Einbauanleitung Snow Way
Einbauanleitung Snow Way
Einbauanleitung Snow Way
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
CLEVIS PINCOTTER PINc CAUTIONDo not over tighten springs. If more than .015"(1/64") gap appears between coils damagecould occur during plowing.Spring must be installed with open end of toploop facing vehicle. Bottom loop position willvary.Figure 1-66. Remove the springs from the power pack carton.Hook springs onto blade with open end of loop facing up.(See Figure 1-7).INSTALL WITHOPEN END OF LOOPFACING VEHICLE0.015" GAP MAXIMUMJAM NUT9. Remove power unit from carton. Remove pump coverand install receiver using instructions included withcontrols package. Fill reservoir on pump with suppliedhydraulic fluid.10. Set lower hitch pins into slot on truck A-frame. Plug inpower and control harness and rotate light/lift bar intoposition. Lock in place by rotating cam handles. Set A-frame level using plow control. See for more information.11. Remove 3/4" lock nut, washer and bolt. Slide swingframe into A-frame. Replace 3/4" bolt, washer and locknut. Tighten hardware. (See Figure 1-8) and (See Figure1-9).EYE BOLT3/4" WASHER3/4"-16 NUTSPACERCOTTERPINFigure 1-77. Hook other end of spring onto eyebolt. Insert oneeyebolt on each side of the blade into the hole on theswing frame spring bracket. Use a nut on either side ofbracket to secure. (See Figure 1-7).8. Tighten springs until a .010" feeler gauge can passbetween two or more coils. (A 3x5 postcard isapproximately .010" thick.)1/2" X 2-3/8"CLEVIS PINSSPACER3/4"-16 BOLTCOTTER PINFigure 1-8