Project Identification – Project Update<br />
1.5.01 Olympic Site<br />
Works for the 2012 Olympic Games are due for<br />
completion May 2012. From May 2013 onwards, the<br />
Olympic Park Legacy Company will transform the park<br />
- including the conversion of the concrete concourse<br />
into a major new park for <strong>London</strong>. 102 ha. will be<br />
designated Metropolitan Open L<strong>and</strong>, of which 45 ha.<br />
will be wildlife habitats.<br />
1.6.01 - Lea River Park<br />
In 2008 a design framework was completed for<br />
this major new park for <strong>London</strong> - an extension to<br />
the LVRP that will complete the 26 mile l<strong>and</strong>scape<br />
connection between mid Hertfordshire <strong>and</strong> the<br />
Thames. Component projects such as 1.6.02 Fatwalk<br />
<strong>and</strong> 1.6.39 Three Mills Green are progressing towards<br />
completion in the coming years.<br />
1.5.02 & 1.6.32 Greenway upgrade<br />
Improvements to the Olympic component of the<br />
Greenway - a linear park stretching from Victoria Park<br />
to the Thames at Beckton - including new ramped<br />
access at West-Ham Station is complete, while the<br />
extension to Beckton is an ongoing project for which<br />
delivery funding is being sought.<br />
1.6.02 - Fatwalk<br />
The delivery of the first phase of the Lea River Park - a<br />
continuous north-south riverside walking <strong>and</strong> cycling<br />
route - is underway. Planning permission has been<br />
gained for a series of structures <strong>and</strong> a connecting<br />
l<strong>and</strong>scape, <strong>and</strong> detailed design is ongoing.<br />
1.5.13 - Hackney Marshes<br />
The Hackney Marshes Centre has recently been<br />
completed, <strong>and</strong> pavilions along Mabley Green <strong>and</strong><br />
North Marshes are under construction. A L<strong>and</strong>scape<br />
masterplan including new paths, sports pitches,<br />
tree planting, <strong>and</strong> access points is underway. A first<br />
phase of l<strong>and</strong>scaping, funded by the Mayor, has been<br />
completed in early 2012.<br />
1.6.39 - Three Mills Green<br />
The transformation of the park space at Three Mills<br />
Green was completed in March 2011. The project<br />
addresses the shortfall in quantum <strong>and</strong> quality of<br />
facilities for existing communities, <strong>and</strong> anticipates<br />
significant new residential populations as surrounding<br />
development sites are brought forward. Three Mills<br />
Green is also a key linkage in the Fatwalk route.<br />