Jahresbericht 2006 - Biba - Universität Bremen
Jahresbericht 2006 - Biba - Universität Bremen
Jahresbericht 2006 - Biba - Universität Bremen
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
HYDROLock<br />
The Project designs and develops a sys-<br />
munity, to further develop it by covering<br />
all schools of thought in KM, to extend<br />
characterised by non-linearities due to<br />
the coupling of their subsystems. Hence,<br />
tem to lock and monitor manhole covers<br />
it to those European regions less well<br />
traditional methods of system and control<br />
electrically. A graphical user interface<br />
represented today, as well as to other<br />
theory are no longer applicable. Models<br />
is used for the centralized control and<br />
global regions, and to turn the existing<br />
of such networks will now be analysed<br />
monitoring of large numbers of manhole<br />
covers. Taking local requirements into<br />
account, several different communication<br />
channels are possible between the<br />
control unit at the manhole cover and<br />
the control room.<br />
KnowledgeBoard into a model and<br />
reference for virtual networks offering customised<br />
services, collaboration spaces,<br />
and a support infrastructure to European<br />
research projects, industrial players and<br />
other interested parties.<br />
with the methods of non-linear dynamics.<br />
Especially, the applicability of existing<br />
synchronisation theories will be investigated.<br />
If necessary, these theories will be<br />
extended by new, adapted methods,<br />
that allow the synchronsiation of the<br />
Projects<br />
(Hydrotec, since 10/2004)<br />
(EU, 01/2004-12/<strong>2006</strong>)<br />
subsystems in production and logistics<br />
IQ-S<br />
Schooling for Intelligent Qualification<br />
In addition to the academic education<br />
and different sectors of job training the<br />
Kegelrad-Mess-Software<br />
Bevel Gear Measurement Software<br />
This industrial project concerned itself with<br />
the advancement of a software for the<br />
networks. (s. page 8-9)<br />
(DFG, 05/2005-04/2007)<br />
MSA<br />
In cooperation with Ericsson GmbH a ser-<br />
institute completes his supply by dint of<br />
measurement of bevel gears.<br />
vice composition engine for SIP services<br />
further education. Main focus hereby is<br />
(Mahr GmbH, 03/2004-11/<strong>2006</strong>)<br />
was developed. It enables telecommu-<br />
the course of instruction called “IHK-<br />
Fachkraft für CNC-Technik”, in which<br />
– in cooperation with the educational<br />
KNN/CBR<br />
Case Based Reasoning<br />
nication operators to provide composed<br />
multimedia services in IMS based networks.<br />
(s. page 26-27)<br />
institution called “IQ-<strong>Bremen</strong>” – conventio-<br />
The approach was how expert knowledge<br />
(Ericsson GmbH, since 01/<strong>2006</strong>)<br />
nal cutting technicians are introduced to<br />
modern numeric controlled machining.<br />
The course, which is certificated by the<br />
chamber of industry and commerce,<br />
is carried out in small groups mainly on<br />
about production control with artificial<br />
neural networks could be processed and<br />
structured, so that control strategies and,<br />
according to, the applicable and adjusted<br />
neural networks could be selected<br />
OmRest<br />
Optimisation of material flow at<br />
robot-based unloading of packaged<br />
goods<br />
simulative basis and assisted by practical<br />
and implemented for new production<br />
The ambition of the project is the op-<br />
examples. Further practical training is pos-<br />
situations. Constitutively on these results a<br />
timisation of material flow and so the<br />
sible at one of our industrial partners.<br />
case-based reasoning system was deve-<br />
reduction of cycle times through the<br />
(IQ, 07/2005-06/2007)<br />
loped to add new practical production<br />
implementation of robotics for unloading<br />
KB 2.0<br />
KnowledgeBoard 2.0 – The European<br />
Knowledge and Capabilities<br />
Management Working Space<br />
The three goals for KB 2.0 are to activate<br />
cases.<br />
(DFG, 09/2004-08/<strong>2006</strong>)<br />
Knotensynchronisation<br />
Synchronisation of the nodes in production<br />
and logistics networks<br />
packaged goods (f.e. parcels) out of<br />
transport containers. Especially the delivery<br />
from transport systems to distribution<br />
systems will be viewed exemplarily. Beside<br />
the development of basic strategies, the<br />
strategies will be validated in a test-setup.<br />
and facilitate the European KM com-<br />
Production and logistics networks are<br />
(AiF 08/<strong>2006</strong>-01/2008)<br />
MarLife<br />
Integrated Life Cycle Management<br />
for the Maritime Industry<br />
The actual challenges in maritime industry<br />
are a rising profitability, an optimal<br />
environmental tolerance, a rising security,<br />
the adaptation to new transport tasks and<br />
the integration of ships as a carrier into<br />
intermodal transport chains. The Project<br />
aims at a distinct increase of reliability<br />
and profitability of ships’ operation and<br />
at the protection of the environment.<br />
During the MarLife Project an integrated<br />
life cycle management system will be<br />
developed which makes available case<br />
specific information to the ship-owner as<br />
a basis for decisions or for the initiation of<br />
adequate activities. (s. page 24-25)<br />
(BMBF, 01/<strong>2006</strong>-12/2008)<br />
41