Project Identification – Rolling Projects List<br />
Project<br />
Number<br />
1.6.33<br />
Project name Borough Project description Next steps<br />
Feeder cycle / pedestrian route Newham Improvements on gateways <strong>and</strong> routes through park to Grange Road. New l<strong>and</strong>scaping, tree planting <strong>and</strong> lighting.<br />
through Memorial Park<br />
Recreational Ground<br />
New resource centre <strong>and</strong> rugby club. Received planning permission, consultation ongoing, funding being examined.<br />
1.6.34 Whitelegg Road Newham Improved link between Plaistow Station <strong>and</strong> Memorial Recreation Ground. New l<strong>and</strong>scaping connects the Greenway<br />
via Whitelegg Road to <strong>London</strong> Road, received planning permission, funding being examined.<br />
1.6.35 Plaistow Town Centre <strong>and</strong> Newham New ramped footway / cycle path to <strong>London</strong> Road. Cycle / pedestrian link to Whitelegg Road, as part of s106 of the<br />
Links<br />
new Plaistow development, on hold at the moment, decision will be taken in 2008.<br />
1.6.36 North Woolwich Road This project has been renumbered as 2.9.02 <strong>and</strong> is included in Area Framework 2<br />
1.6.37 Peruvian Wharf This project has been renumbered as 2.9.01 <strong>and</strong> is included in Area Framework 2<br />
1.6.38 Thames path extension <strong>and</strong><br />
new Thames side open spaces<br />
This project has been renumbered as 2.9.03 <strong>and</strong> is included in Area Framework 2<br />
* Project stage: 0 = notional, 1 = scoping /briefing, 2 = feasibility study, 3 = outline designs, 4 = detailed designs, 5 = tender, 6 = implementation, 7 = management plans - ** At time of print project owner names are the current principal contacts<br />
Project Size<br />
(ha / m)<br />
Project Owner Total cost Funding in place Funding Required<br />
921 m Nicola Mackie (LB Newham) £2,500,000 £0 £2,500,000<br />
539 m Nicola Mackie (LB Newham) £1,400,000 £0 £1,400,000<br />
720 m LB Newham<br />
1.6.39 Fatwalk North Newham Route connecting the Fatwalk to the Olympic Park. Three Mills element completed. Implementation<br />
required post crossrail to the north, groves bridge<br />
completed March 2011.<br />
1km LDA, Steven Tomlinson £500,000 6<br />
1.6.40 Three Mills Green Newham Community Park with an improved playing field, banked spectator area, improved l<strong>and</strong>scaping <strong>and</strong> integrated play.<br />
The West side includes the Fatwalk element with activity <strong>and</strong> programme including ping pong tables.<br />
Project completed 2.8 ha LVRPA - Rob Cairns £750,000 £750,000 7<br />
1.6.41 East India Dock Basin Tower Hamlets Form a primary pleasure garden for <strong>London</strong> together with an enhanced Nature Reserve. Marks gateway to or<br />
summation of Lower Lea <strong>Valley</strong> Park where Lea joins Thames.<br />
Project development required. 5.2 ha LVRPA - Rob Cairns £1,000,000 £0 £0<br />
1.6.42 LRP-Twelve Trees Park Newham New Major park at Bromley by Bow part of the Lea River Park, Reusing the listed gas holders to make a major Confirm timetable for decommissioning / infrastructure 8.5ha Newham £10,000,000 0/1<br />
<strong>London</strong> attraction.<br />
works. Establish related development opportunities <strong>and</strong><br />
delivery plan. Identification of potential delivery<br />
partners.<br />
1.6.43 LRP-Abbey Mills Newham Opening up Thames Water's Abbey Mills as part of the Lea River Park to create a Wild l<strong>and</strong>scape that visitors can Thames Water to allow access to site, currently no set 10ha OPLC/MDC £500,000<br />
experience.<br />
date for when.<br />
1.6.44 Twelve Trees Bridge Lift Tower Hamlets New lift on the Bow Locks spit to connect with Twelve Trees Bridge. Allowing access connecting three banks of the Being designed <strong>and</strong> to be constructed by June 2011<br />
river <strong>and</strong> allowing access from Bromley by Bow station. Part of the Fatwalk project.<br />
20m BW Andy Nichols £1m<br />
1.6.45 A13 Connector Tower hamlets Walkway under <strong>and</strong> through A13 Old Iron Bridge. Forms part of the Fatwalk. Being designed <strong>and</strong> to be constructed by June 2012 300m TfL Michael Jackson £1m<br />
1.6.46 Poplar Reach Bridge Tower Hamlets New pedestrian <strong>and</strong> cyclist bridge connecting Tower Hamlets' Poplar <strong>and</strong> Newham's Cody Road Business Park.<br />
Part of the Fatwalk project.<br />
Being designed <strong>and</strong> to be constructed by June 2013 100m LB Newham £2m<br />
1.6.47 Three Mills Park Tower Hamlets New park to be delivered as public open space as part of the Tesco development. Planning application approved waiting for outcome of<br />
CPO enquiry. TESCO to deliver as per planning<br />
agreement.<br />
0.5 LB Tower Hamlets, TESCO tbc<br />
