact<br />

quantity of recoverable salts.<br />

• The Prototype laboratory plant has been shifted from USA and is functioning on Site<br />

since 15th May, 2010.<br />

• The RBOD effluent must be used as such or after treatment <strong>for</strong> drinking, agriculture,<br />

fishery or other economical uses.<br />

• The excess quantity of Parameters like calcium carbonate, magnesium make effluent<br />

harder which is hazardous <strong>for</strong> irrigation. After Treatment, excess quantity of calcium<br />

carbonate and magnesium shall be removed.<br />

FLOWS AND QUALITY IN RBOD (RD + 93 MNV DRAIN)<br />

SEASON<br />

Total Dissolved Solids<br />

FLOWS (cfs)<br />

(PPM)<br />

Sodium Adsorption<br />

Ratio (SAR)<br />

Residual sodium<br />

Carbonate (RSC)<br />

Kharif 1145 690 – 1900 6-9 0<br />

Rabi 198 1910 – 8360 7-16 0<br />

Useable Flows = 28% (376 cfs)<br />

Marginal Flows = 23% (309 cfs)<br />

Hazardous Flows = 49% (658 cfs)<br />

Treatment Plants to be Installed = 5 Nos. (40 cfs each)<br />

Benefits of Pilot <strong>Project</strong><br />

• 40 cfs of water after treatment will irrigate upto 10,000 acres of barren land<br />

• <strong>Project</strong> Base Cost. = Rs.3353 M<br />

• <strong>Project</strong> Revenues (Annual) = Rs. 643.68 M<br />

• <strong>Project</strong> O&M Cost (Annual) = Rs. 237.40 M<br />

• <strong>Project</strong> Life = 30 years<br />

• Benefit Cost Ratio = 1.18:1<br />

• EIRR = 15.06 %<br />

Total <strong>Project</strong>:<br />

• Total additional water available after treatment 985,000 AF<br />

• Additional area to be irrigated 350,000 Acres<br />

• Net annual benefits (Revenue) Rs13.227 Billion<br />

• Cost of one plant of 40 cfs (Pilot <strong>Project</strong>) Rs.3.353 Billion/US$ 40 Million<br />

