05.12.2012 Aufrufe

PDF: BACnet Europe Journal 11 - 10/09

PDF: BACnet Europe Journal 11 - 10/09

PDF: BACnet Europe Journal 11 - 10/09

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

ISSN 1614-9572<br />

<strong>BACnet</strong> <strong>Europe</strong><br />

<strong>11</strong><br />

<strong>10</strong>/<strong>09</strong> Krankenhaus-Erneuerung mit <strong>BACnet</strong><br />

Hospital Renovation with <strong>BACnet</strong> <strong>11</strong><br />

Energieeffiziente Begegnungsstätte<br />

Energy-efficient Community Center 21<br />

<strong>BACnet</strong> bei Heidelberger Druckmaschinen<br />

<strong>BACnet</strong> at Heidelberger Druckmaschinen 26<br />

Bessere Qualität von <strong>BACnet</strong> Projekten<br />

Higher Quality of <strong>BACnet</strong> Projects 33<br />

<strong>BACnet</strong> auf „GebäudeEffizienz 20<strong>09</strong>“<br />

<strong>BACnet</strong> at “GebäudeEffizienz 20<strong>09</strong>” 48<br />

<strong>Journal</strong><br />

Energieeffizienz in <strong>BACnet</strong> Projekten<br />

Energy Efficiency in <strong>BACnet</strong> Projects


With the DESIGO building automation system, you can significantly reduce energy consumption<br />

while at the same time optimize comfort. The system’s high control quality reduces<br />

energy consumption and ensures an especially pleasant room climate. Innovative energy saving<br />

functions allow you to sustainably preserve resources and therefore to lower costs. And<br />

an intelligent, easy-to-operate energy management system identifies saving potentials for<br />

all integrated building systems. For you, that means a system that really pays off and that can<br />

be used for all applications and expanded as needed – thanks to its high degree of flexibility.<br />

For more information, please visit www.siemens.com/desigo<br />

Answers for infrastructure.<br />

DESIGO – saves energy<br />

efficiently through intelligent<br />

building automation<br />

Flexible for use in any building or application<br />

Pictures used show the new court house in Gent, designed in 2007 by the architects Stéphane Beel and Lieven Achtergael from Beel-Achtergael architecten F.V and by Technum.


Editorial<br />

Notes<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong><br />

ISSN 1614-9572<br />

The <strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> is the <strong>Europe</strong>an<br />

magazine for building automation based on<br />

<strong>BACnet</strong> technology. Experts, practitioners<br />

and professionals show the way in applying<br />

and developing the <strong>BACnet</strong> standard – from<br />

building automation trends to devices and<br />

application projects; from qualification and<br />

training to testing and certification; from<br />

who’s who in the <strong>BACnet</strong> community to<br />

useful information on events and publications.<br />

Special attention is given to members and<br />

activities of the <strong>BACnet</strong> Interest Group<br />

<strong>Europe</strong> (BIG-EU).<br />

Distribution<br />

This bi-annual and bi-lingual <strong>Journal</strong> (English/German)<br />

can be ordered free of charge<br />

by partners, members, media representatives<br />

and friends of the <strong>BACnet</strong> <strong>Europe</strong> Interest<br />

Group (BIG-EU) – registered society. Order<br />

the <strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> by E-Mail from<br />

info@big-eu.org<br />

Online distribution<br />

The <strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> is posted as a<br />

Portable Document Format (<strong>PDF</strong>)-File to<br />

www.big-eu.org and www.bacnet.de<br />

Editor<br />

<strong>BACnet</strong> <strong>Europe</strong> Interest Group (BIG-EU),<br />

registered society,<br />

Droste-Hülshoff-Straße 1<br />

44141 Dortmund<br />

Germany<br />

Phone: +49-2 31-56 77 72 69<br />

Fax: +49-2 31-42 78 67 32<br />

E-mail: info@big-eu.org<br />

URL: www.big-eu.org<br />

Executive Board<br />

Volker Röhl, Strabag Property and Facility<br />

Services GmbH (President),<br />

Bill Swan, Alerton/Honeywell (Vicepresident)<br />

Gijs de Koning, Regel Partners B.V.<br />

Roger Braun, Siemens Schweiz AG<br />

(Treasurer)<br />

Editorial Office<br />

MarDirect Marketing Direct GbR<br />

Bruno Kloubert (Editor in chief),<br />

Carolin Grehl, Eva-Maria Erps<br />

Phone: +49-2 31-42 78 67 31<br />

E-mail: kloubert@mardirect.de<br />

Advertising<br />

MarDirect Marketing Direct GbR<br />

Britta von Helden<br />

Phone: +49-2 31-56 77 72 69<br />

Fax: +49-2 31-42 78 67 32<br />

E-mail: vonhelden@mardirect.de<br />

Picture credits<br />

BIG-EU, MarDirect and specified companies<br />

Copyright<br />

© BIG-EU 20<strong>09</strong> – Further editorial use of<br />

articles in the <strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> is<br />

encouraged (!) with reference to the source.<br />

Please send a specimen copy to the editor,<br />

or if published online, send the URL per<br />

mail to kloubert@mardirect.de<br />

<strong>BACnet</strong> ® is a registered trademark of the<br />

American Society of Heating, Refrigerating<br />

and Air Conditioning Engineers, Inc.<br />

(ASHRAE)<br />

<strong>BACnet</strong> <strong>Europe</strong><br />

<strong>Journal</strong><br />

Energieeffi zienz in <strong>BACnet</strong> Projekten<br />

Energy Effi ciency in <strong>BACnet</strong> Projects<br />

<strong>11</strong><br />

Inhalt – Content<br />

5 Bill Swan: <strong>BACnet</strong> bringt effiziente Gebäude – More <strong>BACnet</strong> – more efficient buildings<br />

6 <strong>BACnet</strong> auf der AHR Expo 20<strong>10</strong>: Europäische Gebäudetechnologie<br />

<strong>BACnet</strong> at the 20<strong>10</strong> AHR Expo: <strong>Europe</strong>an Building Technology<br />

7 <strong>BACnet</strong> Controller werden global gelistet – <strong>BACnet</strong> controllers to be globally listed<br />

Anwendungen – Solutions<br />

9 O Arena ist hochflexibel für multifunktionale Nutzung – High Flexibility for multipurpose O Arena<br />

2 2<br />

<strong>11</strong> Krankenhaus-Erneuerung mit <strong>BACnet</strong> – Hospital Renovation with <strong>BACnet</strong><br />

14 Kontinuierliche Modernisierung im Universitätsklinikum Würzburg<br />

On-going Modernisation at Würzburg University Center<br />

16 Erstes Energieeffizienz-Restaurant von Mc Donald’s – First energy-efficient Mc Donald’s restaurant<br />

18 Klinikum Wolfsburg mit <strong>BACnet</strong> stufenweise modernisiert<br />

Gradual Modernisation of Wolfsburg Hospital with <strong>BACnet</strong><br />

21 Energieeffiziente Begegnungsstätte im Südstadtforum Nürnberg<br />

Energy-efficient Community Center in the Nuremberg “Südstadtforum”<br />

24 Klinik Kirchheim-Nürtingen setzt auf <strong>BACnet</strong> – Kirchheim-Nürtingen Hospital opts for <strong>BACnet</strong><br />

26 Offenes Gebäudemanagement bei Heidelberger Druckmaschinen<br />

Open building management at Heidelberger Druckmaschinen<br />

28 <strong>BACnet</strong> für mehr Energieeffizienz und Umweltschutz<br />

<strong>BACnet</strong> for More Energy Efficiency and Pollution Control<br />

30 SNMP-Integration in <strong>BACnet</strong> beim Landschaftsverband Rheinland<br />

SNMP integration into <strong>BACnet</strong> at the Rhineland Regional Council<br />

<strong>BACnet</strong> insight<br />

33 Bessere Qualität von <strong>BACnet</strong> Projekten – Higher Quality of <strong>BACnet</strong> Projects<br />

36 Zeitschaltfunktionen in <strong>BACnet</strong> – Teil 2: Wie sind die Zeitschaltfunktionen in <strong>BACnet</strong> realisiert?<br />

Schedule-integration in <strong>BACnet</strong> – Part 2: How are the Scheduling Functions Realized in <strong>BACnet</strong>?<br />

38 Planung der Gebäudeautomation mit <strong>BACnet</strong> – wesentliche funktionelle Vorgaben<br />

Building Automation Planning with <strong>BACnet</strong> – Essential Functional Requirements<br />

Produkte – Products<br />

41 Alle <strong>BACnet</strong>-Daten auf einen Blick – die neuen L-VIS Touch Panels<br />

All <strong>BACnet</strong> Data at a Glance – the New L-VIS Touch Panels<br />

43 Produkte zur einfachen <strong>BACnet</strong> Integration – Products for Easy <strong>BACnet</strong> Integration<br />

44 Steigerung der Energieeffizienz durch novaPro Open<br />

Increasing Energy Efficiency with the Aid of novaPro Open<br />

45 Universeller Dolmetscher und mehr für <strong>BACnet</strong> – Universal Translators not more for <strong>BACnet</strong><br />

<strong>BACnet</strong> Interest Group<br />

46 <strong>BACnet</strong> in Multivendor-Systemen testen – Plugfest in Helsinki war ein Erfolg<br />

<strong>BACnet</strong> in multivendor-systems – 20<strong>09</strong> Plugfest Event Deemed a Success<br />

48 Mit intelligenter Gebäudetechnik zu mehr Gebäudeeffizienz<br />

Using Intelligent Building Automation for Greater Building Efficiency<br />

51 <strong>BACnet</strong> France auf der Interclima+elec Paris – <strong>BACnet</strong> France at Interclima+elec Paris<br />

51 Italienisches <strong>BACnet</strong> <strong>Journal</strong> am Start – <strong>BACnet</strong> Italy <strong>Journal</strong> on the Move<br />

54 Willkommen in der BIG-EU – Welcome to the BIG-EU<br />

55 <strong>BACnet</strong> Kalender – Calendar of <strong>BACnet</strong> Events<br />

Krankenhaus-Erneuerung mit <strong>BACnet</strong><br />

<strong>10</strong>/<strong>09</strong> Hospital Renovation with <strong>BACnet</strong> <strong>11</strong><br />

Energieeffi ziente Begegnungsstätte<br />

Energy-effi cient Community Center 21<br />

<strong>BACnet</strong> bei Heidelberger Druckmaschinen<br />

<strong>BACnet</strong> at Heidelberger Druckmaschinen 26<br />

Bessere Qualität von <strong>BACnet</strong> Projekten<br />

Higher Quality of <strong>BACnet</strong> Projects 33<br />

<strong>BACnet</strong> auf “GebäudeEffi zienz 20<strong>09</strong>”<br />

<strong>BACnet</strong> at „GebäudeEffi zienz 20<strong>09</strong>“ 48<br />

ISSN 1614-9572<br />

Titelbild<br />

Cover picture<br />

Energieeffizienz-Restaurant von<br />

McDonald´s in Achim bei Bremen<br />

Energy-efficient Mc Donald´s<br />

restaurant in Achim near Bremen<br />

© Mc Donald’s Deutschland Inc.<br />

Alle Ausgaben sind als<br />

Download im Servicebereich<br />

von www.big-eu.org verfügbar<br />

All issues can be downloaded<br />

from the service area of<br />

www.big-eu.org<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong> 3


<strong>BACnet</strong> Room Controllers<br />

Lower Your Total Installed Cost!<br />

VT7200 PIR<br />

Chilled Beam<br />

Controller<br />

Viconics Electronics Inc.<br />

9245 Langelier Blvd. • St-Leonard , Quebec • Canada • H1P 3K9 • Tel. : 1. 514 . 321-5660 • Fax: 1. 514 . 321-4150<br />

sales@viconics.com • www.viconics.com • www.communicatingthermostats.com<br />

VT7300 PIR<br />

Fan-Coil<br />

Controller


<strong>BACnet</strong> bringt<br />

effiziente Gebäude<br />

More <strong>BACnet</strong> –<br />

more efficient buildings<br />

Liebe Leser,<br />

Die Energieeffizienz von Gebäuden zu verbessern ist heute<br />

wichtiger denn je. Ursache hierfür sind nicht nur die hohen<br />

Energiepreise, sondern auch die Notwendigkeit, schädliche<br />

Umwelteinflüsse durch Gebäude zu reduzieren. Diese Auswirkungen<br />

gehen weit über die Mauern eines Gebäudes hinaus,<br />

nicht zuletzt durch den hohen Energieverbrauch können Kohlendioxide<br />

und Quecksilber-Strahlungen aus Kohle-Verbrennungsanlagen<br />

freigesetzt werden.<br />

Dem Ziel einer erhöhten Effizienz steht das Bedürfnis einer<br />

komfortablen und gesunden Umgebung für die Bewohner des<br />

Gebäudes gegenüber. Es ist einfach ein energieeffizientes Gebäude<br />

zu erstellen, das ungesund ist oder eins, das komfortabel<br />

ist aber einem gesteigerten Energieverbrauch benötigt. Aber<br />

es ist weitaus schwieriger beide Ziele gleichzeitig zu erreichen.<br />

Zu diesem Zweck haben sich Gebäude Verbände einschließlich<br />

der „Deutschen Gesellschaft für nachhaltiges Bauen“ (DGNB);<br />

und den sogenannte „Green Building“ Verbänden in den Niederlanden,<br />

Polen, Rumänien, England, Italien und Spanien zusammengeschlossen.<br />

Gemeinsam entwickeln sie Schulungen für<br />

qualifizierte Fachkräfte und ein System für die Zertifizierung<br />

nachhaltiger Gebäude, die sowohl energieeffizient als auch<br />

komfortabel sind.<br />

Dieses System definiert Messwerte zum Erreichen eines Energielevels,<br />

die über die Basiswerte der ASHRAE Standards 90.1<br />

und <strong>10</strong>0 hinausgehen. Wesentlicher Bestandteil zum Erreichen<br />

dieser Werte ist die Integration verschiedener Gebäudesysteme,<br />

einschließlich der Heizungs-, Lüftungs- und Klimasysteme sowie<br />

der Lichtsysteme.<br />

<strong>BACnet</strong> Technologien haben eine entscheidende und wachsende<br />

Bedeutung in der Erbauung und Steuerung nachhaltiger Gebäude.<br />

Ein einheitliches Protokoll vereinfacht und fördert die<br />

Integration verschiedener Systeme, die die Gesundheit und den<br />

Komfort der Bewohner steigern und gleichzeitig den Energieverbrauch<br />

auf ein notwendiges Minimum reduzieren.<br />

Eine einheitliche Gebäudeautomation wird außerdem eine spätere<br />

Erweiterung des Systems und das Hinzufügen neuer Komponenten<br />

erleichtern, auch wenn diese von anderen Herstellern<br />

kommen.<br />

<strong>BACnet</strong> ist die Zukunft nachhaltiger, gesunder, komfortabler<br />

und energieeffizienter Gebäude. Darum ist das Thema dieser<br />

Ausgabe des <strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong>: „Energieeffizienz in<br />

<strong>BACnet</strong> Projekten.“<br />

Viel Spaß beim Lesen des neuen <strong>BACnet</strong> <strong>Journal</strong>s!<br />

