Constructions<br />
Dragan Buđevac, Ph. D, pr<strong>of</strong>essor, director <strong>Delta</strong> Invest<br />
Hot summer DELTA CITY 67 BELGRADE<br />
BELVILLE BLOCK 67<br />
The <strong>Delta</strong> M Group has become a part <strong>of</strong> <strong>the</strong> consortium<br />
tak<strong>in</strong>g over <strong>the</strong> project <strong>of</strong> build<strong>in</strong>g <strong>the</strong> University Settlement<br />
<strong>in</strong> Belgrade. The <strong>Delta</strong> M Group and <strong>the</strong> Hypo Group<br />
make up <strong>the</strong> consortium as equal-rights partners and <strong>in</strong>vestors.<br />
<strong>Delta</strong> Invest has already taken over <strong>the</strong> management<br />
<strong>of</strong> <strong>the</strong> construction.<br />
The settlement, to be built for <strong>the</strong> needs <strong>of</strong> <strong>the</strong> organization<br />
<strong>of</strong> <strong>the</strong> 2009 Universiada to be held <strong>in</strong> Belgrade consists <strong>of</strong><br />
14 accommodation facilities (1,800 accommodation units,<br />
from studios to four-room apartments) with bus<strong>in</strong>ess<br />
premises on <strong>the</strong> ground floor and two bus<strong>in</strong>ess facilities<br />
with <strong>the</strong> total area <strong>of</strong> 255,862 square meters. Underneath<br />
all those facilities <strong>the</strong>re is an underground garage. At this<br />
stage <strong>of</strong> <strong>the</strong> construction, all <strong>the</strong> digg<strong>in</strong>gs and excavations<br />
have been completed,<br />
<strong>the</strong> necessary exchange<br />
and compact<strong>in</strong>g<br />
<strong>of</strong> <strong>the</strong> soil has been<br />
carried out and 60% <strong>of</strong><br />
all <strong>the</strong> piles have been<br />
<strong>in</strong>serted. Follow<strong>in</strong>g<br />
<strong>the</strong> announced tender,<br />
eight general contractors<br />
for <strong>the</strong> re<strong>in</strong>forced<br />
concrete construction<br />
have been chosen.<br />
WATER FACTORY<br />
MIONI<br />
In <strong>the</strong> vic<strong>in</strong>ity <strong>of</strong> Mionica, <strong>in</strong><br />
a record-break<strong>in</strong>g time period,<br />
<strong>in</strong> four months, a water<br />
factory, Mioni, has been constructed.<br />
It spreads over an<br />
area <strong>of</strong> 8,500 square meters complete with <strong>in</strong>frastructure,<br />
<strong>the</strong> spr<strong>in</strong>g, hydro-technical <strong>in</strong>stallations, park<strong>in</strong>g space, <strong>the</strong><br />
regulated river and stream, .embankments and state-<strong>of</strong>-<strong>the</strong>art<br />
technology.<br />
for <strong>Delta</strong> Invest<br />
At this moment, at <strong>the</strong> <strong>Delta</strong> City facility <strong>in</strong> Block 67 <strong>in</strong><br />
Belgrade, <strong>the</strong> utilities <strong>in</strong>stallations are be<strong>in</strong>g completed.<br />
The structure is f<strong>in</strong>ished, <strong>the</strong> glaz<strong>in</strong>g <strong>of</strong> <strong>the</strong> ro<strong>of</strong> lanterns<br />
and <strong>the</strong> stairwell lights is completed mak<strong>in</strong>g work <strong>in</strong> two<br />
shifts <strong>in</strong> <strong>the</strong> <strong>in</strong>terior possible. All <strong>the</strong> escalators and transport<br />
strips, <strong>the</strong> largest and <strong>the</strong><br />
most difficult parts <strong>of</strong> <strong>the</strong> equipment,<br />
have already been placed<br />
<strong>in</strong> <strong>the</strong>ir designed positions and, at<br />
<strong>the</strong> moment, <strong>the</strong> elevators are be<strong>in</strong>g<br />
mounted. The mount<strong>in</strong>g <strong>of</strong> <strong>the</strong><br />
facade construction made <strong>of</strong> granite<br />
ceramic, alum<strong>in</strong>um and glass<br />
has progressed considerably. In<br />
<strong>the</strong> <strong>in</strong>terior <strong>of</strong> <strong>the</strong> structure, 90%<br />
<strong>of</strong> <strong>the</strong> <strong>in</strong>stallations <strong>in</strong> <strong>the</strong> public<br />
area have been completed. At this<br />
moment, <strong>the</strong> polymer floor cover<strong>in</strong>g,<br />
plaster and wall-pa<strong>in</strong>t<strong>in</strong>g activities<br />
are underway.<br />
DELTA CITY<br />
PODGORICA<br />
At <strong>the</strong> <strong>Delta</strong> City Montenegro facility <strong>the</strong> design <strong>of</strong> <strong>the</strong><br />
second stage construction has been completed. So is <strong>the</strong><br />
support<strong>in</strong>g re<strong>in</strong>forced concrete structure <strong>of</strong> <strong>the</strong> mall. The<br />
steel ro<strong>of</strong> structure over <strong>the</strong> c<strong>in</strong>ema <strong>the</strong>ater has been<br />
mounted toge<strong>the</strong>r with <strong>the</strong> beams <strong>of</strong> <strong>the</strong> <strong>the</strong>ater stands.<br />
Next come <strong>the</strong> mount<strong>in</strong>g <strong>of</strong> <strong>the</strong> c<strong>in</strong>ema ro<strong>of</strong> and <strong>the</strong> placement<br />
<strong>of</strong> electrical and <strong>the</strong>rmo-technical <strong>in</strong>stallations <strong>of</strong><br />
<strong>the</strong> first stage construction.<br />