07.02.2013 Views

Beneficiary Participation in Irrigation Water Management: The Kerala

Beneficiary Participation in Irrigation Water Management: The Kerala

Beneficiary Participation in Irrigation Water Management: The Kerala

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ecause of their vital importance to farm<strong>in</strong>g operations. <strong>The</strong> fact that PAC is the focal po<strong>in</strong>t<br />

of their <strong>in</strong>terest, while CC is not felt so important, makes CC dispensable and <strong>in</strong>significant;<br />

naturally therefore most of the CCs rema<strong>in</strong> dormant. Conceptually, CC should have active<br />

<strong>in</strong>teraction with the beneficiaries <strong>in</strong> the every day management of irrigation.<br />

Table 4.9 Frequency Distribution by Knowledge on Canal Committee<br />

Qn.<br />

No.<br />

4<br />

a<br />

b<br />

c<br />

d<br />

e<br />

f<br />

Statements OBs OMs Reaches-wise Total<br />

UR MR LR<br />

F % F % F % F % F %<br />

No. Canal<br />

Committee<br />

2 4.2 11 2.7 0 0.0 6 4.4 5 4.1<br />

Donot know 18 37.5 323 79.0 123 80.9 109 80.2 91 75.2<br />

<strong>The</strong>re is Canal<br />

Committee<br />

28 58.3 67 16.4 28 18.4 17 12.50 22 18.2<br />

Knowledge<br />

on structure<br />

Knowledge on<br />

office-bearers<br />

Implement<strong>in</strong>g<br />

decisions<br />

2<br />

3<br />

1<br />

4.2<br />

6.3<br />

2.1<br />

0<br />

8<br />

1<br />

0.0<br />

2.0<br />

0.24<br />

g<br />

Work<strong>in</strong>g 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0<br />

Table 4.10 Frequency Distribution by Knowledge on Details of Project Committee<br />

Qn.<br />

No.<br />

10<br />

a<br />

b<br />

Source: Field Survey<br />

Note: O.Bs - Office Bearers of BFAs, O.Ms - Ord<strong>in</strong>ary Members of BFA, Qn. No - Question Number<br />

<strong>in</strong> the SheduleU.R - Upper Reaches, M.R - Middle Reaches, L.R - Lower Reaches<br />

We f<strong>in</strong>d that canal committees had been formed only <strong>in</strong> cases <strong>in</strong> which the concerned<br />

government official, the Assistant Executive Eng<strong>in</strong>eer, who is the convenor of CCs, is<br />

committed and active. While the officials we talked to blamed for the non-performance, the<br />

lack of <strong>in</strong>terest of CCs the BFAs and their office-bearers, the BFAs members alleged lack of<br />

0<br />

1<br />

0<br />

0.0<br />

0.66<br />

0.0<br />

0<br />

6<br />

1<br />

0.0<br />

4.41<br />

0.74<br />

0<br />

1<br />

0<br />

40<br />

0.0<br />

0.83<br />

Statements OBs OMs Reaches-wise Total<br />

UR MR LR<br />

F % F % F % F % F %<br />

District<br />

Collector as 28 56.0 110 26.9 68 44.7 27 19.9 15 12.4<br />

Chairman and<br />

Eng<strong>in</strong>eer as<br />

Convener<br />

Don’t Know 20 41.7 284 69.4 103 67.8 77 56.6 104 86.0<br />

0.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!