Dear Reader,<br />

Improving the energy efficiency of buildings is more important<br />

today than ever. This need is driven not only by high energy<br />

prices but by the need to reduce the building’s impact on its<br />

environment. This impact can reach far beyond its walls, and not<br />

least through its energy consumption which can, for example,<br />

result in undesirable carbon dioxide and mercury emissions from<br />

coal-fired plants.<br />

But this goal of increased efficiency is countered by the need to<br />

provide a comfortable and healthy interior environment for the<br />

buildings’ occupants. It is easy to provide an energy-efficient<br />

building that is unhealthy, or one that is comfortable but which<br />

requires major amounts of energy; it is far less easy to attain both<br />

goals simultaneously.<br />

To this end building organizations including the German Sustainable<br />

Building Council (DGNB); the Dutch, Polish, Romania and<br />

UK Green Building Councils; GBC Italia and GBC España have<br />

produced and use education and rating systems for sustainable<br />

buildings, buildings that are both energy-efficient and healthy.<br />

These systems define measures for achieving energy-efficiency<br />

that go beyond the basic levels established by ASHRAE standards<br />

90.1 and <strong>10</strong>0. A key part of those measures is the integration<br />

of various building systems, including but not at all limited to the<br />

HVAC and lighting systems.<br />

This is where <strong>BACnet</strong> will have an increasing role in the<br />

construction and operation of sustainable buildings. Having<br />

a common protocol used by the various building systems not<br />

only simplifies but encourages the integration of those systems,<br />

to maintain occupant health and comfort while reducing the<br />

building’s energy consumption to the minimum necessary to<br />

sustain that health and comfort.<br />

But even more than that, having a unified building automation<br />

system will also simplify the addition of future devices and future<br />

strategies, even those provided by manufacturers not represented<br />

in the initial installation.<br />

The future of sustainable, healthy, comfortable and energy-<br />

efficient buildings lies with <strong>BACnet</strong>. And so to that end, the<br />

theme of this issue of the <strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> is “Energy<br />

Efficiency in <strong>BACnet</strong> Projects.”<br />

Enjoy reading the new <strong>BACnet</strong> <strong>Journal</strong>!<br />

Bill Swan<br />

Honeywell/Alerton USA<br />

Vizepräsident der BIG-EU<br />

Vice-President of the BIG-EU<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong> 5


<strong>BACnet</strong> Interest Group<br />

<strong>BACnet</strong> auf der AHR Expo 20<strong>10</strong>:<br />

Europäische Gebäudetechnologie<br />

<strong>BACnet</strong> at the 20<strong>10</strong> AHR Expo:<br />

<strong>Europe</strong>an Building Technology<br />

Nach dem Erfolg der letzten<br />

beiden Jahre werden die<br />

Mitglieder der <strong>BACnet</strong><br />

Interest Group <strong>Europe</strong> (BIG-<br />

EU) auch 20<strong>10</strong> wieder auf<br />

der AHR Expo vertreten<br />

sein. Diese findet vom 25. bis<br />

27. Januar 20<strong>10</strong> in Orlando,<br />

Florida, statt. Die AHR<br />

Expo als traditionsreiche<br />

Messe für Heizung, Lüftung,<br />

Klimatisierung und Kühlung<br />

ist der Marktplatz für die<br />

Gebäudeautomation und die<br />

HLK-Industrie in Nordamerika.<br />

Von Jahr zu Jahr präsentieren<br />

sich mehr Fachleute<br />

auf der zunehmend internationalen<br />

Messe und nutzen die<br />

Gelegenheit zum Verkauf<br />

und Networking mit Vertre-<br />

6<br />

tern aus aller Welt. Mehr als<br />

1800 Aussteller, mehrere Industrieverbände<br />

und über<br />

25.000 Besucher aus aller<br />

Welt werden erwartet.<br />

Auch immer mehr europäische<br />

Anbieter nutzen den<br />

amerikanischen Markt erfolgreich<br />

für ihren Export.<br />

Ihre Produkte sind den Produkten<br />

der Konkurrenz überlegen,<br />

wie die Fachzeitschrift<br />

IKZ Haustechnik 7/<strong>09</strong> berichtet:<br />

„Die europäischen<br />

Hersteller sind ihren US-<br />

Wettbewerbern hinsichtlich<br />

Energieeffizienz, Systemorientierung,<br />

Nachhaltigkeit<br />

und Kundenfortbildung um<br />

<strong>10</strong> bis 15 Jahre voraus.“ Eine<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Einschätzung, die nicht nur<br />

die Amerikaner beeindruckt.<br />

Organisiert wird der europäische<br />

<strong>BACnet</strong> Stand wie<br />

schon in den letzten Jahren<br />

von dem BIG-EU Marketing<br />

Büro MarDirect. Den BIG-<br />

EU Mitgliedern wird auch<br />

für die kommende AHR<br />

Expo wieder ein umfassendes<br />

Servicepaket angeboten.<br />

After the success over the last<br />

two years, the members of<br />

the <strong>BACnet</strong> Interest Group<br />

<strong>Europe</strong> (BIG-EU) will be<br />

represented once again in<br />

20<strong>10</strong> with a <strong>BACnet</strong> stand at<br />

the AHR Expo. This will take<br />

place in Orlando, Florida<br />

Skyline von Chicago: Hier präsentierte sich die BIG-EU erfolgreich auf der AHR Expo 20<strong>09</strong>.<br />

Skyline of Chicago: Here, the BIG-EU was present at the AHR Expo 20<strong>09</strong>.<br />

from 25-27 January, 20<strong>10</strong>.<br />

As a trade fair for heating,<br />

ventilation, air conditioning<br />

and refrigeration with a long<br />

tradition, the AHR Expo is<br />

the marketplace for building<br />

automation and the HVAC<br />

industry in North America.<br />

Every year, more and more<br />

industry professionals showcase<br />

their products at this<br />

growing international trade<br />

fair and take the opportunity<br />

to sell and network with<br />

representatives from all over<br />

the world. More than 1800<br />

exhibitors, multiple industry<br />

associations and more than<br />

25,000 visitors are expected<br />

from around the world.<br />

Additionally, more and more<br />

<strong>Europe</strong>an suppliers are successfully<br />

taking advantage<br />

of the American market for<br />

their exports. Their products<br />

are superior to those of<br />

their competitors, as reported<br />

in July 20<strong>09</strong> by the German<br />

building services trade<br />

magazine, “IKZ Haustechnik”.<br />

“The <strong>Europe</strong>an manufacturers<br />

are around <strong>10</strong> to<br />

15 years ahead of their U.S.<br />

competitors in terms of energy<br />

efficiency, system orientation,<br />

sustainability and customer<br />

training.” This estimation<br />

impresses not only many<br />

Americans.<br />

As in years past, the <strong>Europe</strong>an<br />

<strong>BACnet</strong> booth is being<br />

organized by the BIG-EU<br />

marketing office, MarDirect.<br />

BIG-EU members will once<br />

again be offered a comprehensive<br />

service package for<br />

the upcoming AHR Expo.


<strong>BACnet</strong> Interest Group<br />

<strong>BACnet</strong> Controller werden global gelistet<br />

<strong>BACnet</strong> controllers to be globally listed<br />

<strong>BACnet</strong> Anwender aus Europa und USA unterzeichnen<br />

Abkommen für gemeinsames Testing und Listing.<br />

<strong>BACnet</strong> users in <strong>Europe</strong> and the U.S. sign cooperative<br />

testing and listing agreement.<br />

Die <strong>BACnet</strong> Interest Group<br />

<strong>Europe</strong> (BIG-EU) und die<br />

amerikanische <strong>BACnet</strong> International<br />

(BI) führen ihre<br />

BTL Produkt-Listings zusammen.<br />

Damit entsteht<br />

eine einzige globale Liste von<br />

<strong>BACnet</strong> Produkten mit BTL-<br />

Marke – dem Zeichen, das<br />

weltweit die Konformität<br />

zum <strong>BACnet</strong> Standard ISO<br />

16484-5 bestätigt.<br />

BIG-EU und BI unterzeichneten<br />

ein Abkommen, das<br />

die gemeinsame Spezifikation<br />

des Listing regelt.<br />

Alle gelisteten Produkte werden<br />

auf der Website www.<br />

bacnetinternational.org/<br />

btl/veröffentlicht. Die BIG-<br />

EU bringt auf ihrer Website<br />

www.big-eu.org zusätzlich<br />

eine Übersicht der Produkte,<br />

die nach europäischen Vorgaben<br />

zertifiziert sind.<br />

Unterschied von<br />

BTL-Marke und Zertifikat<br />

Im Vorgriff auf die strengen<br />

europäischen Regelungen<br />

zur Gebäudeeffizienz lassen<br />

viele europäische Hersteller<br />

die <strong>BACnet</strong> Konformität<br />

ihrer Produkte seit 2008 von<br />

akkreditierten Stellen zertifizieren<br />

– zusätzlich zum BTL-<br />

Listing. Im Unterschied zur<br />

BTL-Marke, die von den<br />

<strong>BACnet</strong> Testing Laboratories<br />

(BTL) verliehen wird, werden<br />

die Zertifikate nur von<br />

unabhängigen Instanzen ausgestellt.<br />

Die Zertifizierung<br />

setzt in Europa den höchsten<br />

Standard für Produkttests.<br />

Nutzer gehen damit sicher,<br />

dass die erforderlichen Funktionen<br />

enthalten und getestet<br />

sind.<br />

Darüber hinaus führt die<br />

BIG-EU auch den offenen<br />

Produktkatalog weiter. Diese<br />

Marktübersicht von <strong>BACnet</strong><br />

Produkten enthält die Selbsterklärungen<br />

und Datenblätter<br />

der Hersteller – unabhängig<br />

von Tests, Listings<br />

und Zertifikaten. Er ist unter<br />

www.big-eu.org/catalog/<br />

index.php zu finden.<br />

Hersteller können wählen<br />

„<strong>BACnet</strong> ist die bevorzugte<br />

Wahl für integrierte<br />

Gebäude systeme, die Kontrolle<br />

von Energiekosten und<br />

für zukunftssichere kommerzielle<br />

und institutionelle Einrichtungen“,<br />

erklärt Volker<br />

Röhl, der BIG-EU Präsident.<br />

„Daher ist es so wichtig, dass<br />

wir einerseits das BTL Listing<br />

über alle Länder hinweg<br />

gleich gestaltet haben<br />

und andererseits mit der Zertifizierung<br />

eine Lösung anbieten,<br />

die höchsten europäischen<br />

Anforderungen<br />

genügt.“ Nun müssten die<br />

Hersteller entscheiden, ob sie<br />

für ihren Zielmarkt den einen,<br />

den anderen oder beide<br />

Konformitätsnachweise benötigen.<br />

Mit dem Abkommen zum gemeinsamen<br />

Listing und der<br />

Rücksicht auf europäische<br />

Anforderungen konnten die<br />

europäischen und amerikanischen<br />

„<strong>BACnet</strong>eers“ ihre<br />

Partnerschaft weiter ausbauen.<br />

Andy McMillan, Präsident<br />

der BI, resümiert: „Vergleicht<br />

man unsere früheren<br />

Vereinbarungen mit dem<br />

neuen Abkommen, sind unsere<br />

Beziehung und auch den<br />

Wert des <strong>BACnet</strong> Protokolls<br />

zweifelsohne weiter gestärkt<br />

worden.“<br />

<strong>BACnet</strong> Interest Group <strong>Europe</strong><br />

(BIG-EU) and <strong>BACnet</strong> International<br />

have combined their<br />

BTL product listings. This creates<br />

a single global list of products<br />

with the <strong>BACnet</strong> BTL logo<br />

– the global sign of conformance<br />

to the <strong>BACnet</strong> standard<br />

ISO 16484-5.<br />

BIG-EU and BI signed an<br />

agreement that governs the<br />

common specification of the<br />

listing. All listed products<br />

will be published on the BI<br />

website at www.bacnetinternational.org/btl/.<br />

The BIG-<br />

EU will also give an overview<br />

of products that are certified<br />

according to <strong>Europe</strong>an<br />

standards on its website:<br />

www.big-eu.org.<br />

The difference<br />

between the BTL logo<br />

and certificate<br />

In anticipation of the strict<br />

<strong>Europe</strong>an regulations on<br />

building efficiency, many<br />

<strong>Europe</strong>an manufacturers<br />

have been certifying their<br />

products’ <strong>BACnet</strong> conformity<br />

through accredited bodies<br />

since 2008 – in addition<br />

to the BTL listing. In contrast<br />

to the BTL logo, which<br />

is awarded by the <strong>BACnet</strong><br />

Testing Laboratories (BTL),<br />

the certificates are issued only<br />

by independent authorities.<br />

The certification sets the<br />

highest standard for product<br />

testing in <strong>Europe</strong>. Users can<br />

thus be sure that the necessary<br />

functions are included<br />

and tested.<br />

In addition, BIG-EU will also<br />

continue with its open catalog.<br />

This market overview of<br />

<strong>BACnet</strong> products contains<br />

the self-declarations and<br />

datasheets of manufacturers<br />

– regardless of testing, listings<br />

and certificates. Online<br />

at www.big-eu.org/catalog/<br />

index.php.<br />

“<strong>BACnet</strong> is the preferred<br />

choice for integrated building<br />

systems that control<br />

energy costs as well as for<br />

sustainable commercial and<br />

institutional facilities”, explains<br />

Volker Röhl, the BIG-<br />

EU president. “This is why<br />

it is so important that on<br />

the one hand we have uniformly<br />

designed the BTL listing<br />

across all countries, and<br />

on the other hand with certification<br />

we provide a solution<br />

that meets the highest<br />

<strong>Europe</strong>an standards.” Now<br />

manufacturers must decide<br />

whether their products will<br />

need proof of conformity for<br />

one or the other target markets,<br />

or even for both target<br />

markets.<br />

With the agreement for common<br />

listing and the consideration<br />

for <strong>Europe</strong>an requirements<br />

the <strong>Europe</strong>an and<br />

American “<strong>BACnet</strong>eers” are<br />

able to strengthen their partnership.<br />

Andy McMillan,<br />

president of BI, sums it up:<br />

“If we compare our previous<br />

agreements with the new<br />

agreement, our relationship,<br />

and even the value of the<br />

<strong>BACnet</strong> protocol, has without<br />

a doubt been strengthened.”<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

7


ABB standard drives for HVAC.<br />

20 000 <strong>BACnet</strong> installations worldwide.<br />

Here’s why ABB standard drives for HVAC applications really<br />

make a difference:<br />

• Suitable for standard induction motors rated from 0,75 to<br />

355 kW (1 to 550 HP)<br />

• Native <strong>BACnet</strong> embedded as standard<br />

• Direct connection to <strong>BACnet</strong> MS/TP networks –<br />

no add-ons needed<br />

• Snap-on router as option - enables integration to<br />

<strong>BACnet</strong>/IP networks<br />

• BTL approved B-ASC (Application Specifi c Controller),<br />

conforms to ISO 16484-5:2007<br />

Visit us at www.abb.com/drives<br />

ABB standard drives for HVAC –<br />

fl uent in native <strong>BACnet</strong> – IP & MS/TP<br />

Frequenzumrichter für die Gebäudetechnik –<br />

beherrschen fl ießend <strong>BACnet</strong> – IP & MS/TP<br />

HKL-Frequenzumrichter von ABB.<br />

20 000 <strong>BACnet</strong> Installationen weltweit.<br />

Das sind die Gründe, warum HKL-Frequenzumrichter von ABB wirklich<br />

den Unterschied machen:<br />

• Für Standard-Asynchronmotoren mit einer Nennleistung von<br />

0,75 bis 355 kW (1 bis 550 HP) geeignet<br />

• <strong>BACnet</strong> standardmäßig integriert<br />

• Direkte Ankopplung an <strong>BACnet</strong> MS/TP-Netzwerke - kein Gateway<br />

notwendig<br />

• Aufsteckbarer Router ermöglicht Anbindung an <strong>BACnet</strong>/IP-Netzwerke<br />

• BTL-Zulassung B-ASC (Application Specifi c Controller),<br />

erfüllt ISO 16484-5:2007<br />

Besuchen Sie uns im Internet unter<br />

www.abb.de/motors&drives<br />

E-Mail: motors.drives@de.abb.com


Anwendungen Solutions<br />

O 2 Arena ist hochflexibel für<br />

multifunktionale Nutzung<br />

High Flexibility for multipurpose O 2 Arena<br />

In der Berliner O 2 World Arena stellen eine <strong>BACnet</strong>-basierte<br />

