TEA PAM 55-20 Tiedown Handbook for Truck - Military Surface ...
TEA PAM 55-20 Tiedown Handbook for Truck - Military Surface ...
TEA PAM 55-20 Tiedown Handbook for Truck - Military Surface ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
FOURTH EDITION SDDC<strong>TEA</strong> <strong>PAM</strong>PHLET <strong>55</strong>-<strong>20</strong><br />
Vehicles in good condition can be driven onto the M1000. Personnel can load<br />
disabled vehicles using a winch on the M1070 tractor. When loading steel-tracked<br />
vehicles such as bulldozers, place 2- x 10-inch lumber under the tracks to prevent metal<br />
to metal contact. Place and reposition the lumber as the vehicle is being driven or<br />
winched onto the M1000 so steel grousers do not contact the deck. The M1000 deck can<br />
be tilted to allow gravity to roll payload vehicles into their final position.<br />
Figure 52 shows the M1000 carrying two M113s, which requires additional chains<br />
and loadbinders. The M1000 BII chains and loadbinders should go on the rear fittings of<br />
both M113s. To secure the front of each M113, use two 3/8-inch chain assemblies (NSN<br />
4010-00-443-4845 or NSN 4010-00-803-8858) and two loadbinders (NSN 3990-01-213-<br />
1746).<br />
Figure 53 shows the shoring required <strong>for</strong> the M104 Wolverine Bridge and<br />
Wolverine loaded on the M1000.<br />
68