Eco Piccolo V2 6049001.indd - Ikarus
Eco Piccolo V2 6049001.indd - Ikarus
Eco Piccolo V2 6049001.indd - Ikarus
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chassis Assembly<br />
Now use one drop of CA glue to stick the canopy<br />
mount # 67380 to the middle of the main frame #<br />
68245. Now the skid landing gear is clipped together.<br />
Now clip the skids # 67465 into the front and<br />
rear skid brackets # 67464 as shown in the drawing.<br />
The front part of the skid landing gear is now pushed<br />
into the slot in the chassis until it clicks in. Then the<br />
rear skid brackets, whereby care must be taken that<br />
the small lugs on the front click into the slots.<br />
Push the main gear wheel # 67372 onto the main rotor<br />
shaft # 67382 and use pliers to push the retaining<br />
pin # 67399 through the holes in the gear and shaft.<br />
Push the two bearings # 67571 into the housing,<br />
push the rotor shaft through them and retain from<br />
above using the rubber grommet # 67385.<br />
15