Gebäudeautomation und ein <strong>BACnet</strong>-basiertes Gebäudemanagement<br />

sicher, dass die multifunktionale Location<br />

schnell für die jeweiligen Events umgebaut werden kann.<br />

Die ABB Standard Drives für HLK sichern dabei die hohe<br />

Flexibilität der Einrichtungen.<br />

At the O 2 World Arena in Berlin, <strong>BACnet</strong> based building<br />

automation and facility management ensure that the<br />

location can be quickly configured to meet the demands<br />

of a broad spectrum of events. ABB standard drives for<br />

HVAC ensure high flexibility of its facilities.<br />

Im September 2008 nach<br />

nur zweijähriger Bauzeit<br />

eröffnet, ist die O 2 World<br />

Arena heute eine der größten<br />

und flexibelsten MultifunktionsarenenEuropas<br />

für Konzerte, Sport und<br />

Unterhaltung. Ein Umbau<br />

der Arena von Konzert- zu<br />

Sportveranstaltungen in wenigen<br />

Stunden ermöglicht eine<br />

höchsteffiziente Nutzung<br />

des Gebäudes. Die Daten<br />

und Fakten sind beeindruckend:<br />

17.000 Sitzplätze, 59<br />

Entertainment-Suiten, über<br />

<strong>10</strong>0 Verkaufsgeschäfte, zu<br />

regelndes Innenraumvolumen<br />

von 230.000 m³ Luft.<br />

Die Gebäudeautomation<br />

und das Gebäudemanagement<br />

wurde von der GFR<br />

Gesellschaft für Regelungstechnik<br />

und Energieeinsparung<br />

mbH geplant und realisiert.<br />

Einfache <strong>BACnet</strong>/<br />

IP-Anbindung<br />

Für die Drehzahlregelung der<br />

Lüftermotoren des HLK-Systems<br />

wählte GFR den ABB<br />

Standard Drive ACH550 für<br />

Die O 2 World Arena ist die neue Bühne für Entertainment und Sport in Berlin.<br />

O 2 World Arena is the new venue for entertainment and sports events in Berlin.<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

9


Anwendungen Solutions<br />

HLK-Anwendungen. Der<br />

entscheidende Vorteil dieser<br />

Frequenzumrichter ist<br />

der problemlose Anschluss<br />

an das <strong>BACnet</strong>/IP-Netz<br />

über einen optionalen, aufsteckbaren<strong>BACnet</strong>/IP-Router,<br />

der in den Frequenzumrichter<br />

eingebaut werden<br />

kann. Die 36 Frequenzumrichter<br />

im Leistungsbereich<br />

von 7,5 kW bis 45 kW<br />

wurden in mehrere <strong>BACnet</strong><br />

MS/TP-Teilnetze zusammengefasst.<br />

Die serielle<br />

Kommunikation erfolgt<br />

über EIA-485. Jedes Teilnetz<br />

ist über einen <strong>BACnet</strong>/<br />

IP-Router an das <strong>BACnet</strong>/<br />

IP-Netz angeschlossen. Jeder<br />

Router arbeitet für zwei<br />

bis acht Frequenz umrichter,<br />

so dass Teilnetze auf kostengünstige<br />

Weise eingerichtet<br />

werden können.<br />

Hohe Transparenz<br />

Der ACH550 ist standardmäßig<br />

mit <strong>BACnet</strong> MS/TP<br />

ausgestattet. <strong>BACnet</strong>/IP ist<br />

über den optionalen Router<br />

verfügbar. Verglichen<br />

mit den aufwändigeren Buskopplerlösungen,<br />

die einen<br />

erheblichen Parametrierungsaufwand<br />

erfordern,<br />

ermöglicht der BAC-net/<br />

IP-Router eine reale Transparenz<br />

zwischen dem Gebäudeautomations-<br />

und<br />

Managementsystem von<br />

GFR und den Frequen zumrichtern<br />

von ABB. Der<br />

<strong>BACnet</strong>/IP-Router RBIP-01<br />

ist leicht zu installieren.<br />

Dank der Web-Server-Funktionalität<br />

können Zugriff<br />

<strong>10</strong><br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Mit dem neuen <strong>BACnet</strong>-Router können die ABB Standard<br />

Drives für HLK an BAC-net/IP angeschlossen werden.<br />

The new <strong>BACnet</strong> router enables ABB standard drives for<br />

HVAC to be connected to <strong>BACnet</strong>/IP.<br />

und Konfiguration über einen<br />

Standard-Browser erfolgen.<br />

In der O 2 World Arena haben<br />

die Routermodule die<br />

Integration der ACH550-<br />

Frequenzumrichter in das<br />

<strong>BACnet</strong>-Konzept von GFR<br />

erheblich vereinfacht. Die<br />

problemlose Integration der<br />

Antriebe hat Zeit gespart<br />

und einen besseren Zugriff<br />

auf die Antriebsparameter<br />

ermöglicht. Aufgrund des<br />

<strong>BACnet</strong>-IP-Protokolls stehen<br />

die E/A der Frequenzumrichter<br />

auch anderen<br />

<strong>BACnet</strong>-Geräten, wie Direkten<br />

Digital-Controllern<br />

(DDCs) zur Verfügung. Die<br />

Zählerstände der Wartungs-<br />

und Energiesparzähler werden<br />

über das <strong>BACnet</strong>-Netz<br />

angezeigt, und der Zugriff<br />

darauf kann z. B. von den<br />

BAC-net-Bedien stationen<br />

(OWS) aus erfolgen.<br />

Normenkonformität<br />

Der ABB Standard Drive<br />

für HLK-Anwendungen<br />

erfüllt die internationale<br />

Norm <strong>BACnet</strong> DIN EN ISO<br />

16484-5:2007 und die europäische<br />

Norm für Oberschwingungen<br />

IEC/EN<br />

6<strong>10</strong>00-3-12, welche strenge<br />

Grenzwerte für die Oberschwingungen<br />

von Geräten,<br />

die an das öffentliche<br />

Stromnetz angeschlossen<br />

sind, festlegt. Die „Swinging<br />

Choke“ des Frequenzumrichters<br />

reduziert<br />

die Oberschwingungen im<br />

Teillastbereich um bis zu<br />

25%. Die Einhaltung der<br />

europäischen Norm bietet<br />

Sicherheit und vereinfacht<br />

die Projektierung sowie das<br />

Gebäudemanagement.<br />

Inaugurated in September<br />

2008 after a construction<br />

period of only two years,<br />

O 2 World Arena is one of<br />

the largest and most versatile<br />

multipurpose venues for<br />

concerts, sports events and<br />

entertainment in <strong>Europe</strong>.<br />

The ability to convert O 2<br />

World Arena from a concert<br />

venue to a sporting arena<br />

in only a few hours ensures<br />

that it can be used with maximum<br />

efficiency. The facts<br />

and figures are impressive:<br />

17,000 seats, 59 entertainment<br />

lounges, more than <strong>10</strong>0<br />

shops, and a total indoor air<br />

volume of 230,000 m³ to be<br />

controlled. The building automation<br />

and building management<br />

systems were designed<br />

and implemented by<br />

GFR Gesellschaft für Regelungstechnik<br />

und Energieeinsparung<br />

mbH.<br />

Easy connection to<br />

<strong>BACnet</strong>/IP<br />

GFR selected ABB ACH550<br />

standard drives for HVAC,<br />

to control the speed of the<br />

HVAC system’s fan motors.<br />

A key benefit of these drives<br />

is their straightforward connection<br />

to the <strong>BACnet</strong>/IP<br />

network through an optional<br />

snapon <strong>BACnet</strong>/IP router<br />

module, which can be<br />

mounted inside the drive.<br />

A total of 36 ABB standard<br />

drives, ranging from 7.5 to<br />

45 kW, are arranged in multiple<br />

<strong>BACnet</strong> MS/TP sub-networks<br />

using EIA-485 serial<br />

communication. Each subnetwork<br />

is connected to the<br />

<strong>BACnet</strong>/IP network through<br />

a <strong>BACnet</strong>/IP router. Each<br />

router serves two to eight<br />

drives, which enables cost-effective<br />

sub-networking.<br />

High Transparency<br />

The ACH550 is supplied<br />

with <strong>BACnet</strong> MS/TP as<br />

standard, and <strong>BACnet</strong>/IP is<br />

available with the optional<br />

router. Compared to more<br />

elaborate gateway solutions<br />

requiring a significant parametrization<br />

effort, the <strong>BACnet</strong>/IP<br />

router enables true<br />

transparency from GFR’s<br />

<strong>BACnet</strong> based building automation<br />

and facility management<br />

system to the ABB<br />

drives.<br />

The RBIP-01 <strong>BACnet</strong>/IP<br />

router module is easy to in-<br />

stall. Web server functionality<br />

enables access and configuration<br />

using a standard<br />

web browser. At O 2 World<br />

Arena the router modules<br />

considerably facilitated the<br />

integration of the ACH550<br />

drives into GFR’s <strong>BACnet</strong><br />

concept. Smooth integration<br />

of the drives saved time and<br />

ensured wider access to the<br />

drive parameters. Thanks to<br />

the <strong>BACnet</strong> protocol, drive<br />

I/Os are freely available to<br />

other <strong>BACnet</strong> units, such<br />

as direct digital controllers<br />

(DDCs). Maintenance and<br />

energy savings counters are<br />

visible to the <strong>BACnet</strong> network<br />

and accessible, for instance,<br />

from <strong>BACnet</strong> operator<br />

work stations (OWS).<br />

Conformance<br />

with standards<br />

The ABB standard drive for<br />

HVAC meets the international<br />

<strong>BACnet</strong> DIN EN ISO<br />

16484-5:2007 standard and<br />

conforms to the <strong>Europe</strong>an<br />

standard for harmonics,<br />

IEC/EN 6<strong>10</strong>00-3-12, which<br />

sets stringent limits with<br />

regard to current harmonics<br />

for devices connected to<br />

the public mains. In fact, the<br />

drive’s “swinging choke”<br />

feature reduces harmonics<br />

in partial load operation by<br />

up to 25%. Conformance<br />

with the <strong>Europe</strong>an harmonics<br />

standard helps to promote<br />

safety and streamline<br />

tasks related to planning<br />

and facility management.<br />

Klaus Allgaier<br />

ABB Automation Products<br />

GmbH<br />

klaus.allgaier@de.abb.com<br />

www.abb.com


Krankenhaus-Erneuerung mit <strong>BACnet</strong><br />

Hospital Renovation with <strong>BACnet</strong><br />

Die gesamte Gebäudeautomation im Krankenhaus von<br />

La Chaux-de-Fonds in der Schweiz wird bis Ende 20<strong>09</strong><br />

erneuert. Mit <strong>BACnet</strong> als Basis wird der Wunsch des technischen<br />

Dienstes umgesetzt, in Zukunft über ein offenes<br />

System zu verfügen.<br />

By the end of 20<strong>09</strong>, the entire building automation of<br />

La Chaux-de-Fonds Hospital in Switzerland will have been<br />

renovated. With <strong>BACnet</strong> as its basis, the technical service’s<br />

wish to have an open system for the future will become<br />

reality.<br />

La Chaux-de-Fonds liegt<br />

rund 1.000 Meter über dem<br />

Meeresspiegel und ist damit<br />

eine der höchstgelegenen<br />

Städte Europas. Die<br />

Stadt gehört zu den bekanntesten<br />

Uhrenstädten der<br />

Schweiz und verfügt über ein<br />

Kranken haus mit 150 Betten,<br />

das seit 2006 zur Gruppe der<br />

Hôpital neuchâtelois gehört.<br />

Das jetzige Hauptgebäude<br />

wurde 1966 errichtet.<br />

Die Anforderungen an die<br />

gebäudetechnischen Einrichtungen<br />

in Spitälern nehmen<br />

stetig zu. Integrale Gebäude-<br />

und Raumautomation<br />

ermöglicht die umfassende<br />

Kontrolle über den im Krankenhaus<br />

beträchtlichen<br />

Energieverbrauch, erhöht<br />

den Komfort und verbessert<br />

viele Prozesse. Luciano<br />

Vermot, der technische Leiter<br />

der Hôpital neuchâtelois,<br />

hatte für die umfassende<br />

Erneuerung der Gebäudeautomation<br />

eine klare Zielvorgabe:<br />

Die neue Plattform<br />

sollte auf einem offenen Standard<br />

basieren. Als er 2008 an<br />

der Fach messe Hilsa die neue<br />

<strong>BACnet</strong>- Lösung von Saia<br />

Burgess in Kombination mit<br />

ControlMaestro 2008 als<br />

SCADA kennen lernte,<br />

war für ihn eine entsprechende<br />

Auftragsvergabe an<br />

den Mitaussteller DPC SA<br />

als System integrationsfirma<br />

klar.<br />

Erneuerung bei<br />

laufendem Betrieb<br />

Die Herausforderung bestand<br />

u.a. darin, die gesamte<br />

Erneuerung bei laufendem<br />

Betrieb in Etappen<br />

durchzuführen, wofür pro<br />

Schaltgeräte-Kombination jeweils<br />

genau zwei Tage Auswechslungszeit<br />

zur Verfügung<br />

standen. Alle Funktionsbeschriebe<br />

und Schemata mussten<br />

neu erstellt werden. DCP<br />

erstellt jeweils pro Etappe<br />

die gesamte Schaltgerätekombination<br />

in ihrer Werkstatt,<br />

die Anlagen werden<br />

fertig programmiert und ausgetestet,<br />

bevor der Einbau vor<br />

Ort erfolgt. Bis Ende 20<strong>09</strong><br />

soll die Erneuerung abgeschlossen<br />

sein und ca. 3.000<br />

Datenpunkte sowie 1.500<br />

Meldungen und Alarme aufweisen.<br />

Eingesetzt werden Saia-<br />

Burgess SPS Typ PCD3 sowie<br />

5,7-Zoll-Webpanels als lokale<br />

Bedienelemente. Die Saia<br />

<strong>BACnet</strong> Building Controller<br />

sind universell einsetzbare,<br />

offene Automationsstationen,<br />

welche sich nahtlos in<br />

ein <strong>BACnet</strong>-Netzwerk integrieren<br />

lassen. Die Applikation<br />

kann wie gewohnt mit<br />

dem Programmier-Tool PG5<br />

Controls-Suite erstellt werden.<br />

Der darin enthaltene<br />

<strong>BACnet</strong>-Konfigurator ermöglicht<br />

die völlig freie Pa-<br />

Anwendungen Solutions<br />

Außenansicht des Krankenhaus La Chaux-de-Fonds.<br />

External view to the La Chaux-de-Fonds Hospital.<br />

rametrierung aller <strong>BACnet</strong>-<br />

Objekte. Somit lassen sich<br />

alle erdenklichen Aufgaben<br />

smart lösen.<br />

Einfaches<br />

<strong>BACnet</strong>-Engineering<br />

„Mit dem <strong>BACnet</strong>-Konfigurator<br />

im PG5 lassen sich<br />

ganz einfach EDE Dateien erstellen<br />

und importieren. Damit<br />

können wir alle <strong>BACnet</strong>-<br />

Objekte der Unterstationen<br />

in elektronischer Form an<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

<strong>11</strong><br />

(Quelle: BUS-House)


