GOMAL ZAM DAM PROJECT<br />

Location On Gomal river in South Waziristan Agency, West of Tank and D.I.Khan District of Khyber<br />

Pakhtunkhwa..<br />

This project is located at Khajuri Kach on Gomal River in South Waziristan Agency about 60 km west<br />

of Tank and being constructed as a Rein<strong>for</strong>ced Cement Concrete (RCC) dam. WAPDA has conceived<br />

this project <strong>for</strong> the uplift of Tribal Areas particularly of South Waziristan Agency. This dam will store<br />

1 MAF of water and irrigate 163,000 Acres of land, besides generating 17 MW of electricity. The<br />

project has been awarded to M/s Frontier Works Organization (FWO) of the Army, M/s Sinohydro<br />

(China) and M/s TEKSER (Turkey) are its joint partners. To execute a development project in militant<br />

infested area of South Waziristan, was a difficult task but WAPDA and its partners made all-out ef<strong>for</strong>ts<br />

<strong>for</strong> the continuation of work on this project. It is near completion as almost 90% work is completed. Due<br />

to paucity of development funds, completion could not be achieved. An additional funding of Rs3.0<br />

billion/US$35 million would complete this project to bring significant impact on the people of South<br />

Waziristan to generate economic activity, conducive <strong>for</strong> peace and catalyst <strong>for</strong> national production.<br />

♦ Salient Features<br />

� Type<br />

� Height of Dam<br />

� Length of Dam<br />

� Length of Main Canal<br />

� Length of Distributaries<br />

� Gross Storage<br />

� Live Storage<br />

� Command Area<br />

� Power Generation<br />

� EIRR<br />

♦ Date of Commencement Actual July 2002 / Revised June 2007<br />

RCC Gravity Dam<br />

437 ft<br />

758 ft<br />

63 km<br />

203 km<br />

1.140 MAF<br />

0.892 MAF<br />

163,086 Acres<br />

17.4 MW / 90.9 Gwh<br />

12%<br />

♦ Date of Completion Actual Sep 2006 / Revised Jan. 2013<br />

♦ Financial Status Local Foreign Total (Rs. Million)<br />

Approved PC-I Cost 7,865.000 4,964.000 12,829.000<br />

Expenditures upto 30.06.2012 8,934.312 3,317.936 12,252.248<br />

PSDP Allocation <strong>for</strong> 2012-2013 1,000.000 800.000 1,800.000<br />

Expenditures during the Month 22.961 365.477 388.438<br />

Current F/Y Expenditures 43.703 365.477 409.180<br />

Total Expenditures 8,978.015 3,683.413 12,661.428<br />

− Contract re-awarded to FWO on 09.03.2007 at a cost of Rs. 10,400.634 Million (equivalent to US$ 171.063 M).<br />

o Physical Progress 81.67 % against 96.26 %<br />

o Financial Progress 98.69 % against 97.84 %<br />

<strong>USAID</strong> has signed agreements with WAPDA to provide US$ 40 Million <strong>for</strong> the Power Portion of<br />

Gomal Zam Dam on 07.01.2011, US$ 40 Million <strong>for</strong> Irrigation Portion on 05.10.2011 and US$ 12<br />

Million <strong>for</strong> Waran Canal (under Gomal Zam Dam <strong>Project</strong>) on 30.07.2012.<br />

<strong>USAID</strong> has released US$ 55.089 Million so far.<br />