i nstallation - Cascade Corporation
i nstallation - Cascade Corporation
i nstallation - Cascade Corporation
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A<br />
I NSTALLATION<br />
8<br />
B<br />
Cycle clamp functions<br />
With no load, cycle each clamp function<br />
several times.<br />
Check for operation in accordance with<br />
ITA (ISO) standards.<br />
Clamp and lift a maximum load. Sideshift left<br />
and right. Check for equal arm movement<br />
and adequate sideshift speed. If necessary,<br />
adjust relief valve cartridges (see Step 9).<br />
Check for leaks at the valve, fittings, hoses<br />
and cylinders.<br />
NON-SIDESHIFTING CLAMPS<br />
A Release Arms<br />
B Clamp Arms<br />
C (not used)<br />
D (not used)<br />
A<br />
CL2477.eps<br />
C<br />
B A<br />
D<br />
AUXILIARY VALVE<br />
FUNCTIONS<br />
GA0005.ill<br />
SIDESHIFTING CLAMPS<br />
A Sideshift Left<br />
B Sideshift Right<br />
C Release Arms<br />
D Clamp Arms<br />
CL2478.eps<br />
B A<br />
CL2479.eps<br />
6033701 7<br />
C<br />
A<br />
Hoist Down<br />
Hoist Up Tilt Back<br />
WARNING: Make sure all personnel are<br />
clear of the clamp during testing.<br />
SIDESHIFTING CLAMPS with<br />
SOLENOID ADAPITON<br />
A<br />
B<br />
Tilt Forward<br />
A Sideshift Left<br />
A Release Arms (press button)<br />
B Sideshift Right<br />
B Clamp Arms (press button)<br />
C<br />
B D<br />
A