das Managementsystem<br />

ControlMaestro 2008 übergeben“,<br />

lautet das überzeugende<br />

Fazit des erfahrenen<br />

A u t o m a t i o n s p r a k t i k e r s<br />

Alexandre Mottas von PDC<br />

SA. Auch komplexe Kommunikationsaufgabenlassen<br />

sich schnell und fehlerfrei<br />

bewältigen. Ein <strong>BACnet</strong><br />

Building Controller verarbeitet<br />

bis zu 1.200 <strong>BACnet</strong>-Objekte.<br />

Neben den üblichen<br />

Objekten wie Analog, Digital,<br />

Mittelwert, Zähler und<br />

Pulskonverter stehen auch<br />

komplexe Objekte wie Scheduler<br />

und Kalender, Alarm,<br />

Event und Trendlog zur Verfügung.<br />

Somit verfügt das<br />

Krankenhaus von La Chauxde-Fonds<br />

über ein leistungsfähiges<br />

und offenes Gebäudemanagement.<br />

La Chaux-de-Fonds is situated<br />

around 1,000 metres<br />

above sea level, placing it<br />

among <strong>Europe</strong>’s highest cities.<br />

It is one of Switzerland’s<br />

best known centres for the<br />

clock and watch-making industry.<br />

The town has a 150<br />

bed hospital which, since<br />

2006, has belonged to the<br />

Neuchâtel Hospital Group.<br />

The existing main building<br />

was constructed in 1966.<br />

Ever greater demands are<br />

placed on hospital buildings<br />

with regard to their technical<br />

facilities. Integral building<br />

and room automation allows<br />

comprehensive control of<br />

the considerable energy consumption<br />

in a hospital, while<br />

increasing comfort and improving<br />

many processes. Luciano<br />

Vermot, the Technical<br />

Manager of Neuchâtel Hospital<br />

Group, had a clear objective<br />

for the complete renovation<br />

of the building automation.<br />

The new platform had<br />

to be based on an open standard.<br />

In 2008 when he attended<br />

the Hilsa Exhibition and<br />

learned about the new <strong>BACnet</strong><br />

solution, SCADA, from<br />

Saia Burgess in conjunction<br />

with ControlMaestro 2008,<br />

he was ready to place a corresponding<br />

contract with the<br />

co-exhibitor DPC SA as the<br />

system integration company.<br />

Renovation while hospital<br />

business proceeds<br />

The challenge included,<br />

among other things, carrying<br />

out the entire renovation in<br />

stages while business proceeded<br />

as usual, with exactly two<br />

days changeover time available<br />

per switchgear combination.<br />

All function descriptions<br />

and diagrams had to be reedited.<br />

For each stage, DPC<br />

creates the entire switchgear<br />

combination in its own workshop.<br />

The installations are<br />

fully programmed and tested<br />

before they are assembled on<br />

site. By the end of 20<strong>09</strong>, renovation<br />

should be complete,<br />

comprising arround 3000 data<br />

points and 1500 messages<br />

and alarms.<br />

Anwendungen Solutions<br />

Prinzipschema der neuen Gebäudeautomationsanlage<br />

mit <strong>BACnet</strong> im Krankenhaus La Chaux-de-Fonds samt<br />

Integration aller Energiemessungen.<br />

Pictorial schematic of the new building automation<br />

system with <strong>BACnet</strong> in La Chaux-de-Fonds Hospital,<br />

including the integration of all energy measurement.<br />

PCD3 type PLCs from Saia-<br />

Burgess are used, together<br />

with 5.7-inch web panels<br />

as local control elements.<br />

Saia <strong>BACnet</strong> Building Controllers<br />

are general purpose,<br />

open automation stations<br />

and can be seamlessly integrated<br />

into a <strong>BACnet</strong> network.<br />

The application is<br />

produced as usual with the<br />

PG5 Controls-Suite programming<br />

tool. It includes<br />

a <strong>BACnet</strong> configurator that<br />

allows complete freedom<br />

to set the parameters of all<br />

<strong>BACnet</strong> objects. As a result,<br />

a smart solution can be<br />

found for any conceivable<br />

task.<br />

Saia Building Controller mit nativer <strong>BACnet</strong>-Kommunikation<br />

in einer Schaltgerätekombination.<br />

Saia Building Controller with native <strong>BACnet</strong> communication in a switchgear combination.<br />

(© DPC)<br />

Simple <strong>BACnet</strong><br />

engineering<br />

Alexandre Mottas of DPC<br />

SA, an experienced automation<br />

practitioner, convincingly<br />

sums it up this way:<br />

“With the <strong>BACnet</strong> configurator<br />

in the PG5, EDE files<br />

are very easy to edit and<br />

import. We can therefore<br />

transfer all <strong>BACnet</strong> objects<br />

from substations electronically<br />

to the ControlMaestro<br />

2008 management system.”<br />

Even complex communications<br />

tasks can be handled<br />

speedily and without errors.<br />

A <strong>BACnet</strong> Building Controller<br />

processes up to 1200<br />

<strong>BACnet</strong> objects. Alongside<br />

the usual ones (such as<br />

analogue, digital, average,<br />

counter and pulse converter),<br />

complex objects are also<br />

available, e.g. scheduler<br />

and calendar, alarm, event<br />

and trendlog. As a result,<br />

La Chaux-de-Fonds Hospital<br />

has powerful, open<br />

building management at its<br />

disposal.<br />

Richard Staub<br />

richard.staub@bus-house.ch<br />

www.bus-house.ch<br />

Oliver Greune<br />

Product Manager<br />

Saia-Burgess Controls AG<br />

oliver.greune@<br />

saia-burgess.com<br />

www.start-controls.com<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

(© DPC)<br />

13


Anwendungen Solutions<br />

Kontinuierliche Modernisierung<br />

im Universitätsklinikum Würzburg<br />

On-going Modernisation<br />

at Würzburg University Center<br />

Gebäudeautomation von Johnson Controls sorgt<br />

für den effizienten und sicheren Betrieb des Universitätsklinikums<br />

Würzburg.<br />

Building automation by Johnson Controls takes<br />

care of efficient, reliable operation at Würzburg<br />

University Hospital.<br />

Würzburg zählt neben Heidelberg,<br />

Köln und Erfurt<br />

zu den ältesten Universitätsstädten<br />

in Deutschland.<br />

Auch im Bereich der Gebäudeautomation<br />

nimmt Würzburg<br />

eine Vorreiterrolle ein,<br />

denn hier entschied man sich<br />

frühzeitig dafür, in allen neuen<br />

Bauvorhaben nur noch das<br />

genormte <strong>BACnet</strong> Protokoll<br />

zuzulassen.<br />

So führte Johnson Controls<br />

bereits 1996 eine Managementebene<br />

mit Me-<br />

�����������<br />

���������������<br />

�����������<br />

���������<br />

14<br />

������������������<br />

��������������<br />

���� ������<br />

������������������<br />

������<br />

����������������������<br />

������<br />

�����������<br />

�������������� ��������������<br />

�����������<br />

tasys N1 Netzwerk und<br />

OWS Bedienstationen ein<br />

und schaltete bis 2003<br />

über 25.000 Datenpunkte<br />

auf. 2004 schalteten die<br />

Johnson Controls Techniker<br />

im Zentrum Operative Medizin<br />

weitere <strong>BACnet</strong> Controller<br />

von Siemens mit 20.000<br />

Datenpunkten auf und installierten<br />

2006 das Managementsystem<br />

MPlus mit N1-<br />

und <strong>BACnet</strong> OPC-Servern,<br />

um die Zukunftsfähigkeit<br />

des Systems zu gewährlei-<br />

������������������<br />

�������������������������������<br />

��������������<br />

������������ ������<br />

�����������<br />

�������<br />

������������<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

�����������������������������������<br />

�����������<br />

�������<br />

����������<br />

������<br />

sten. Dabei wurden sowohl<br />

die homogene DDC-Technik<br />

als auch die neuste <strong>BACnet</strong>-<br />

Technik unter der neuen<br />

Management-Ebene zusammengeführt<br />

und die 25.000<br />

Datenpunkte des historisch<br />

gewachsenen N1 Netzwerks<br />

in die Gebäudeleittechnik<br />

eingebunden. Zudem bauten<br />

die Experten einen zweiten<br />

MPlus Server als Rückfallebene<br />

auf, der es erlaubt,<br />

Generierungs- oder Wartungsarbeitendurchzufüh-<br />

������<br />

����������<br />

�������������<br />

������<br />

����������<br />

�������������<br />

������������<br />

��������������� ��������������� ������������ ��<br />

������<br />

�������<br />

������<br />

������� ���������������� ������� ��������� �������� ������<br />

������<br />

�������<br />

�������<br />

���������������� ������<br />

������� �����<br />

���������������<br />

�������<br />

����������������<br />

�����������<br />

������������<br />

������������<br />

�������������<br />

������<br />

�����������<br />

�������<br />

��<br />

������<br />

������ ��<br />

�������<br />

��������� ���������<br />

�������<br />

������� ���������<br />

��<br />

�������������� ���������<br />

������������ ������<br />

���������� ������<br />

�������� ������<br />

��������� ������<br />

������� ������<br />

�������� ������<br />

������<br />

�������������<br />

������������ ������<br />

����������<br />

��������<br />

���������<br />

�������<br />

���������<br />

����������������������<br />

�����������������������<br />

������������<br />

������<br />

����������<br />

������<br />

��������<br />

���������<br />

��������<br />

��������<br />

������������<br />

���������<br />

��������<br />

���������<br />

�������<br />

��������<br />

������������<br />

����������<br />

��������<br />

���������<br />

�������<br />

���������<br />

������������<br />

���������<br />

�������<br />

���������<br />

�������<br />

��������<br />

������������<br />

��������������<br />

���������������<br />

���������������<br />

Die GLT-Struktur der Uniklinik Würzburg.<br />

The system architecture of Würzburg University Hospital.<br />

������<br />

���������������<br />

������<br />

����������<br />

����������<br />

������������<br />

�������<br />

�������<br />

������������<br />

��������������<br />

���������������<br />

���������������<br />

ren, ohne den Betrieb zu beeinflussen.<br />

Leichte Bedienung<br />

und Überwachung<br />

Im Rahmen der Umsetzung<br />

stattete Johnson Controls<br />

die Gebäudeleittechnik mit<br />

Metasys ® Web Access inklusive<br />

SQL Datenbankserver<br />

und insgesamt fünf festen<br />

und zwanzig mobilen Bedienplätzen<br />

aus. Das integrierte<br />

Softwarepaket des MPlus Systems<br />

ermög licht die zentrale<br />

und komfortable Steuerung<br />

des Systems und eine moderne<br />

SQL Datenbank dient zur<br />

Historisierung von Alarm-<br />

und Trenddaten. Zudem generiert<br />

das System bei jedem<br />

Alarm zusätzlich zur Datenpunktbeschreibung<br />

und<br />

zum Alarmzustand ein dynamisches<br />

Dokument mit einer<br />

ausführlichen Beschreibung.<br />

So hat das Bedienpersonal jederzeit<br />

Zugriff auf alle wichtigen<br />

Informationen und<br />

kann schnell und ohne Zeitverlust<br />

angemessen auf eine<br />

Störung reagieren.<br />

Universelle Gebäudeleittechnik<br />

2007 wurden die Ablage der<br />

dynamischen Anlagenbilder,<br />

die Datensicherung und die<br />

dynamische IP-Vergabe über<br />

den DNS-Server zentralisiert.<br />

Zur besseren Nutzung<br />

in der IT Infrastruktur wurde<br />

MPlus zudem Bestandteil der<br />

IT-Domäne des Klinikums.


Luftaufnahme des Zentrums für Operative Medizin des Universitätsklinikums Würzburg.<br />

Bird’s eye view on the Centre for Operative Medicine of the Würzburg University Hospital.<br />

