18.05.2014 Views

Aufstell- und Bedienungsanleitung Pelletofen ... - Pelletshome.com

Aufstell- und Bedienungsanleitung Pelletofen ... - Pelletshome.com

Aufstell- und Bedienungsanleitung Pelletofen ... - Pelletshome.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WP01_1_2010_de_en_fr_it_V10.doc 26 / 96<br />

Thank you for choosing our product!<br />

Make sure you read the instructions before setting up and starting to use your stove. This<br />

prevents damage that could be caused through improper installation or operation. The stove will<br />

then work optimally and not harm the environment.<br />

WAMSLER Haus <strong>und</strong> Küchentechnik GmbH wishes you cosy warmth and many relaxing hours<br />

with your pellet stove.<br />

Index<br />

1 Important Notes 27<br />

2 Dimensioned Drawing, Cable Layout 28<br />

3 System Specifications 29<br />

3.1 Minimum operation times / Integration of an external controller 29<br />

3.2 Room and ambient temperatures / moisture conditions during operation 29<br />

3.3 Chimney connection 29<br />

3.4 Combustion air supply 29<br />

3.5 Pellet quality 30<br />

3.6 Cleaning, servicing and maintenance 30<br />

3.7 Power / voltage supply 30<br />

4 Stove Specifications and Functional Description 31<br />

4.1 Technical data 31<br />

4.2 Delivery contents 31<br />

4.3 Functional description 31<br />

4.4 Operation of stove and heating mode 33<br />

4.5 Pre-selection of heat output 33<br />

4.6 Start-up 33<br />

4.6.1 Hopper feeding 34<br />

4.6.2 Switching on the stove 34<br />

4.7 Control panel 35<br />

4.8 Prior to start / ignition 40<br />

5 Malfunction Analysis, Fault Codes 40<br />

6 Cleaning and Maintenance 41<br />

6.1 Inspection and cleaning of the burn pot 41<br />

6.2 Cleaning of the viewing panel 42<br />

6.3 Cleaning of the surfaces 42<br />

7 Servicing 42<br />

7.1 Cleaning of the fuel gas draught <strong>com</strong>ponents 43<br />

7.2 Cleaning of the ash collector 44<br />

7.3 Cleaning of the burn pot 44<br />

7.4 Inspection of the air suction pipe 44<br />

7.5 Inspection and cleaning of the electrical <strong>com</strong>ponents 45<br />

7.6 Completion of servicing, trial run 45<br />

8 Fire Safety Regulations 45<br />

8.1 Furnishing in the radiation range 46<br />

8.2 Furnishing exterior to the radiation area 46<br />

8.3 Floor below and in front of the stove 46<br />

8.4 Objects in the area of the air inlet and circulation openings 46<br />

8.5 Spacing from the connection <strong>com</strong>ponents (flue pipe) 46<br />

9 Approved Fuels 47<br />

10 Storage of Pellets 47<br />

11 EC Declaration of Conformity 47<br />

12 Customer Service / Spare Parts 48<br />

13 Your Specialised Company 48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!