1.6.48 A12 Crossing improvements at Tower Hamlets Pedestrian crossing improvements associated with the notion of developing East of the A12 Taken forward by DfL, UDC LBTH as part of Bromley 173 m LB Tower Hamlets - Simone tbc<br />
Bromley by Bow<br />
by Bow SPD.<br />
Williams<br />
1.6.49 Aberfeldy Development Tower hamlets Development comprising 855new dwellings a new local centre<br />
<strong>and</strong> a new park.<br />
Pre application stage tbc<br />
1.6.50 High Street 2012 Newham Public Realm improvements on Stratford High Street with a series of small spaces along it's length created Improvements to be delivered pre 2013 2km LB Newham £5,000,000<br />
1.6.51<br />
Lea River Park - Poplar Reach<br />
Park<br />
Tower hamlets Poplar River Park is a project that exp<strong>and</strong>s the riverside park space of the phase 1 Fatwalk route to create a new Production of detailed masterplan study of the park 7.85ha LTGDC TBC 0/1<br />
local park related to the extraordinary setting of the double bend in the river. The park would connect back to an area <strong>and</strong> its surroundings to include assessment of<br />
existing green space within the Aberfeldy estate to create a varied park space - focussed in particular on community development opportunities <strong>and</strong> potential park phasing.<br />
use - to support existing <strong>and</strong> new residential development at its margins, <strong>and</strong> across the broader area, which Progress discussions with site owners. Ensure Section<br />
currently suffers from a lack of access to open space.<br />
106 contributions are secured from developments<br />
within the surrounding area, <strong>and</strong> are ring-fenced for the<br />
future delivery of the Park.<br />
1.6.52 Bow Lock Redevelopment Tower hamlets potential to improve riverside access along the west bank of the river Lea from Bow Lock to the new District Centre<br />
at Bromley by Bow including a towpath connector under the district line railway bridge at Twelve Trees Crescent<br />
LTGDC to agree design <strong>and</strong> implementation with key<br />
stakeholders<br />
na LTGDC TBC TBC TBC<br />
1.6.53 Lochnagar Junction Tower Hamlets New all movements junction at Lochnagar Street with the A12 to improve vehicular <strong>and</strong> pedestrian access between LTGDC to agree construction programme with TfL for na LTGDC £2.4m £2.4m £0<br />
Poplar <strong>and</strong> Langdon Park<br />
delivery by Summer 2011<br />
1.6.54 Ailsa Street Tower Hamlets The regeneration of Ailsa Street area to create improved employment space, a new primary school, new housing<br />
<strong>and</strong> a new park with improved riverside access between Poplar Riverside <strong>and</strong> Bow Lock.<br />
Agreeing strategy for delivery with key stakeholders. LTGDC TBC TBC TBC<br />
1.6.55 A13 Nutmeg Lane pedestrian Tower Hamlets New Toucan crossing to link Nutmeg lane to the Aberfeldy Estate to improve connections to <strong>and</strong> from Poplar LTGDC seeking agreement from TfL to deliver works<br />
LTGDC £400,000 £400,000 £0<br />
crossing<br />
Riverside<br />
by April 2011<br />
1.6.56 N1.4 Link Newham Issue: Potential connections revealed by Canning Town masterplan implementation. Project: North south<br />
Next steps: Signage LBN through developer<br />
TBC TBC TBC 0<br />
connection between Royal Victoria Dock (ExCeL) <strong>and</strong> Terence McMillan Stadium <strong>and</strong> Newham Hospital. Mostly<br />
implemented, signage only. Connection between Canning Town <strong>and</strong> former Limmo site. Limmo site is identified as<br />
a strategic site in LBN Core Strategy. Benefits: Consolidation of Masterplan intentions to create a more connected<br />
<strong>and</strong> active community. Reinforcement of connection between Custom House, Excel Waterfront <strong>and</strong> Britannia Wharf.<br />
contributions<br />
1.6.57<br />
Olympic Walking <strong>and</strong> Cycling<br />
Route Enhancements<br />
(OWCRE) Greenway<br />
Newham Public realm improvements, including Olympic <strong>and</strong> Legacy wayfinding Scoping complete. Next step is to identify specific route<br />
placement, complete base mapping <strong>and</strong> system<br />
development (e.g. Adding cycle routes)<br />
1.6.60 OWCRE Limehouse Cut Tower Hamlets Public realm improvements, including Olympic <strong>and</strong> Legacy wayfinding Scoping complete. Next step is to identify specific route<br />
placement, complete base mapping <strong>and</strong> system<br />
development (e.g. Adding cycle routes)<br />
1.6.61 OWCRE Lower Lea <strong>Valley</strong> Hackney, Tower<br />
Hamlets, Newham,<br />
Waltham Forest<br />
1.6.62<br />
1.6.63<br />
1.6.64<br />
1.6.65<br />
1.6.66<br />
3 Mills Lock & Water Control<br />
Structure<br />
Limehouse to Old Ford Water<br />
Taxi <strong>and</strong> Moorings<br />
Devons Road Interchange/<br />
Circus<br />
