TREATMENT OF EFFLUENT WATER OF RBOD<br />

(PILOT PROJECT)<br />

• WAPDA in line with the directives of the President of Pakistan in October 2009, engaged<br />

M/s EASE-PAK Consultants to carryout the detailed feasibility study with a completion period<br />

of six months.<br />

• The Consultants have submitted the draft feasibility study which is under review with<br />

WAPDA.<br />

• The initial findings are:<br />

• The project is technically feasible, economically viable and environment friendly.<br />

• In-situ analysis of effluent through Prototype plant is planned to authenticate the exact<br />

quantity of recoverable salts.<br />

• The Prototype laboratory plant has been shifted from USA and is functioning on Site<br />

since 15th May, 2010.<br />

• The RBOD effluent must be used as such or after treatment <strong>for</strong> drinking, agriculture,<br />

fishery or other economical uses.<br />

• The excess quantity of Parameters like calcium carbonate, magnesium make effluent<br />

harder which is hazardous <strong>for</strong> irrigation. After Treatment, excess quantity of calcium<br />

carbonate and magnesium shall be removed.<br />

FLOWS AND QUALITY IN RBOD (RD + 93 MNV DRAIN)<br />

SEASON<br />

Total Dissolved Solids<br />

FLOWS (cfs)<br />

(PPM)<br />

Sodium Adsorption<br />

Ratio (SAR)<br />

Residual sodium<br />

Carbonate (RSC)<br />

Kharif 1145 690 – 1900 6-9 0<br />

Rabi 198 1910 – 8360 7-16 0<br />

Useable Flows = 28% (376 cfs)<br />

Marginal Flows = 23% (309 cfs)<br />

Hazardous Flows = 49% (658 cfs)<br />

Treatment Plants to be Installed = 5 Nos. (40 cfs each)<br />

Benefits of Pilot <strong>Project</strong><br />

• 40 cfs of water after treatment will irrigate upto 10,000 acres of barren land<br />

• <strong>Project</strong> Base Cost. = Rs.3353 M<br />

• <strong>Project</strong> Revenues (Annual) = Rs. 643.68 M<br />

• <strong>Project</strong> O&M Cost (Annual) = Rs. 237.40 M<br />

• <strong>Project</strong> Life = 30 years<br />

• Benefit Cost Ratio = 1.18:1<br />

• EIRR = 15.06 %<br />

Total <strong>Project</strong>:<br />

• Total additional water available after treatment 985,000 AF<br />

• Additional area to be irrigated 350,000 Acres<br />

• Net annual benefits (Revenue) Rs13.227 Billion<br />

• Cost of one plant of 40 cfs (Pilot <strong>Project</strong>) Rs.3.353 Billion/US$ 40 Million<br />

• Cost of five plants of 40 cfs each Rs16.765 Billion/US 200 Million<br />

FUTURE FINANCING PHASING<br />

Financial Year Rs. Billion US$ Million<br />

2011-12 0.4 5<br />

2012-13 0.4 5<br />

43