Gleichzeitig wurden Schnittstellen<br />

zum eingesetzten SAP<br />

R/3 System sowie zu Energiemanagementsystemenrealisiert.<br />

Dank der innovativen<br />

MPlus Technik können die<br />

Betreiber mit einem einheitlichen<br />

Adressschlüssel über<br />

alle Datenpunkte arbeiten,<br />

haben aber auch die Möglichkeit,Ursprungsadress-Schlüssel<br />

zu verwenden, die noch<br />

auf einigen älteren Unterlagen<br />

zu finden sind. Damit gelingt<br />

es, die getätigten Investitionen<br />

zu schützen und in<br />

eine <strong>BACnet</strong>-fähige Managementebene<br />

einzubinden.<br />

Bis Mitte 20<strong>09</strong> wurden im<br />

Rahmen der Errichtung des<br />

Zentrums für Innere Medizin<br />

weitere Systeme mit insgesamt<br />

37.000 Datenpunkten via<br />

<strong>BACnet</strong> aufgeschaltet, so dass<br />

das Gesamtsystem heute mehr<br />

als <strong>10</strong>0.000 Datenpunkte umfasst.<br />

Gegenwärtig werden<br />

mehr als 6.000 Datenpunkte<br />

über die Trendfunktionalität<br />

historisiert. Damit verfügt<br />

das Universitätsklinikum in<br />

Würzburg über ein zukunftsfähiges<br />

System, das die Bewirtschaftung<br />

der Gebäude<br />

sicherer und wirtschaftlicher<br />

macht.<br />

Würzburg is one of Germany‘s<br />

oldest university cities,<br />

alongside Heidelberg,<br />

Cologne and Erfurt. It also<br />

plays a leading role when it<br />

comes to building automation,<br />

following a decision<br />

taken in the early stages to<br />

use only the standardised<br />

<strong>BACnet</strong> Protocol for all new<br />

construction projects.<br />

It was as early as in 1996<br />

that Johnson Controls introduced<br />

a management level<br />

with a Metasys N1 network<br />

and OWS work stations,<br />

connecting up more than<br />

25,000 data points by 2003.<br />

In 2004, Johnson Controls<br />

technicians then connected<br />

up further <strong>BACnet</strong> controllers<br />

by Siemens in the Centre<br />

for Operative Medicine with<br />

20,000 data points, followed<br />

in 2006 by installation of the<br />

MPlus management system<br />

with N1 and <strong>BACnet</strong> OPC<br />

servers to warrant the viable<br />

sustainability of the system.<br />

In doing so, the new management<br />

level combined the<br />

homogeneous DDC system<br />

with the very latest <strong>BACnet</strong><br />

technology, also integrating<br />

the 25,000 data points of the<br />

historically evolved N1 network<br />

in the building auto-<br />

mation system. At the same<br />

time, the experts installed a<br />

second MPlus server as fallback<br />

level for performing<br />

generation or maintenance<br />

work without affecting ongoing<br />

operation.<br />

Easy control<br />

and monitoring<br />

During the implementation<br />

phase, Johnson Controls<br />

equipped the building automation<br />

system with Metasys<br />

® Web Access including an<br />

SQL database server, together<br />

with five stationary and<br />

twenty mobile workstations.<br />

The integrated software<br />

package of the MPlus system<br />

permits easy to operate<br />

central control of the system,<br />

and a modern SQL database<br />

archives alarm and trend data.<br />

In addition, whenever an<br />

alarm is triggered the system<br />

also generates a dynamic<br />

document with a detailed description,<br />

in addition to the<br />

datapoint description and<br />

alarm status. This gives the<br />

operating staff access to all<br />

important information at all<br />

times so that they can react<br />

to faults quickly and appropriately<br />

without losing any<br />

time.<br />

Anwendungen Solutions<br />

Universal building<br />

automation system<br />

In 2007, archiving of the dynamic<br />

plant diagrams, data<br />

back-up and dynamic IP allocation<br />

was automated using<br />

the DNS server. In addition,<br />

MPlus was integrated<br />

as a component of the hospital’s<br />

IT domain for better<br />

use of the IT infrastructure.<br />

At the same time, interfaces<br />

were provided to the hospital’s<br />

SAP R/3 system and<br />

energy management system.<br />

The innovative MPlus technology<br />

lets users work with a<br />

uniform address code for all<br />

data points, while also giving<br />

them the possibility of using<br />

original address codes still<br />

featured on some older documents.<br />

This protects the capital<br />

expenditure invested in<br />

the system while integrating<br />

a <strong>BACnet</strong>-capable management<br />

level.<br />

By mid 20<strong>09</strong>, setting up the<br />

Centre for Internal Medicine<br />

brought about the connection<br />

of additional systems<br />

with a total of 37,000 data<br />

points via <strong>BACnet</strong> so that today<br />

the entire system encompasses<br />

more than <strong>10</strong>0,000<br />

data points. Currently the<br />

trend functionality keeps historical<br />

records of more than<br />

6,000 data points. And so<br />

Würzburg University Hospital<br />

has a viable, sustainable<br />

system for a more reliable<br />

and profitable facility management<br />

for its buildings.<br />

Stefan Bosch<br />

Manager System Product<br />

Support & Engineering<br />

Johnson Controls Systems<br />

& Service GmbH<br />

Stefan.bosch@jci.com<br />

www.jci.com<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

15


Anwendungen Solutions<br />

Erstes Energieeffizienz-Restaurant<br />

von Mc Donald’s<br />

First energy-efficient Mc Donald’s restaurant<br />

Eine „adiabate“ Verdunstungskühlung der Menerga GmbH<br />

senkt den Strombedarf im weltweit ersten Energie effizienz-<br />

Restaurant von Mc Donald’s in Achim bei Bremen. Die<br />

Regelung und Steuerung der energieeffizienten Klimageräte<br />

und die Kommunikation zur Leitzentrale erfolgt mit <strong>BACnet</strong><br />

Building Controllern der SE-Elektronic GmbH.<br />

An “adiabatic” evaporative cooling system by Menerga<br />

GmbH reduces power requirements in the world’s first<br />

energy-efficient Mc Donald’s restaurant in Achim near<br />

Bremen. The regulation and control of the air conditioning<br />

and the communication to the building management<br />

system is run by <strong>BACnet</strong> building controllers from<br />

SE-Elektronic GmbH.<br />

Für den nachhaltigen Betrieb<br />

des weltweit ersten<br />

Energieeffizienz-Restaurants<br />

(EE-Tec) von McDonald’s<br />

kommen unter anderem<br />

zwei hocheffiziente Adsolair<br />

Klimageräte mit „adiabater“<br />

Verdunstungskühlung<br />

der Menerga GmbH zum<br />

Einsatz. In der vor kurzem<br />

in Achim bei Bremen eröffneten<br />

Filiale werden unter<br />

realen Bedingungen innovative<br />

Umwelttechnologien<br />

und alternative Energien wie<br />

Erdwärme, Sonnenenergie<br />

und Windkraft auf ihr Potenzial<br />

für eine nachhaltige<br />

Bewirtschaftung des Gebäudes<br />

geprüft.<br />

Bedarfsgerechte<br />

Frischluftzufuhr<br />

Um einen Beitrag zum globalen<br />

Klimaschutz zu<br />

leisten und gleichzeitig die<br />

Energiekosten zu senken,<br />

setzt das Gastronomie-Unternehmen<br />

bei der Raumlufttechnik<br />

auf zwei Klimageräte,<br />

die das Gebäude<br />

16<br />

neben der Geothermie mit<br />

„adiabater“ Verdunstung<br />

kühlen. Durch die Nutzung<br />

dieses natürlichen Kühlprozesses<br />

ist die zur Kälteerzeugung<br />

notwendige Leistung<br />

der Verdichter um<br />

rund 50% reduziert worden.<br />

Die hocheffiziente Wärmerückgewinnung<br />

der Geräte<br />

sorge zudem für eine<br />

energiesparende Klimatisierung<br />

des Küchen- und des<br />

Lobbybereichs. Zum Einsatz<br />

kommen dabei außerdem integrierte<br />

CO 2 -Sensoren für<br />

bedarfsgerechte Frischluftzufuhr<br />

in der Lobby und in der<br />

Küche. Die Regelung und<br />

Steuerung der Klimageräte<br />

erfolgt je Anlage mit einem<br />

<strong>BACnet</strong> Building Controller<br />

E-DDC3.1 von der SE-<br />

Elektronic GmbH.<br />

Firmenneutrale Anlage<br />

Bei der Aufschaltung und<br />

Kontrolle der Anlagen auf<br />

eine <strong>BACnet</strong>fähige Leittechnik<br />

werden alle relevanten<br />

Datenpunkte der Anlagen<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Die <strong>BACnet</strong> Building Controller E-DDC3.1 von<br />

SE-Elektronic sind im energieeffizienten Mc Donald’s<br />

bei Bremen im Einsatz.<br />

The E-DDC3.1 <strong>BACnet</strong> building controllers from SE-Elektronic<br />

are used in the energy-efficient Mc Donald’s near Bremen.


übergeben: Analoge Istwerte<br />

(z. B. Temperatur, Feuchte<br />

und Klappenstellung,<br />

Volumenstrom in m3/h),<br />

digitale Werte (Betriebsmeldungen,<br />

Störmeldungen,<br />

Wartungsmeldungen). Von<br />

der Leitzentrale erfolgt die<br />

Vorgabe der Sollwerte (Volumenstrom,<br />

CO 2 -Sollwert),<br />

Zeitprogramme und die Anlagenfreigabe.<br />

Das Monitoring<br />

und die Optimierung<br />

während des laufenden Betriebs<br />

sind somit firmenneutral<br />

gewährleistet.<br />

Zu Servicezwecken haben<br />

Hersteller und Anlagenbauer<br />

den Zugriff zu den Geräten<br />

über Modem (ISDN).<br />

Die Kommunikation kann<br />

wahlweise mit dem Servicetool<br />

oder über <strong>BACnet</strong> PTP<br />

(point to point) erfolgen.<br />

Das neue EE-Tec Restaurant<br />

ist nach Angaben des weltweit<br />

aufgestellten Gastronomie-Unternehmens<br />

ein<br />

wichtiger Bestandteil des eigenenNachhaltigkeits-Konzepts.<br />

Bei erfolgreichem Einsatz<br />

der energiesparenden<br />

Umwelttechnologie soll das<br />

nachhaltige Gebäudekonzept<br />

auf weitere McDonald’s<br />

Restaurants übertragen werden.<br />

Menerga GmbH als Hersteller<br />

von Klimageräten und<br />

SE-Elektronic GmbH als<br />

Hersteller von Steuer und<br />

Regelungstechnik in der Gebäudeautomation<br />

arbeiten<br />

seit Jahren in Kooperation<br />

miteinander und sorgen für<br />

optimierte, energieeffiziente<br />

Lösungen in der Gebäudeklimatisierung.<br />

For the sustainable operation<br />

of the world‘s first energy-efficient<br />

McDonald’s restaurant<br />

(EE-Tec), amongst<br />

other things two highly efficient<br />

Adsolair air conditioning<br />

units with “adiabatic”<br />

evaporative cooling are used,<br />

made by Menerga GmbH.<br />

In the franchise location recently<br />

opened in Achim near<br />

Bremen, innovative environmentally<br />

friendly technologies<br />

and alternative energy<br />

sources such as geothermal<br />

energy, solar energy and<br />

wind power are being tested<br />

for their potential to sustainably<br />

supply the building.<br />

Fresh air infeed as required<br />

In order to make a contribution<br />

to global climate protection<br />

and simultaneously<br />

reduce energy costs, the restaurant<br />

company relies on<br />

two air conditioning units<br />

for room ventilation which<br />

cool the building using “adiabatic”<br />

evaporative cooling,<br />

alongside geothermal energy.<br />

Through the use of this natural<br />

cooling process, the capacity<br />

of the compressors required<br />

for cooling has been<br />

reduced by around 50%. The<br />

highly efficient heat recovery<br />

system of the apparatus also<br />

ensures energy-saving air conditioning<br />

of the kitchen and<br />

lobby areas. Integrated CO 2<br />

sensors are used for the infeed<br />

of fresh air as required in the<br />

lobby and in the kitchen. The<br />

regulation and control of each<br />

air conditioning unit is run by<br />

an E-DDC3.1 <strong>BACnet</strong> building<br />

controller manufactured<br />

by SE-Elektronic GmbH.<br />

Multivendor system<br />

During the connection<br />

and regulation of the system<br />

equipment by means of<br />

<strong>BACnet</strong>-compatible control<br />

technology, all relevant data<br />

points relating to the system<br />

are transmitted, including analogue<br />

measured values (e.g.<br />

temperature, humidity, flap<br />

position, flow rate in m³/h),<br />

and digital values (operational<br />

messages, fault messages,<br />

maintenance messages). The<br />

nominal values (flow rate,<br />

nominal CO 2 value), are specified<br />

by the control centre, timer<br />

programmes and the system<br />

release. Monitoring and<br />

optimisation during running<br />

operation are thus guaranteed<br />

without any negative consequences<br />

for the company.<br />

For purposes of servicing,<br />

the manufacturer and system<br />

engineers are able to access<br />

the apparatus via modem<br />

(ISDN). The communication<br />

can take place either using<br />

the service tool or via <strong>BACnet</strong><br />

PTP (point to point). According<br />

to information provided<br />

by the global restaurant<br />

company, the new EE-Tec<br />

Anwendungen Solutions<br />

Energieeffizienz-Restaurant von Mc Donald´s in Achim bei Bremen.<br />

Energy-efficient Mc Donald´s restaurant in Achim near Bremen.<br />

Restaurant is an important<br />

component of their corporate<br />

sustainability concept. If the<br />

utilisation of the energy-saving<br />

environmentally friendly<br />

technology is successful, the<br />

sustainable building concept<br />

is to be rolled out in other<br />

McDonald’s restaurants.<br />

As a manufacturer of air<br />

conditioning units, Menerga<br />

GmbH has for years been<br />

working in cooperation with<br />

SE-Elektronic GmbH, a manufacturer<br />

of control and regulation<br />

technology in building<br />

automation, and togeth-<br />

er they have been ensuring<br />

optimised, energy efficient<br />

solutions in building climate<br />

control.<br />

Bogomir Dajcman<br />

Executive Director<br />

SE-Elektronic GmbH<br />

info@se-elektronic.de<br />

www.se-elektronic.de<br />

Dr. Jürgen Röben<br />

Executive Director<br />

Menerga GmbH<br />

info@menerga.com<br />

www.menerga.com<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

17<br />

(© McDonald’s Deutschland Inc)


Anwendungen Solutions<br />

Klinikum Wolfsburg mit <strong>BACnet</strong><br />

stufenweise modernisiert<br />

Gradual Modernisation of<br />

Wolfsburg Hospital with <strong>BACnet</strong><br />

Im Klinikum Wolfsburg realisierte die Firma Ebert-Ingenieure<br />

ein Multivendor-Gebäudeautomationssystem. Bei der<br />

stufenweisen Sanierung und Erweiterung der Gebäudekomplexe<br />

kamen die Vorteile des offenen <strong>BACnet</strong><br />

Standards zum Tragen.<br />

In the Wolfsburg Hospital, Ebert-Ingenieure realised a<br />

multivendor building automation system. During the<br />

gradual modernisation and expansion of the building<br />

complexes, the advantages of the open <strong>BACnet</strong> standard<br />

became apparent.<br />

Das Klinikum der Stadt<br />

Wolfsburg behandelt jährlich<br />

rund 28.000 Patienten stationär.<br />

Um den Patienten einen<br />

Aufenthalt in einem modernen<br />

Klinikum zu bieten und<br />

das Patientenaufkommen bewältigen<br />

zu können, hat man<br />

seit 2001 sukzessive die Bestandsgebäude<br />

modernisiert<br />

und durch neue Gebäudekomplexe<br />

ergänzt. Ein wichtiger<br />

Meilenstein dieses Sanierungs-<br />

und Ausbaukonzeptes<br />

war der Neubau des Betten-<br />

18<br />

hauses G mit seinen kleineren,<br />

patientenfreundlichen Raumeinheiten,<br />

das 2005 eröffnet<br />

wurde. Der anschließende<br />

Umbau von Haus C 2007 und<br />

die Verbindung der beiden<br />

Gebäude fanden nicht nur aus<br />

herkömmlich bautechnischer<br />

Sicht statt, sondern auch hinsichtlich<br />

der Gebäudeautomation<br />

und Anlagensteu erung.<br />

Technikausstattung<br />

im Bettenhaus<br />

Die Systemanforderungen des<br />

Das neue Bettenhaus G des Klinikums Wolfsburg.<br />

The new ward block G of Wolfsburg Hospital.<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Gebäudetyps Bettenhäuser im<br />