• Cost of five plants of 40 cfs each Rs16.765 Billion/US 200 Million<br />

FUTURE FINANCING PHASING<br />

Financial Year Rs. Billion US$ Million<br />

2011-12 0.4 5<br />

2012-13 0.4 5<br />

43


SUMMARY OF <strong>USAID</strong> FINANCIAL ASSISTANCE<br />

COMMITTED<br />

Under Implementation <strong>Project</strong>s<br />

Gomal Zam Dam<br />

(South Waziristan) – Dam & Irrigation<br />

Portions and Waran Canal System<br />

Total Cost Committed<br />

(US$ Million)<br />

Released so<br />

far<br />

150 92 55.089<br />

Satpara Dam (Gilgit-Baltistan) 52 26 21.485<br />

Repair & Maintenance of Units 1, 3 &<br />

4 Of Tarbela Dam<br />

16.5 16.5 11.250<br />

Total: 134.5 87.824<br />

SUMMARY OF <strong>USAID</strong> FINANCIAL ASSISTANCE<br />

REQUESTED<br />

New <strong>Project</strong>s<br />

Diamer Basha Dam<br />

(KPK/Gilgit Baltistan)<br />

Kurram Tangi Dam (North<br />

Waziristan)<br />

Repair & Maintenance of<br />

Units Tarbela Power Station<br />

Total<br />

Cost<br />

2011-<br />

12<br />

2012-<br />

13<br />

2013-<br />

14<br />

2014-<br />

15<br />

2015-<br />

16<br />

2016-<br />

17<br />

US$ Million<br />

2017-<br />

18<br />

Total<br />

11178 200 670 657 1527<br />

700 2 83 210 196 214 705<br />

100 8.5 59.5 32 100<br />

Darawat Dam 104 20 20<br />

Nai Gaj Dam 292 10 10<br />

Naulong Dam 177 10 10<br />

Garuk Dam 73 10 10<br />

Pelar Dam 93 10 10<br />

Allai Khwar 143 26 26<br />

Duber Khwar 272 20 20<br />

Khan Khwar 138 4 4<br />

Jinnah 226 4 4<br />

Upgradation (E&M) of Mangla<br />

Hydel Power Station (AJK)<br />

Upgradation (E&M) Warsak<br />

Hydel Power Station (KPK)<br />

Appointment of General<br />

Consultants<br />

518 2 16 55 105 130 130 80 518<br />

312 2 2 42 71 102 90 309<br />

50 3 3 3 3 3 3 18<br />

Training & Capacity Building 21 2 5 5 5 5 22<br />

Treatment of Effluent Water of<br />

RBOD (Pilot <strong>Project</strong>)<br />

40 5 5 10<br />

Total: 338.5 843.5 1004 380 454 223 80 3323<br />

44


JOINT WAPDA <strong>USAID</strong> TASK FORCE ON THE PROJECTS<br />

WAPDA <strong>USAID</strong><br />

Muhammad Imtiaz Tajwar, Secretary WAPDA –<br />

Team Leader<br />

Diamer Basha Dam <strong>Project</strong><br />

Dr. Izharul Haq, Chief Executive Officer (DBDP)<br />

Dr. Raheel Siddiqui, General Manger (LA&R)<br />

Kurram Tangi Dam <strong>Project</strong><br />

Mr. Irshad Ahmad, General Manger (P&D)<br />

Mr. Sher Nawaz, <strong>Project</strong> Director (Kurram Tangi)<br />

Mangla Power Station<br />

Mr. Wajid Hameed, General Manager (Hydel)<br />

Sh. Altaf Hussain, Chief Engineer (Mangla)<br />

Warsak Power Station<br />

Mr. Wajid Hameed, General Manager (Hydel)<br />

Mr. Rizwan Ahmad, Chief Engineer (Hydel) Warsak<br />

Capacity Building<br />

Mr. Muhammad Ali Shah, General Manger (C&M)<br />

Mr. Naveed ul Haq, Director (Training)<br />

Mian Shahid Ahmad –<br />

Team Leader<br />

Salim Paracha<br />

Ghulam Abbas<br />

Tariq Qazi<br />

Saleem Pracha<br />

Ghulam Abbas<br />

Saleem Paracha<br />

Tariq Qazi<br />

Saleem Paracha<br />

Tariq Qazi<br />

Munir Ahmad<br />

45


EXISTING INSTALLED GENERATION CAPACITY<br />

IPPs (incl.<br />

Nuclear)<br />

6609 MW<br />

(36%)<br />

Rental<br />

285 MW<br />

(2%)<br />

GENCOs<br />

4829 MW<br />

(27%)<br />

WAPDA Hydro<br />

6444 MW<br />

(35%)<br />

ELECTRICITY GENERATION BY FUEL<br />

EXISTING INSTALLED GENERATION CAPACITY<br />

Type of Generation<br />

Installed<br />

Capacity<br />

(MW)<br />

Derated/<br />

Dependable<br />

Capacity<br />

(MW)<br />

Hydro 6516 6516<br />

Availability (MW)<br />

Summer Winter<br />

Min 3260<br />

Max 6750<br />

720<br />

5630<br />

GENCOs 4829 3580 Max 3250 2960<br />

IPPs<br />

(incl Nuclear/ Rental)<br />

Others<br />

2%<br />

9637 9316<br />

Total 20982 19412<br />

Oil<br />

35%<br />

Gas<br />

29%<br />

Max<br />

5340<br />

Min 11850<br />

Max 15340<br />

5230<br />

8910<br />

13820<br />

MAXIMUM ELECTRICITY SHORTAGES<br />

SUMMER (May 2012) 5210 MW<br />

WINTER (10.1.2011) 4770 MW<br />

Hydro<br />

35%<br />

46


PEAK DEMAND PROJECTIONS* (WHOLE COUNTRY)<br />

2009–2030<br />

MW<br />

120000<br />

100000<br />

80000<br />

60000<br />

40000<br />

20000<br />

0<br />

19352<br />

16364<br />

Demand Supply<br />

22460<br />

17539<br />

28029<br />

25444<br />

45698<br />

41132<br />

80566<br />

76200<br />

113695<br />

2009 2010 2015 2020 2025 2030<br />

Years<br />

106851<br />

*<strong>Project</strong>ed demand includes captive power also. Average growth rate is expected to be about 8%<br />