i nstallation - Cascade Corporation
i nstallation - Cascade Corporation
i nstallation - Cascade Corporation
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
I NSTALLATION<br />
4<br />
5<br />
Flush hydraulic supply hoses<br />
A Install hoses using union fittings.<br />
B Operate auxiliary valves for 30 sec.<br />
C Remove union fittings.<br />
Mount clamp on truck carriage<br />
A Center truck behind clamp.<br />
B Tilt forward and raise carriage into position.<br />
C Engage upper mounting hooks with top carriage<br />
bar. Make sure centering tab engages the<br />
center notch on the carriage bar.<br />
D Lift the clamp 2 in. (5 cm) off pallet.<br />
ISO Class 2 – 15-17 mm<br />
ISO Class 3 – 18-20 mm<br />
ISO Class 2 – 8-9 mm<br />
ISO Class 3 – 10-11 mm<br />
Center<br />
Notch<br />
Truck<br />
Carriage<br />
Engage Notch<br />
CL0242.ill<br />
CL0098.ill<br />
CL2612.eps<br />
6033701 5<br />
A<br />
Engage Carriage<br />
Center Notch<br />
GA0092.ill<br />
B