Klinikumfeld sind vergleichsweise<br />

weniger komplex. Mit<br />

der typischen Technikausstattung<br />

wie Lüftungszentralen<br />

auf dem Dach, kombinierte<br />

Technikzentralen mit<br />

Lüftungsanlagen, Fernwärmeeinspeisung,Heizungsverteiler,<br />

Warmwasserbereitungen,<br />

Elektro-Gebäudehauptverteilung<br />

im Keller und kleinen<br />

Wandschränken in den Etagen,<br />

auf die die dezentralen<br />

Datenpunkte bspw. der<br />

Brandschutzklappen oder Volumenstromregleraufgeschaltet<br />

werden, ist er daher eher<br />

mit hochwertigen Verwaltungsbauten<br />

vergleichbar. Mit<br />

270 Betten auf vier Geschossebenen<br />

und einer Bruttogrundfläche<br />

von 16.397 m²<br />

hatte das Projekt die passende<br />

Größenordnung und ein ent -<br />

spr echendes zu steuerndes Anlagenvolumen,<br />

um <strong>BACnet</strong> als<br />

eine wirtschaftliche Alternativlösung<br />

anzubieten.<br />

Neutrale Ausschreibung<br />

Während man sich bei dem<br />

neuen Bettenhaus im Klinikum<br />

erstmalig für den Einsatz<br />

von <strong>BACnet</strong> entschied,<br />

stützt sich die Technik der Gebäudeleitwarte<br />

weiterhin auf<br />

JCI. Diese mit einem engagierten<br />

Bauherrn und dem Betreiber<br />

für das Projekt gefundene<br />

Lösung bedeutet, dass die alte<br />

JCI-Gebäude leitwarte auf die<br />

neueste Version mit der Fähigkeit<br />

zur Kommunikation<br />

mittels <strong>BACnet</strong> migriert wurde<br />

und so die neuen Bauabschnitte<br />

neutral mit <strong>BACnet</strong>-<br />

A u t o m a t i o n s s t a t i o n e n<br />

ausgeschrieben werden konnten.<br />

Vor der Vergabe wurden<br />

damals sicherheitshalber Systemtests<br />

zwischen den Automationsstationen<br />

und der<br />

Leitwarte durchgeführt, denn<br />

<strong>BACnet</strong> war zu diesem Zeit-


punkt als Standard relativ neu.<br />

Bei der Fertigstellung 2005 ist<br />

das „Bettenhaus G“ mit dem<br />

Fabrikat Kieback&Peter auf<br />

die neue <strong>BACnet</strong>-fähige JCI-<br />

Leitwarte aufgeschaltet worden.<br />

Multivendor GA-System<br />

Inzwischen sind <strong>BACnet</strong>-Automationsstationen<br />

Standard<br />

geworden und im Klinikum<br />

der Stadt Wolfsburg 2007 der<br />

zweite Bereich im Haus C (Bettenzimmer)<br />

mit dem Fabrikat<br />

Sauter-Cumulus und 20<strong>09</strong> der<br />

dritte Bereich im Haus B und<br />

Y (OP/ITS) mit dem Fabrikat<br />

JCI erfolgreich in Betrieb gegangen<br />

und werden auf die bestehende<br />

GLT aufgeschaltet.<br />

Die Firma Ebert- Ingenieure<br />

plant seit Jahren für viele Projekte<br />

<strong>BACnet</strong> als Gebäudeautomationssystem,<br />

versucht<br />

aber dabei immer die Kosten<br />

und Systemanforderungen gegeneinander<br />

abzuwägen.<br />

Gerade für einen stufenweisen<br />

Ausbau separater und<br />

unabhängiger Gebäudeteile<br />

mit mehreren Bauabschnitten<br />

– wie in diesem Fall fast<br />

über ein Jahrzehnt – eignet<br />

sich <strong>BACnet</strong>. Man kann jeweils<br />

den neuesten Stand der<br />

Technik im Bauabschnitt ausschreiben<br />

und an die bestehende<br />

zentrale Leitwarte andocken.<br />

Gleichzeitig begibt man<br />

sich nicht in die Abhängigkeit<br />

eines Herstellers und hält<br />

sich die Optionen für künftige<br />

Ausbaustufen offen. Gerade<br />

im Bereich der Basisfunktionalität<br />

und bei dieser Flächengröße<br />

kommen die Vorteile<br />

von <strong>BACnet</strong> eindeutig zur Geltung.<br />

Wolfsburg Hospital treats<br />

around 28,000 in-patients<br />

annually. Since 2001, with<br />

the aim of offering patients a<br />

stay in a modern hospital and<br />

achieving better management<br />

of patient throughput, the existing<br />

hospital buildings have<br />

been successively modernised<br />

and extended with new building<br />

complexes. An important<br />

milestone in this refurbishment<br />

and expansion concept<br />

was the opening of the new<br />

Ward Block G in 2005, with<br />

its small, patient-friendly<br />

units. The subsequent conversion<br />

of Block C in 2007 and<br />

the linking of the two buildings<br />

were carried out not just<br />

for structural building benefits<br />

but also for improvements<br />

in building automation and<br />

equipment control.<br />

Technical equipment<br />

in ward block buildings<br />

In the wider context of hospital<br />

infrastructure, the system<br />

requirements of ward block<br />

buildings are comparatively<br />

less complex than most. With<br />

typical technical building services<br />

equipment such as ventilation<br />

plants on the roof, combined<br />

building services control<br />

rooms with ventilation plant,<br />

district heating feeds, heating<br />

distributors, hot water tanks,<br />

electrical power distribution<br />

equipment in the basement<br />

and small wall cupboards on<br />

each floor, to which local data<br />

points, for example fire safety<br />

flaps or volume flow regulators,<br />

are connected, these<br />

buildings have more in common<br />

with high quality administration<br />

offices. With 270<br />

beds on four floors and a gross<br />

Magistrale zur Anbindung an die Bestandsgebäude.<br />

Connection to existing building units.<br />

Der neue Haupteingang der Klinik.<br />

New main entrance of the hospital.<br />

floor area of 16,397 m², the<br />

project was of sufficient size<br />

and had an adequate number<br />

of systems requiring control<br />

that <strong>BACnet</strong> could be proposed<br />

as an economically attractive<br />

alternative.<br />

Manufacturer-neutral<br />

tender<br />

While the decision here in favour<br />

of <strong>BACnet</strong> for the new<br />

ward block was its first use in<br />

this hospital, the primary control<br />

system would continue to<br />

be based on JCI equipment.<br />

This solution for the project,<br />

arrived at by a committed client<br />

and operator, means that<br />

the old JCI building management<br />

control system could be<br />

upgraded to the latest version<br />

with the capability of communicating<br />

with <strong>BACnet</strong> and the<br />

new phase of building specified<br />

as manufacturer-neutral<br />

with <strong>BACnet</strong> automation stations.<br />

Before the contract was<br />

placed, system tests were carried<br />

out for safety reasons between<br />

the automation stations<br />

and the primary control unit,<br />

because <strong>BACnet</strong> was a relatively<br />

new standard at that<br />

time. On completion in 2005,<br />

“Ward Block G” with its Kieback<br />

& Peter systems was<br />

connected to the new <strong>BACnet</strong>capable<br />

JCI control room.<br />

Multivendor System<br />

In the meantime, <strong>BACnet</strong> automation<br />

stations have become<br />

standard and were successfully<br />

brought into use at<br />

the Wolfsburg Hospital in<br />

2007 in a second area in Block<br />

C (wards) with Sauter-Cumulus<br />

equipment, and in 20<strong>09</strong> in<br />

Anwendungen Solutions<br />

a third area in Blocks B and Y<br />

(OP/ITS) with JCI equipment<br />

and are now connected to<br />

the existing BMS. Ebert-Ingenieure<br />

has designed building<br />

management systems based<br />

on <strong>BACnet</strong> for many projects<br />

over the years, always with the<br />

aim of balancing costs with<br />

system requirements. <strong>BACnet</strong><br />

is admirably suitable for gradual<br />

expansion of separate and<br />

independent buildings in several<br />

sections – as we have seen<br />

here over almost a decade. It<br />

is always possible to specify<br />

the latest technology in a section<br />

of a building and have<br />

it dock with the existing central<br />

control room. At the same<br />

time, the client is not dependent<br />

on a single manufacturer<br />

and keeps the options open<br />

for future expansion projects.<br />

The advantages of <strong>BACnet</strong> are<br />

clearly apparent in projects of<br />

this size which require a basic<br />

level of functionality.<br />

Claus Roicke<br />

Planer Gebäudeautomation<br />

Ebert-Ingenieure<br />

c.roicke@eb-ing.com<br />

www.eb-ing.com<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

19


Energieeffiziente Begegnungsstätte<br />

im Südstadtforum Nürnberg<br />

Energy-efficient Community Center<br />

in the Nuremberg “Südstadtforum”<br />

Trotz der vielen unterschiedlichen Nutzergruppen wird der<br />

im Passivhaus-Standard errichtete Neubau des Nürnberger<br />

Südstadtforums den hohen Anforderungen an Energieeffizienz<br />

gerecht. Anteil daran hat die intelligente MSR-<br />

Anlage mit <strong>BACnet</strong> Gebäudeautomation von Delta Controls.<br />

Despite its many different user groups, the new<br />

construction of the “Nürnberger Südstadtforum” –<br />

built to the passive house standard – meets the high<br />

requirements of energy efficiency. The various systems<br />

were implemented with <strong>BACnet</strong> building automation by<br />

Delta Controls.<br />

Der Neubau des Südstadtforums<br />

Nürnberg (neuer Name:<br />

SüdPunkt) ist ein öffentliches<br />

und multifunktionales<br />

Stadtteilzentrum, das Bildung,<br />

Kultur und Freizeit<br />

sowie eine Stadtbibliothek<br />

in einem Gebäudekomplex<br />

vereint. Der viergeschossige<br />

Neubau mit einer Gesamtnutzfläche<br />

von 3.650 m 2<br />

wurde im Passivhaus-Standard<br />

errichtet; ein bestehender<br />

und denkmalgeschützter<br />

Altbau aus dem Jahre 1899<br />

wurde in das Projekt eingebunden<br />

und nach dem Standard<br />

der Energieeinsparverordnung<br />

saniert.<br />

Energieeffizienz im Fokus<br />

Hinsichtlich der unterschied-<br />

Der Neubau des Südstadtforums Nürnberg (links) neben<br />

dem denkmalgeschützten Altbau (rechts).<br />

The Nuremberg Sudstadtforum’s new building complex<br />

(left), adjacent to the existing listed heritage building.<br />

lichen Nutzergruppen sollte<br />

der Passivhaus-Standard mit<br />

einer möglichst einfachen<br />

Bedienbarkeit umgesetzt<br />

werden. Gleichzeitig bestanden<br />

hohe Anforderungen<br />

an die thermische, visuelle<br />

und akustische Behaglichkeit<br />

sowie die Energieeinsparung.<br />

Die Wärmeerzeugung<br />

basiert auf Fernwärme. Für<br />

einen niedrigen Heizwärmebedarf<br />

wurde die Passivhaus-Gebäudehülle<br />

optimal<br />

gedämmt bzw. verglast und<br />

luftdicht ausgeführt. Zur<br />

Sicherstellung des Luftwechsels<br />

sind zentrale Lüftungsanlagen<br />

mit hocheffizienter<br />

Wärmerückgewinnung eingesetzt.<br />

Für Spitzenlasten<br />

in den EDV-Schulungsräumen<br />

und im Veranstaltungssaal<br />

wird die Zuluft mittels<br />

einer über Erdsonden rückgekühlten,<br />

reversiblen<br />

Wärme pumpe auf ein<br />

zweites tieferes Temperaturniveau<br />

gesenkt. Durch die<br />

lange Nutzungszeit von täglich<br />

bis zu 14 Stunden spielt<br />

auch die Raumbeleuch-<br />

Anwendungen Solutions<br />

tung eine wichtige Rolle.<br />

Der Tages- und Kunstlichtanteil<br />

sind optimal aufeinander<br />

abgestimmt. Solare<br />

Gewinne werden über eine<br />

mittels LON verbundene<br />

Steuerung des außen liegenden<br />

Sonnenschutzes sinnvoll<br />

genutzt bzw. ausgeschlossen.<br />

Messwerterfassung<br />

und Steuerung<br />

In sechs Referenzräumen<br />

werden alle relevanten Daten<br />

wie Temperatur, Feuchte<br />

und Wärmezufuhr gemessen<br />

und erfasst. Die<br />

Messwer tinformationen<br />

können dann auf das Gesamtgebäude<br />

hochgerechnet<br />

werden. Die Steuerung und<br />

Regelung der Primäranlagen<br />

sowie die Erfassung der<br />

Messwerte erfolgt dezentral<br />

über offene Bussysteme wie<br />

<strong>BACnet</strong>/IP mit DDC Automationsstationen<br />

von Delta<br />

Controls und <strong>BACnet</strong> MS/<br />

TP für Applikationscontroller.<br />

Die Zähleraufschaltung<br />

erfolgt über M-Bus, der Son-<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

21


Another innovative design from the world’s <strong>BACnet</strong> leader.


nenschutz über LON (Warema)<br />

wird mit Gateways von<br />

Loytec auf den <strong>BACnet</strong> GLT-<br />

Rechner von Delta aufgeschaltet.<br />

Die Umsetzung und<br />

Programmierung der DDC<br />

Stationen sowie die Visualisierung<br />

der GLT realisierte<br />

die Münchner Firma SZ<br />

Regel- und Klimatechnik.<br />

Alle Informationsschwerpunkte<br />

(ISP’s) wurden mit<br />

einer Handbedienebene und<br />

einem <strong>BACnet</strong> Touchscreen<br />

Display für eine komfortable<br />

Vorortbedienung ausgestattet.<br />

Nach einer rund zweieinhalbjährigenBauphase<br />

wurde das Projekt Anfang<br />

20<strong>09</strong> abgeschlossen.<br />

Als multikulturelle und multifunktionaleBegegnungsstätte<br />

trägt das neue Südstadtforum<br />

maßgeblich zur<br />

Attraktivität der Nürnberger<br />

Südstadt bei.<br />

The Nuremberg Südstadtforum’s<br />

new construction (new<br />

name: SüdPunkt – in English:<br />

SouthPoint) is a public<br />

and multifunctional regional<br />

centre which combines education,<br />

culture and recreation,<br />

as well as a city library<br />

all within one building complex.<br />

The new construction<br />

with four floors has an entire<br />

effective area of 3,650 square<br />

meters and was built to the<br />

passive house standard. An<br />

existing listed heritage build-<br />

Das Foyer des Südstadtforums,<br />

Blick vom Haupteingang<br />

auf den Empfang<br />

(links) und das Selbstlernzentrum<br />

(Mitte).<br />

The Sudstadtforum foyer,<br />

as viewed from the main<br />

entrance, including the reception<br />

area (left) and selflearning<br />

centre (middle).<br />

Anwendungen Solutions<br />

Topografie der GLT mit Darstellung der Informationsschwerpunkte (ISPs), Leitebene vor<br />

Ort sowie Aufschaltung auf zentrale Warte der Stadt Nürnberg (roter Pfeil).<br />

The BMS topology showing the automation and management levels on-site,<br />

as well as the remote management level from Nuremberg city’s central monitoring system.<br />

ing dating back to 1899 was<br />

integrated into the project<br />

and refurbished to meet today’s<br />

energy efficiency standards.<br />

Focus on energy efficiency<br />

In light of the many different<br />

user groups, the passive<br />

house standard had to be<br />

implemented on the premise<br />

of simple operation. At the<br />

same time, demanding requirements<br />

were placed on<br />

thermal, visual and acoustic<br />

comfort, as well on energy<br />

efficiency. District heating<br />

provided the basis for<br />

the generation of heat. To<br />

reduce heating demand, the<br />

passive house building envelope<br />

was optimally insulated,<br />

well sealed, and equipped<br />

with appropriate window<br />

glazing. Central ventilation<br />

systems were equipped<br />

with high efficiency heat recovery<br />

units to ensure effective<br />

air changes. The supply<br />

air was conditioned using<br />

ground source-reversable<br />

heat pumps in order to handle<br />

the peak loads generated<br />

within the IT training rooms<br />

and the events hall. The long<br />

daily operation of up to 14<br />

hours placed an important<br />

emphasis on room lighting.<br />

The proportions of daylight<br />

and artificial light were per-<br />

fectly balanced. Solar gains<br />

were utilized for heating as<br />

required, by integrating the<br />

LON-based shade control<br />

system.<br />

Measurement and control<br />

Six reference rooms were utilized<br />

to measure and capture<br />

all relevant data such as temperature,<br />

humidity and supplied<br />

heat. This information<br />

was used to extrapolate the<br />

requirements of the entire<br />

building. The control and<br />

operation of the central plant<br />

systems, as well as the capture<br />

of all measurement data<br />

was decentralised via open<br />

bus systems such as <strong>BACnet</strong>/<br />

IP with DDC automation stations<br />

by Delta Controls and<br />

<strong>BACnet</strong> MS/TP for application<br />

controllers. The heat<br />

metering, implemented with<br />

M-Bus devices, and the solar<br />

protection via LON (Warema),<br />

were connected to the<br />

Delta Controls <strong>BACnet</strong> BMS<br />

workstation using gateways<br />

by Loytec. The implementation<br />

and programming of the<br />

DDC stations, as well as the<br />

graphic visualisation at the<br />

operator workstation level<br />

was handled by the firm<br />

SZ Regel- und Klimatechnik<br />

from Munich. All automation<br />

centres were equipped<br />

with local hand override ca-<br />

pability and with a <strong>BACnet</strong><br />

touchscreen display for extremely<br />

user friendly local<br />

operation.<br />

After a construction phase<br />

spanning two and a half<br />

years, the project was completed<br />

in the beginning of<br />

20<strong>09</strong>. As a multicultural and<br />

multifunctional community<br />

center, the new Südstadtforum<br />

further adds to the many<br />

attractions of Nuremberg<br />

city south.<br />

Dusko Lukanic-Simpson<br />

Managing Director<br />

Delta Controls Germany Ltd.<br />

sales@deltacontrols.de<br />

www.deltacontrols.de<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

23


Anwendungen Solutions<br />

Klinik Kirchheim-Nürtingen<br />

setzt auf <strong>BACnet</strong><br />

Kirchheim-Nürtingen Hospital<br />

Opts for <strong>BACnet</strong><br />

Der Neubau des Klinikum Kirchheim-Nürtingen setzt auf<br />

modernste Gebäudemanagement- und Gebäudeautomationstechnik<br />

auf Basis von <strong>BACnet</strong> mit GFR.<br />

The new development at Kirchheim-Nürtingen Hospital<br />

will feature modern building management and<br />

automation systems provided by <strong>BACnet</strong> and GFR.<br />

Im Rahmen einer Strukturreform<br />

im Landkreis Esslingen<br />

wurden die Krankenhäuser<br />

der Standorte<br />

Kirchheim und Nürtingen<br />

zusammengelegt und zentralisiert.<br />

In beiden existierendenKrankenhäusern<br />

waren Kapazitäten von<br />

rund 700 Betten für 22.000<br />

stationäre und 40.000 ambulante<br />

Patienten pro Jahr<br />

vorhanden. Durch die Zu-<br />

24<br />

sammenlegung der zwei<br />

Standorte zu einer größeren<br />

Klinik konnten verschiedene<br />

Vorteile wie eine<br />

bessere Verfügbarkeit von<br />

Experten, die Erhöhung der<br />

medizinischen Qualität sowie<br />

Kostensenkungen durch<br />

Nutzung von Synergieeffekten<br />

erreicht werden.<br />

Betrieb während des Baus<br />

Am Standort Nürtingen<br />

Übersicht über die Klinikanlage: Der Neubau grenzt direkt<br />

an das bestehende Krankenhaus.<br />

View on the hospitals. The new building is right beside the<br />

existing hospital building.<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

