Project Identification – Project Update<br />

1.5.01 Olympic Site<br />

Works for the 2012 Olympic Games are due for<br />

completion May 2012. From May 2013 onwards, the<br />

Olympic Park Legacy Company will transform the park<br />

- including the conversion of the concrete concourse<br />

into a major new park for <strong>London</strong>. 102 ha. will be<br />

designated Metropolitan Open L<strong>and</strong>, of which 45 ha.<br />

will be wildlife habitats.<br />

1.6.01 - Lea River Park<br />

In 2008 a design framework was completed for<br />

this major new park for <strong>London</strong> - an extension to<br />

the LVRP that will complete the 26 mile l<strong>and</strong>scape<br />

connection between mid Hertfordshire <strong>and</strong> the<br />

Thames. Component projects such as 1.6.02 Fatwalk<br />

<strong>and</strong> 1.6.39 Three Mills Green are progressing towards<br />

completion in the coming years.<br />

1.5.02 & 1.6.32 Greenway upgrade<br />

Improvements to the Olympic component of the<br />

Greenway - a linear park stretching from Victoria Park<br />

to the Thames at Beckton - including new ramped<br />

access at West-Ham Station is complete, while the<br />

extension to Beckton is an ongoing project for which<br />

delivery funding is being sought.<br />

1.6.02 - Fatwalk<br />

The delivery of the first phase of the Lea River Park - a<br />

continuous north-south riverside walking <strong>and</strong> cycling<br />

route - is underway. Planning permission has been<br />

gained for a series of structures <strong>and</strong> a connecting<br />

l<strong>and</strong>scape, <strong>and</strong> detailed design is ongoing.<br />

1.5.13 - Hackney Marshes<br />

The Hackney Marshes Centre has recently been<br />

completed, <strong>and</strong> pavilions along Mabley Green <strong>and</strong><br />

North Marshes are under construction. A L<strong>and</strong>scape<br />

masterplan including new paths, sports pitches,<br />

tree planting, <strong>and</strong> access points is underway. A first<br />

phase of l<strong>and</strong>scaping, funded by the Mayor, has been<br />

completed in early 2012.<br />

1.6.39 - Three Mills Green<br />

The transformation of the park space at Three Mills<br />

Green was completed in March 2011. The project<br />

addresses the shortfall in quantum <strong>and</strong> quality of<br />

facilities for existing communities, <strong>and</strong> anticipates<br />

significant new residential populations as surrounding<br />

development sites are brought forward. Three Mills<br />

Green is also a key linkage in the Fatwalk route.<br />