22.08.2013 Views

i nstallation - Cascade Corporation

i nstallation - Cascade Corporation

i nstallation - Cascade Corporation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I NSTALLATION<br />

4<br />

5<br />

Flush hydraulic supply hoses<br />

A Install hoses using union fittings.<br />

B Operate auxiliary valves for 30 sec.<br />

C Remove union fittings.<br />

Mount clamp on truck carriage<br />

A Center truck behind clamp.<br />

B Tilt forward and raise carriage into position.<br />

C Engage upper mounting hooks with top carriage<br />

bar. Make sure centering tab engages the<br />

center notch on the carriage bar.<br />

D Lift the clamp 2 in. (5 cm) off pallet.<br />

ISO Class 2 – 15-17 mm<br />

ISO Class 3 – 18-20 mm<br />

ISO Class 2 – 8-9 mm<br />

ISO Class 3 – 10-11 mm<br />

Center<br />

Notch<br />

Truck<br />

Carriage<br />

Engage Notch<br />

CL0242.ill<br />

CL0098.ill<br />

CL2612.eps<br />

6033701 5<br />

A<br />

Engage Carriage<br />

Center Notch<br />

GA0092.ill<br />

B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!