war es nötig, einen zusätzlichen<br />

Neubau neben dem<br />

vorhandenen Krankenhaus<br />

zu realisieren. Hierzu wurde<br />

ein operatives Zentrum<br />

mit moderner funktionsorientierter<br />

Architektur geplant.<br />

Das neue Klinikgebäude<br />

wurde als Stahlbetonbau<br />

in Spangenbauweise mit<br />

sieben Bauteilen errichtet.<br />

Beim Bau des Gebäudes lag<br />

ein besonderes Augenmerk<br />

auf dem reibungslosen Betrieb<br />

des angrenzenden<br />

Krankenhauses ohne Belastungen<br />

und Gefährdungen.<br />

Im Bereich des Gebäudemanagements<br />

und der Gebäudeautomation<br />

hat man sich<br />

für den Einsatz des <strong>BACnet</strong><br />

Standards entschieden. Die<br />

Gründe lagen vorrangig in<br />

den Möglichkeiten, eine offene<br />

Ausschreibung mit weit<br />

gefächertem Wettbewerb<br />

durchführen zu können und<br />

darüber hinaus diesen auch<br />

bei eventuell zukünftigen<br />

Bauabschnitten beizubehalten.<br />

Bei diesem offenen Verfahren<br />

konnte sich die GFR<br />

Gesellschaft für Regelungstechnik<br />

und Energieeinsparung<br />

mbH mit einer gut<br />

durchdachten technischen<br />

Lösung durchsetzen.<br />

Anspruchsvolle<br />

Gebäude automation<br />

Die technischen Herausforderungen<br />

waren hoch: die<br />

gesamte Gebäudeautomation<br />

wie auch das Gebäudemanagement<br />

sollten auf Basis<br />

von <strong>BACnet</strong> errichtet<br />

werden. Dazu kamen verschiedene<br />

Ergänzungen auf<br />

Basis weiterer BUS-Protokolle.<br />

Anbindungen über<br />

Profibus ermöglichen die<br />

Kommunikation mit Blockheizkraftwerken,Kältemaschinen,<br />

Kühltürmen und<br />

Wärmerückgewinnungsanlagen.<br />

Kessel- und Brennerfunktionen<br />

wie auch elektrische<br />

Wirkleistungszähler<br />

kommunizieren über Modbus,<br />

weitere Medienzähler<br />

über M-BUS. Ergänzt wurde<br />

die GA-Struktur um eine<br />

Anbindung auf Grundlage<br />

von EIB/KNX, welche Elektroinformationen<br />

dem Gesamtsystem<br />

zur Verfügung<br />

stellt.<br />

Grundlage der gesamten Gebäudeautomation<br />

ist der<br />

<strong>BACnet</strong> Building Controller<br />

(B-BC) ems4.CP03B-<br />

BAC von GFR. Optional<br />

zur Verfügung stehende<br />

Schnittstellenmodule integrieren<br />

die notwendigen an-


deren BUS-Systeme in die<br />

GA-Struktur und bilden damit<br />

die Grundlage einer offenen<br />

Systemarchitektur.<br />

Hier konnte wieder einmal<br />

gezeigt werden, dass gerade<br />

die Kombination aus <strong>BACnet</strong><br />

und weiteren gewerkespezifischen<br />

BUS-Protokollen das<br />

Optimum an Komfort sowie<br />

Errichter- und Betriebskostenminimierung<br />

darstellt.<br />

Gebäudemanagement<br />

Ausgangspunkt der offenen<br />

und komfortablen Bedienung<br />

wie Überwachung der Haustechnik<br />

ist die web basierte<br />

Liegenschaftsmanagementsoftware<br />

WEBVISION von<br />

GFR. Diese ist als <strong>BACnet</strong><br />

Operator Workstation (B-<br />

OWS) aufgebaut und erfüllt<br />

neben den gängigen GLT<br />

Funktionen auch Aufgaben<br />

wie die Anbindung an ein<br />

DAKS-Server System, dezentral<br />

verteiltes und betreiberabhängigesAlarmmanagement<br />

wie natürlich auch die<br />

Bedienung des gesamten Systems<br />

via Internet. Zentrale<br />

Server und dezentral verteilte<br />

Bedienplätze gehören ebenso<br />

zum Umfang wie portable<br />

Handbediengeräte zur Vor-<br />

Ort-Überwachung und Bedienung<br />

sämtlicher Anlagenfunktionen.<br />

In the course of a structural<br />

reform in the district of Esslingen,<br />

the hospitals at Kirchheim<br />

and Nürtingen were amalgamated<br />

and centralised. The<br />

two existing hospitals had a<br />

capacity of around 700 beds<br />

for some 22,000 inpatients<br />

and 40,000 outpatients per<br />

year. The amalgamation of<br />

the two sites to create a larger<br />

hospital yielded various advantages<br />

such as improved<br />

availability of experts, better<br />

medical quality, and cost reductions<br />

through the exploitation<br />

of synergy effects.<br />

Operation during<br />

building phase<br />

At the Nürtingen site it was<br />

necessary to erect an additional<br />

building alongside the<br />

existing hospital. A new operations<br />

centre with a modern<br />

service-oriented architecture<br />

was also planned. The<br />

new hospital building has<br />

Die Systemarchitektur der neuen Klinik Kirchheim-Nürtingen.<br />

The system architecture at the new Kirchheim-Nürtingen Hospital.<br />

a reinforced concrete frame<br />

and consists of seven sections.<br />

During the construction work<br />

special attention was directed<br />

to the smooth running of the<br />

existing hospital without disruption<br />

and danger.<br />

In the area of building management<br />

and automation the<br />

decision was taken to deploy<br />

the <strong>BACnet</strong> standard. The<br />

main reason for this was the<br />

opportunity to organise an<br />

open tender with broad-based<br />

competition, which could also<br />

be repeated in any future construction<br />

phases. In this open<br />

process, GFR Gesellschaft für<br />

Regelungstechnik und Energiesparung<br />

mbH won with a<br />

well thought out technical solution.<br />

Ambitious building<br />

automation<br />

The technical challenges were<br />

high: the entire building automation<br />

and management<br />

system was to be built on a<br />

<strong>BACnet</strong> network. On top of<br />

this there were various addons<br />

based on other bus protocols.<br />

Connections via profibus<br />

permit communications<br />

with cogeneration units, chillers,<br />

cooling towers and heat<br />

recovery systems. Boiler and<br />

burner functions and electric<br />

meters communicate via<br />

modbus and other media<br />

meters via M-BUS. The BA<br />

structure was augmented by<br />

an EIB/KNX connection that<br />

supplies electrical information<br />

to the entire system.<br />

The basis of the entire building<br />

automation system is an<br />

ems4.CP03B-BAC <strong>BACnet</strong><br />

Building Controller (B-BC)<br />

from GFR. Optional interface<br />

modules integrate other<br />

necessary bus systems in the<br />

BA structure and thus form<br />

the basis of an open system<br />

architecture. This demonstrated<br />

yet again that it is<br />

precisely the combination of<br />

<strong>BACnet</strong> and other trade-specific<br />

bus protocols that delivers<br />

maximum convenience<br />

and construction and operating<br />

cost savings.<br />

Building management<br />

The starting point for the<br />

open and convenient monitoring<br />

and control of all mechanical<br />

and electrical systems<br />

is the web-based property<br />

management software<br />

WEBVISION from GFR.<br />

This is set up as a <strong>BACnet</strong><br />

Operator Workstation<br />

Anwendungen Solutions<br />

(B-OWS) and in addition to<br />

carrying out the usual BMS<br />

functions it performs tasks<br />

such as connection to a<br />

DAKS server system, distributed<br />

and operator-independent<br />

alarm management and,<br />

of course, control of the entire<br />

system via the Internet.<br />

The package also includes<br />

central servers and local operator<br />

stations as well as<br />

portable hand-held control<br />

devices for on-site monitoring<br />

and control of all system<br />

functions.<br />

Olaf Durst<br />

GFR – Gesellschaft für<br />

Regelungstechnik und<br />

Energieeinsparung mbH<br />

olaf.durst@gfr.de<br />

www.gfr.de<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

25


Anwendungen Solutions<br />

Offenes Gebäudemanagement<br />

bei Heidelberger Druckmaschinen<br />

Open Building Management<br />

at Heidelberger Druckmaschinen<br />

Beim Druckmaschinenhersteller Heidelberg wurden die<br />

überwiegend auf Siemens-Systemtechnik basierenden<br />

Automations- und Leitsysteme in mehreren Stufen nach<br />

dem <strong>BACnet</strong>-Gebäudeautomationssystem Desigo migriert<br />

und zusammen mit einem weiteren Automationssystem<br />

mittels OPC-Server mit einem übergeordneten Störmanagementsystem<br />

verbunden.<br />

The printing press manufacturer Heidelberg has migrated<br />

its automation and control systems, which are primarily<br />

based on Siemens system technology, to the <strong>BACnet</strong><br />

building automation system Desigo in several steps and<br />

has connected this system with an upstream malfunction<br />

management system using another automation system via<br />

an OPC server.<br />

Bei der Heidelberger Druckmaschinen<br />

AG (HDM)<br />

machte man sich bereits im<br />

Jahr 2001 Gedanken, wie<br />

die vorhandenen Gebäudeleitsysteme<br />

bzw. Automa-<br />

26<br />

tionsstationen in den beiden<br />

Werken Heidelberg und<br />

Wiesloch-Walldorf in ein<br />

ganzheitliches, zukunftssicheres<br />

Konzept überführt<br />

werden können. Dazu wur-<br />

Konsequenter Investitionsschutz: Alter Visonik Rechner aus<br />

dem Jahr 1982 (links) und neuer Desigo-Server (rechts).<br />

Consistent investment protection: old Visonik computer<br />

from 1982 (left) and new Desigo server (right).<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

den folgende Nutzeranforderungen<br />

festgelegt:<br />

Aufbau eines eigenständigen<br />

Netzwerkes in<br />

Ethernet-Technologie<br />

Datenübertragung über<br />

<strong>BACnet</strong><br />

Verknüpfung der Gebäudeautomationssysteme<br />

mit einem Störmeldesystem<br />

in OPC-Technologie;<br />

Implementierung über das<br />

<strong>BACnet</strong>-Protokoll<br />

Nahtlose Übernahme der<br />

bestehenden GLT-Applikationen,<br />

wie Prozessreaktions-,<br />

Lastspitzen- und<br />

Zeitschaltprogramme sowie<br />

MSR-Technik in das<br />

Desigo System<br />

Option auf mindestens<br />

zwei Fabrikate auf der<br />

Management- und Automationsebene<br />

schrittweise Umstellung/<br />

Migration der vorhandenenGLT-/DDC-Anlagen<br />

bei laufendem Betrieb<br />

Verbesserung der Anlagenverfügbarkeit<br />

Notbedienebene mit lokalem<br />

Vorrang<br />

Straffung der Systemarchitektur<br />

Weiterführung der Gebäudeautomationssysteme<br />

an<br />

den beiden Standorten<br />

Heidelberg und Wiesloch-<br />

Walldorf als eigenständige<br />

Systeme; Einbindung mittels<br />

OPC-Schnittstelle an<br />

ein Störmeldesystem in der<br />

rund um die Uhr besetzten<br />

Noteinsatzzentrale.<br />

Frühe Entscheidung<br />

für <strong>BACnet</strong><br />

Obwohl zu Beginn der Migrationsplanung<br />

noch nicht<br />

sicher war, ob sich <strong>BACnet</strong> in<br />

Deutschland auf breiter Basis<br />

durchsetzt und die MSR-/<br />

GA-Industrie es nicht nur bei<br />

Gateway-Lösungen belässt,<br />

entschied sich HDM schon<br />

frühzeitig für das <strong>BACnet</strong>-<br />

Protokoll. Ausschlaggebend<br />

war unter anderem, dass


Verwaltungsgebäude der Heidelberger Druckmaschinen AG in Wiesloch-Walldorf.<br />

Administration building of the Heidelberger Druckmaschinen AG in Wiesloch-Walldorf.<br />

Siemens als einer der ersten<br />

Hersteller im Jahr 2004 mit<br />

Desigo ein natives <strong>BACnet</strong>-<br />

Gebäudeautomationssystem<br />

vorstellte.<br />

Nach den positiven Erfahrungen<br />

mit den bereits Anfang<br />

der 80er Jahre installierten<br />

Visonik-Systemen an<br />

den HDM-Standorten Heidelberg<br />

und Wiesloch-Walldorf<br />

war es naheliegend, das<br />

auf Rückwärtskompatibilität<br />

optimierte Desigo System<br />

als Basis für die integrierte<br />

Lösung mit <strong>BACnet</strong><br />

als Übertragungsprotokoll<br />

in die engere Wahl zu ziehen.<br />

Mit dem damit möglichen<br />

sanften Umstieg konnten<br />

die Investitionsausgaben gezielt<br />

geplant und die Umsetzung<br />

im laufenden Betrieb<br />

quasi verlust- und unterbrechungsfrei<br />

realisiert werden.<br />

Damit ist eine langfristige<br />

Lebenszyklusplanung gewährleistet.<br />

Einfache Bedieung<br />

Mit der neuen „Desigo-<br />

Welt“ vereinfacht sich die<br />

Betriebsführung der gebäudetechnischen<br />

Anlagen in<br />

der Industrie-Liegenschaft<br />

ganz wesentlich. Dazu trägt<br />

insbesondere die einfache<br />

Bedienung auf das beliebige<br />

Anlegen von Trendkurven in<br />

Desigo und über die ADP-<br />

Software (Advanced Data<br />

Processing) bei. Weitere<br />

Neuerungen sind Optimierungsprogramme<br />

zur Regelung<br />

der freien Kühlung in<br />

den Produktionshallen sowie<br />

Optimum-Start-Stop-<br />

Programme zur Einschalt-<br />

und Restwärmeoptimierung<br />

von Heizungs- und RLT-Anlagen.<br />

At Heidelberger Druckmaschinen<br />

AG (HDM) planning<br />

was started in 2001 to<br />

determine the best solution<br />

for migrating the existing<br />

building control systems and<br />

automation stations in the<br />

two plants in Heidelberg and<br />

Wiesloch-Walldorf to form<br />

an integrated future-oriented<br />

concept. The following user<br />

requirements were determined:<br />

Development of a standalone<br />

network using Ethernet<br />

technology<br />

Data transmission via<br />

<strong>BACnet</strong><br />

Connection of the building<br />

automation systems to<br />

a malfunction notification<br />

system using OPC technology;<br />

implementation<br />

using the <strong>BACnet</strong> protocol<br />

Smooth transfer of existing<br />

GLT applications,<br />

such as process response,<br />

peak demand and time<br />

switching programs as<br />

well as MSR technology,<br />

to the Desigo system<br />

Option of at least two<br />

products at the management<br />

and automation levels<br />

Incremental conversion/<br />

migration of the existing<br />

GLT/DDC systems during<br />

operation<br />

Improving system availability<br />

Emergency operation level<br />

with local priority<br />

Streamlining the system<br />

architecture<br />

Continued management of<br />

the building automation<br />

systems at the two locations<br />

in Heidelberg and<br />

Wiesloch-Walldorf as independent<br />

systems; integration<br />

via an OPC interface<br />

to a malfunction<br />

notification system in the<br />

emergency center, which is<br />

staffed around the clock.<br />

Early decision for <strong>BACnet</strong><br />

Even though at the beginning<br />

of migration planning<br />

it was not certain that <strong>BACnet</strong><br />

would gain widespread<br />

popularity in Germany and<br />

whether the MSR/GA = I&C/<br />

BA industry would continue<br />

to use it only for gateway solutions,<br />

HDM decided in favor<br />

of the <strong>BACnet</strong> protocol<br />

early on. One of the decisive<br />

factors was that Siemens was<br />

one of the first manu facturers<br />

to present a native <strong>BACnet</strong><br />

building automation system<br />

with Desigo in 2004.<br />

Anwendungen Solutions<br />

Based on the positive experience<br />

gained with the Visonik<br />

systems, which were<br />

installed at the HDM sites<br />

in Heidelberg and Wiesloch-<br />

Walldorf at the beginning of<br />

the 1980s, it was a matter<br />

of course to take the backward<br />

compatible Desigo system<br />

into consideration as the<br />

foundation for the integrated<br />

solution with <strong>BACnet</strong> as<br />

the transmission protocol.<br />

The smooth transition that<br />

this provided made it possible<br />

to plan investments in<br />

a targeted manner and perform<br />

implementation during<br />

operation without notable<br />

losses or interruptions. This<br />

ensures long-term lifecycle<br />

planning.<br />

Easy operation<br />

The new “Desigo world”<br />

very significantly simplifies<br />

system management of the<br />

building technology systems<br />

in the industrial properties.<br />

Simple operation with creation<br />

of trend curves in Desigo<br />

and the ADP software (Advanced<br />

Data Processing), are<br />

primary components here.<br />

Further improvements include<br />

optimization programs<br />

for regulating free cooling in<br />

the production facilities as<br />

well as optimum start/stop<br />

programs for activating and<br />

using the residual heat of the<br />

HVAC systems.<br />

Michael Leder<br />

Siemens Building<br />

Technologies GmbH & Co.<br />

oHG, Region Rhein-Main<br />

michael.leder@<br />

siemens.com<br />

www.siemens.de/<br />

buildingtechnologies<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

27


Anwendungen Solutions<br />

<strong>BACnet</strong> für mehr Energieeffizienz<br />

und Umweltschutz<br />

<strong>BACnet</strong> for More Energy Efficiency<br />

and Pollution Control<br />

Integrierte Gebäudeautomation sorgt im neuen Schulungszentrum<br />

und der neuen Energiezentrale der Viessmann-<br />

Unternehmensgruppe für Energieeffizienz. Innovative Heiztechnik,<br />

Lüftung und Klimasysteme kommunizieren über<br />

<strong>BACnet</strong>. Auch Fremdsysteme, die nicht <strong>BACnet</strong> sprechen,<br />

