Constructions<br />

Dragan Buđevac, Ph. D, pr<strong>of</strong>essor, director <strong>Delta</strong> Invest<br />

Hot summer DELTA CITY 67 BELGRADE<br />

BELVILLE BLOCK 67<br />

The <strong>Delta</strong> M Group has become a part <strong>of</strong> <strong>the</strong> consortium<br />

tak<strong>in</strong>g over <strong>the</strong> project <strong>of</strong> build<strong>in</strong>g <strong>the</strong> University Settlement<br />

<strong>in</strong> Belgrade. The <strong>Delta</strong> M Group and <strong>the</strong> Hypo Group<br />

make up <strong>the</strong> consortium as equal-rights partners and <strong>in</strong>vestors.<br />

<strong>Delta</strong> Invest has already taken over <strong>the</strong> management<br />

<strong>of</strong> <strong>the</strong> construction.<br />

The settlement, to be built for <strong>the</strong> needs <strong>of</strong> <strong>the</strong> organization<br />

<strong>of</strong> <strong>the</strong> 2009 Universiada to be held <strong>in</strong> Belgrade consists <strong>of</strong><br />

14 accommodation facilities (1,800 accommodation units,<br />

from studios to four-room apartments) with bus<strong>in</strong>ess<br />

premises on <strong>the</strong> ground floor and two bus<strong>in</strong>ess facilities<br />

with <strong>the</strong> total area <strong>of</strong> 255,862 square meters. Underneath<br />

all those facilities <strong>the</strong>re is an underground garage. At this<br />

stage <strong>of</strong> <strong>the</strong> construction, all <strong>the</strong> digg<strong>in</strong>gs and excavations<br />

have been completed,<br />

<strong>the</strong> necessary exchange<br />

and compact<strong>in</strong>g<br />

<strong>of</strong> <strong>the</strong> soil has been<br />

carried out and 60% <strong>of</strong><br />

all <strong>the</strong> piles have been<br />

<strong>in</strong>serted. Follow<strong>in</strong>g<br />

<strong>the</strong> announced tender,<br />

eight general contractors<br />

for <strong>the</strong> re<strong>in</strong>forced<br />

concrete construction<br />

have been chosen.<br />

WATER FACTORY<br />

MIONI<br />

In <strong>the</strong> vic<strong>in</strong>ity <strong>of</strong> Mionica, <strong>in</strong><br />

a record-break<strong>in</strong>g time period,<br />

<strong>in</strong> four months, a water<br />

factory, Mioni, has been constructed.<br />

It spreads over an<br />

area <strong>of</strong> 8,500 square meters complete with <strong>in</strong>frastructure,<br />

<strong>the</strong> spr<strong>in</strong>g, hydro-technical <strong>in</strong>stallations, park<strong>in</strong>g space, <strong>the</strong><br />

regulated river and stream, .embankments and state-<strong>of</strong>-<strong>the</strong>art<br />

technology.<br />

for <strong>Delta</strong> Invest<br />

At this moment, at <strong>the</strong> <strong>Delta</strong> City facility <strong>in</strong> Block 67 <strong>in</strong><br />

Belgrade, <strong>the</strong> utilities <strong>in</strong>stallations are be<strong>in</strong>g completed.<br />

The structure is f<strong>in</strong>ished, <strong>the</strong> glaz<strong>in</strong>g <strong>of</strong> <strong>the</strong> ro<strong>of</strong> lanterns<br />

and <strong>the</strong> stairwell lights is completed mak<strong>in</strong>g work <strong>in</strong> two<br />

shifts <strong>in</strong> <strong>the</strong> <strong>in</strong>terior possible. All <strong>the</strong> escalators and transport<br />

strips, <strong>the</strong> largest and <strong>the</strong><br />

most difficult parts <strong>of</strong> <strong>the</strong> equipment,<br />

have already been placed<br />

<strong>in</strong> <strong>the</strong>ir designed positions and, at<br />

<strong>the</strong> moment, <strong>the</strong> elevators are be<strong>in</strong>g<br />

mounted. The mount<strong>in</strong>g <strong>of</strong> <strong>the</strong><br />

facade construction made <strong>of</strong> granite<br />

ceramic, alum<strong>in</strong>um and glass<br />

has progressed considerably. In<br />

<strong>the</strong> <strong>in</strong>terior <strong>of</strong> <strong>the</strong> structure, 90%<br />

<strong>of</strong> <strong>the</strong> <strong>in</strong>stallations <strong>in</strong> <strong>the</strong> public<br />

area have been completed. At this<br />

moment, <strong>the</strong> polymer floor cover<strong>in</strong>g,<br />

plaster and wall-pa<strong>in</strong>t<strong>in</strong>g activities<br />

are underway.<br />

DELTA CITY<br />

PODGORICA<br />

At <strong>the</strong> <strong>Delta</strong> City Montenegro facility <strong>the</strong> design <strong>of</strong> <strong>the</strong><br />

second stage construction has been completed. So is <strong>the</strong><br />

support<strong>in</strong>g re<strong>in</strong>forced concrete structure <strong>of</strong> <strong>the</strong> mall. The<br />

steel ro<strong>of</strong> structure over <strong>the</strong> c<strong>in</strong>ema <strong>the</strong>ater has been<br />

mounted toge<strong>the</strong>r with <strong>the</strong> beams <strong>of</strong> <strong>the</strong> <strong>the</strong>ater stands.<br />

Next come <strong>the</strong> mount<strong>in</strong>g <strong>of</strong> <strong>the</strong> c<strong>in</strong>ema ro<strong>of</strong> and <strong>the</strong> placement<br />

<strong>of</strong> electrical and <strong>the</strong>rmo-technical <strong>in</strong>stallations <strong>of</strong><br />

<strong>the</strong> first stage construction.<br />

3