Bow Common Lane/ Cantrell<br />
Road Green Link<br />
Orchard Place/ Orchard Wharf/<br />
Leamouth Peninsula<br />
Public realm improvements, including Olympic <strong>and</strong> Legacy wayfinding Scoping complete. Next step is to identify specific route<br />
placement, complete base mapping <strong>and</strong> system<br />
development (e.g. Adding cycle routes)<br />
Tower Hamlets New lock <strong>and</strong> water control structure at Three Mills - Bromley by Bow - funding for FY07/08 to FY10/11 only Project completed ODA / LTGDC / DfT / Defra / LDA /<br />
TfL / BW<br />
TfL (Julie Dye <strong>and</strong> Tim Carter) £495,000 £495,000 £0 2<br />
TfL (Julie Dye <strong>and</strong> Tim Carter) £495,000 £495,000 £0 2<br />
TfL (Julie Dye <strong>and</strong> Tim Carter) £495,000 £495,000 £0 2<br />
£23,205,570 £17,887,981 £0<br />
Tower Hamlets Water taxi services between Old Ford Lock <strong>and</strong> Limehouse including additional pontoons (FY09/10 - FY10/11) Under Development LTGDC £249,039 £249,039 £0<br />
Tower Hamlets The existing environment along Devons Road between Prospects Park <strong>and</strong> local centre to the west, including<br />
Devons Road DLR Station is heavily dominated by cars, with significant visual clutter <strong>and</strong> confusing pedestrian<br />
access.<br />
Tower Hamlets Improve pedestrian links to existing green spaces <strong>and</strong> accessibility along street through new public realm<br />
improvements <strong>and</strong> improvements to visual links between GG route <strong>and</strong> adjoining open space; integrate new<br />
permitted <strong>and</strong> proposed development sites at Bow Common gasworks <strong>and</strong> Furze Street; ensure green frontage<br />
within future residential development<br />
Tower Hamlets Capitalise on heritage <strong>and</strong> views across river Lea <strong>and</strong> Thames by enhancing the riverside spaces <strong>and</strong> development<br />
areas, improving pedestrian access <strong>and</strong> circulation to area, including public realm improvements such as seating<br />
<strong>and</strong> way finding to improve accessibility; enhance existing bio=diversity <strong>and</strong> create new opportunities for wildlife<br />
habitat; integrate new permitted <strong>and</strong> proposed development sites; create links to across the river Lea to access the<br />
canning Town interchange<br />
1.6.67 Blackwall Reach Tower Hamlets The area along Naval Row, Robin hood Gardens Estate <strong>and</strong> Blackwall DLR station is being regenerated through the<br />
development of Robin hood Gardens Estate <strong>and</strong> is expected to yield public open space, a better interface between<br />
Poplar High street <strong>and</strong> Blackwall Station<br />
LB Tower Hamlets (Manmohan<br />
Dayal)<br />
Aspirational LB Tower Hamlets (Manmohan<br />
Dayal)<br />
Robinhhod Gardens pre application discussions are ongoing<br />
LB Tower Hamlets (Manmohan<br />
Dayal)<br />
LB Tower Hamlets (Manmohan<br />
Dayal)<br />
1.6.68 Blackwall Way improvements Tower Hamlets Improve public realm along river <strong>and</strong> road; greening of roads; LB Tower Hamlets (Manmohan<br />
Dayal)<br />
1.6.69 Southern Grove Lodge Tower Hamlets This stretch of l<strong>and</strong> along the TH Green Grid is dominated by large brick tower blocks, hard surfaces <strong>and</strong> amenity<br />
space with little planting <strong>and</strong> pedestrian scale features. The sequence of spaces include housing amenity l<strong>and</strong>,<br />
Southern Grove Lodge <strong>and</strong> garden (ex council office), the Cemetery entrance <strong>and</strong> wide pedestrian verge at Mile end<br />
Road. The opportunity has arisen to improve connections between Southern Grove <strong>and</strong> Mile end Park via the<br />
Council estate <strong>and</strong> develop a successful public realm.<br />
1.7 <strong>Valley</strong> Fringe Lowl<strong>and</strong>s<br />
1.7.01<br />
Holmesdale Tunnel Pocket<br />
Park<br />
Enfield Create areas of wildlife/conservation <strong>and</strong> allow community access. Application also includes funding for an<br />
additional Parks Outreach officer.<br />
Planning applications for the regeneration of the estate<br />
has been approved. This is expected to lead t some<br />
improvements of the open space <strong>and</strong> public realm<br />
LB Tower Hamlets (Manmohan<br />
Dayal)<br />
Stage 2 application to be submitted. LB Enfield tbc<br />
300,000 approx 250,000 through S<br />
106 money<br />
1.7.02 Painters Lane Enfield Gateway project opening up of small local park on the corner of Painters Lane. Stage 2 application to be submitted. LB Enfield tbc Gateway project<br />
Funding<br />
1.7.03 Turkey Street Enfield Enhancement of Waltham Gardens as part of the Gateway Project On site LB Enfield 6<br />
105,000<br />
Stage*<br />
33