sind integriert.<br />

Integrated building automation provides energy<br />

efficiency in the new training center and the new energy<br />

headquarters of the Viessmann Group. Innovative heating,<br />

ventilation and air conditioning systems communicate<br />

via <strong>BACnet</strong>, even third-party systems that do not speak<br />

<strong>BACnet</strong> are integrated.<br />

Die Viessmann-Unternehmensgruppe<br />

ist nicht nur<br />

Hersteller von innovativen<br />

Heiztechnik-Systemen. Sie bietet<br />

ihren Kunden auch umfassendeDienstleistungsangebote.<br />

Eine wesentliche<br />

Säule ist die Viessmann-Akademie.<br />

Die Seminare und Schulungen<br />

der Akademie werden<br />

jährlich von vielen Fachleuten<br />

und Mitarbeitern besucht.<br />

In den Jahren 2006 bis 2007<br />

wurden am Hauptsitz des<br />

28<br />

Unternehmens in Allendorf/<br />

Eder ein neues Akademiegebäude<br />

und eine neue Energiezentrale<br />

errichtet. Die<br />

von der RSE Planungsgesellschaft<br />

aus Kassel geplanten<br />

Gebäude ergänzen das<br />

vorhandene Ensemble mit<br />

Verwaltungsbau und Informationszentrum.<br />

MSR, HLK,<br />

Versorgungsmedien und Gebäudetechnik<br />

wurden von<br />

der SCHNEPF Planungsgruppe<br />

Energietechnik aus Nagold<br />

geplant und umgesetzt.<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Im Akademiegebäude befinden<br />

sich Seminar- und Schulungsräume<br />

mit modernster<br />

Medientechnik und Büros,<br />

außerdem ein weitläufiges<br />

Foyer mit Empfangstheke,<br />

Restaurant und einem Ausstellungsbereich.<br />

Die Energiezentrale<br />

versorgt das gesamte<br />

Werk mit Energie. Gleichzeitig<br />

dient die hier installierte<br />

Technik Demon strations-<br />

und Schulungszwecken. Die<br />

sieben markanten Edelstahl-<br />

Schornsteine sind das archi-<br />

Die sieben Edelstahl-Schornsteine sind architektonisches Wahrzeichen der Viessmann-Werke.<br />

The seven stainless steel chimneys are an architectural landmark of the Viessmann Factory.<br />

tektonische Wahrzeichen der<br />

Viessmann-Werke.<br />

Technologie für<br />

Energieeffizienz<br />

Energieeffizienz und Umweltschutz<br />

standen bei Planung<br />

und Bau im Vordergrund.<br />

Dank Optimierung der Außenhülle<br />

und Nutzung von<br />

Abwärme hat der Neubau<br />

nur einen Primärenergiebedarf<br />

von 45,28 kWh/qma sowie<br />

einen Heizwärmebedarf<br />

von 36,22 kWh/qma. Mo-


In der Energiezentrale wird moderne, umweltfreundliche<br />

Kesseltechnik demonstriert.<br />

The Energy Center will be demonstrating modern,<br />

environmentally friendly boiler technology.<br />

derne Kesseltechnologie trägt<br />

zusätzlich zur Energieeinsparung<br />

bei. In der Energiezentrale<br />

sind neun verschiedene<br />

Wärmeerzeuger in Kaskadierung<br />

installiert. Vier nutzen<br />

die fossilen Brennstoffe Gas<br />

und Öl, fünf arbeiten mit Biomasse<br />

wie Pellets, Biogas<br />

und Hackschnitzel. Drei davon<br />

sind Anlagen mit Wärme-Kraft-Kopplung,<br />

die<br />

Wärme und Strom liefern.<br />

Zur Unterstützung von Heizung<br />

und Kühlung sind auf<br />

den Dächern der Energiezentrale<br />

und des Akademiegebäudes<br />

thermische Solaranlagen<br />

installiert. Komplettiert<br />

wird das Energiekonzept<br />

durch Photovoltaikanlagen,<br />

Wärmepumpen und Pufferspeicher.<br />

Für die Kühlung<br />

sorgt eine Absorptionskältemaschine,<br />

die mit der Solaranlage<br />

gekoppelt ist. Im<br />

Kreislauf zwischen Kältema-<br />

schinen,Hackschnitzelkesseln und Solaranlage steht eine<br />

Sorptionslüftungsanlage<br />

mit Wärmerückgewinnung.<br />

Sie kühlt im Sommer und<br />

temperiert die Luft im Winter.<br />

Komplexe Gebäudeautomation<br />

mit <strong>BACnet</strong><br />

Die komplexe Haus- und<br />

Anlagentechnik stellt allerhöchste<br />

Anforderungen an<br />

die von Kieback&Peter installierte<br />

und betreute Gebäudeautomation.<br />

Die Anlagen der Energiezentrale<br />

und des Schulungszentrums<br />

mit der Kühl- und<br />

Lüftungstechnik sind über<br />

neun Automationsstationen<br />

DDC3000 und DDC4000<br />

vernetzt. Diese kommunizieren<br />

untereinander und mit<br />

der Gebäudeleittechnik über<br />

<strong>BACnet</strong>. Fremdsysteme, die<br />

nicht <strong>BACnet</strong> sprechen, sind<br />

über Protokolle wie TCP/IP<br />

oder Profibus integriert.<br />

In der Gebäudeleittechnik<br />

Neutrino-GLT stehen alle<br />

Daten aus den 80.000 Datenpunkten<br />

des Werkes zur Verfügung.<br />

Die Neutrino-GLT<br />

kann auch auf Daten anderer<br />

Viessmann-Werke und Verkaufsniederlassungenweltweit<br />

zugreifen.<br />

The Viessmann group of<br />

companies is not just a manufacturer<br />

of innovative heating<br />

technology systems. They<br />

also offer their customers an<br />

extensive range of services.<br />

A key pillar is the Viessmann<br />

Academy. The academy’s<br />

seminars and training courses<br />

are attended by many professionals<br />

and employees yearly.<br />

In the years from 2006 to<br />

2007 a new academy building<br />

and power station was<br />

constructed at the company<br />

headquarters in Allendorf<br />

on the Eder. The buildings,<br />

planned by the RSE planning<br />

company from Kessel, complement<br />

the existing ensemble<br />

with an administrative building<br />

and information center.<br />

Measuring and control systems,<br />

HVAC, supply media<br />

as well as building technology<br />

were planned and implemented<br />

by the SCHNEPF<br />

Energy Planning Group from<br />

Nagold, Germany.<br />

Seminar and training rooms<br />

with the most modern media<br />

technology and offices are located<br />

in the academy building<br />

in addition to a large<br />

foyer with reception desk,<br />

restaurant and an exhibition<br />

area. The power station provides<br />

the entire plant with<br />

energy. At the same time the<br />

techno logy installed here is<br />

used for demonstration and<br />

training purposes. The seven<br />

distinctive stainless steel<br />

chimneys are the architectural<br />

hallmark for the Viessmann<br />

sites.<br />

Technology<br />

for energy efficiency<br />

Energy efficiency and environmental<br />

protection were<br />

in the foreground of the<br />

planning and construction.<br />

Thanks to optimization of<br />

the outer shell and use of<br />

waste heat, the new building<br />

has a primary energy demand<br />

of only 45.28 kWh per<br />

year per square meter and<br />

a heating demand of 36.22<br />

kWh per year per square meter.<br />

Modern boiler technology<br />

also contributes to energy<br />

savings. Nine different heat<br />

generators are installed in<br />

the power station in cascade.<br />

Four use oil and gas fossil<br />

fuels while five operate with<br />

biomass fuels like pellets, biogas<br />

and wood chips. Three<br />

of them are combined heat<br />

and power plants which deliver<br />

heat and electricity.<br />

Solar heating equipment is<br />

installed on the roofs of the<br />

Anwendungen Solutions<br />

power plant and the academy<br />

building to support the<br />

heating and cooling systems.<br />

The energy concept is complemented<br />

by photovoltaic<br />

equipment, heat pumps and<br />

buffer tanks. An absorption<br />

chiller coupled to the solar<br />

equipment takes care of the<br />

cooling. In the cycle between<br />

the chillers, wood chip boilers<br />

and solar equipment is a<br />

sorption ventilation system<br />

with heat recovery. It cools<br />

in the summer and warms<br />

the air in the winter.<br />

Complex building<br />

automation with <strong>BACnet</strong><br />

The complex home and facility<br />

automation makes<br />

all the highest demands on<br />

the building automation installed<br />

and maintained by<br />

Kieback&Peter.<br />

The cooling and ventilation<br />

systems for the power plant<br />

and the training center are<br />

networked by nine DDC3000<br />

and DDC4000 automation<br />

stations. These communicate<br />

with each other via <strong>BACnet</strong>.<br />

External systems that do not<br />

speak <strong>BACnet</strong> are integrated<br />

via protocols such as TCP/IP,<br />

modbus or profibus.<br />

All data from the facility’s<br />

80,000 data points are available<br />

in the Neutrino-GLT<br />

building management system.<br />

The Neutrino-GLT can<br />

also access the data from<br />

other Viessmann plants and<br />

sales branches worldwide.<br />

Rüdiger Gans<br />

Kieback&Peter<br />

GmbH & Co. KG<br />

Technisches Büro Kassel<br />

www.kieback-peter.de<br />

gans@kieback-peter.de<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

29


Anwendungen Solutions<br />

SNMP-Integration in <strong>BACnet</strong><br />

beim Landschaftsverband Rheinland<br />

SNMP Integration into <strong>BACnet</strong><br />

at the Rhineland Regional Council<br />

Seit der Erweiterung des EDV-Systems im Rechenzentrum<br />

des Landschaftsverbands Rheinland in Köln integriert ein<br />

Gateway der INH-GmbH wichtige Daten wie Wasser- und<br />

Lufttemperaturen sowie Betriebs- und Störzustände in das<br />

<strong>BACnet</strong>-System.<br />

Since the expansion of the IT system at the data centre of<br />

The Rhineland Regional Council in Cologne, a gateway<br />

by INH-GmbH is integrating important data such as water<br />

temperatures, air temperatures, operational statuses and<br />

error messages into the <strong>BACnet</strong> system.<br />

Der Landschaftsverband Rheinland<br />

(LVR) arbeitet als Kommunalverband<br />

mit rund<br />

15.000 Beschäftigten für die<br />

etwa 9,6 Millionen Menschen<br />

im Rheinland. Er erfüllt<br />

Aufgaben in der Behinderten-<br />

und Jugendhilfe, in<br />

der Psychiatrie und der Kul-<br />

30<br />

<strong>BACnet</strong>-Gateway SMART<br />

tur. Der Wirkungskreis des<br />

LVR-Fachbereichs Gebäude-<br />

und Liegenschaftsmanagement<br />

(GLM) umfasst das gesamte<br />

Einzugsgebiet des LVR<br />

und verantwortet alle Maßnahmen<br />

im Lebenszyklus der<br />

Immobilien. Die vom LVR betriebene<br />

zentrale Gebäudeleittechnik<br />

ermöglicht die herstellerneutrale<br />

Aufschaltung<br />

vorhandener und neu errichteter<br />

Mess-, Steuer- und Regelanlagen<br />

über Standardschnittstellen.<br />

Erweiterung<br />

des EDV-Systems<br />

Im Zuge einer Erweiterung<br />

des EDV-Systems in dem<br />

LVR-Rechenzentrum in Köln<br />

wurde 20<strong>09</strong> eine weitere<br />

<strong>BACnet</strong>-Integration des neu<br />

installierten RIMATRIX5-Systems<br />

von der Rittal GmbH &<br />

Co. KG durchgeführt. Das RI-<br />

MATRIX5-System von Rittal<br />

besteht aus 12 EDV-Schränken<br />

zur Aufnahme neuer Serverracks<br />

für das EDV-System.<br />

Die Schränke sind zur<br />

Regelung der serverseitigen<br />

Wärmelasten mit dem Liquid<br />

Cooling Package (LCP<br />

Plus) ausgerüstet. Wasser-<br />

Luft-Wärmetauschersysteme<br />

sorgen hierbei für geregelte<br />

Schaltschrank-Temperaturkonditionen.<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Alle Schränke sind mit einem<br />

Regel- und Überwachungssystem<br />

von Rittal ausgerüstet.<br />

Das Computer Multi Control<br />

Top-Concept (CMC-TC)<br />

von Rittal bietet ein komplettes<br />

Security-Management-<br />

Konzept welches jeweils die<br />

Luft-Wasser-Regelung und<br />

Überwachung mit örtlicher<br />

Display-Anzeige und Bedienung<br />

pro Schrank realisiert.<br />

Dieses Überwachungssysteme<br />

kommunizieren mit dem in<br />

der IT/EDV-Welt weit verbreiteten<br />

SNMP-Protokoll<br />

(Simple Network Management<br />

Protokoll). Hiermit werden<br />

im örtlichen Netzwerk<br />

(TCP/IP) wichtige Schrankfeldbetriebsdaten<br />

wie Wasser-<br />

und Lufttemperaturen sowie<br />

Betriebs- und Störzustände<br />

übertragen.<br />

Smart Gateway<br />

Ein SNMP/<strong>BACnet</strong>-Gateway<br />

der INH-GmbH/HHO_Automation<br />

integriert diese Daten<br />

in das <strong>BACnet</strong>-System.<br />

Die Felddaten werden über<br />

SNMP-Protokoll mittels standardisierter<br />

Datenstrukturen<br />

MIB’s (Management Information<br />

Base) zyklisch ausgelesen.<br />

Im Gateway werden<br />

diese Daten auf <strong>BACnet</strong>-Objekte<br />

bzw. deren Properties<br />

abgebildet und im <strong>BACnet</strong>-<br />

Netzwerk (TCP/IP) zur Verfügung<br />

gestellt. Die Gateway-<br />

Konfiguration erfolgt durch<br />

standardisierte EDE-Files<br />

über einen integrierten Konfig-Webserver<br />

und/oder mit<br />

<strong>BACnet</strong> File-Mechanismen<br />

und -diensten.<br />

Das Gateway verfügt standardmäßig<br />

über weitere Feldbus-Schnittstellen,<br />

wie z.B.<br />

MODBUS UDP/TCP/RTU,<br />

welche im EDE-File abgebildet<br />

werden und steht in verschiedenen<br />

Größen (Anzahl<br />

<strong>BACnet</strong>-Objekte) für Integrationen<br />

verschiedener Protokolle<br />

nach <strong>BACnet</strong> zur<br />

Verfügung. Der zusätzlich<br />

integrierte Lua-Interpreter<br />

ermöglicht dem Benutzer<br />

direkte Lese- und Schreibzugriffe<br />

auf alle Devices im<br />

<strong>BACnet</strong>-Netzwerk. Durch<br />

die Lua-Syntaxerweiterungen<br />

sind Abhängigkeiten und Verknüpfungen<br />

unterschiedlicher<br />

<strong>BACnet</strong>-Objekte und deren<br />

Properties frei programmierbar.<br />

Das Gateway stellt zusätzlich<br />

einen Field-Webserver zur direkten<br />

Feldbeobachtung zur<br />

Verfügung. Hier erfolgt eine<br />

übersichtliche, tabellarische<br />

Darstellung aller integrierten<br />

Daten zur Inbetrieb nahme


Datentabelle der integrierten Betriebsdaten pro Schrank (exemplarisch):<br />

Table with the integrated operating data for each cabinet (example):<br />

LCPxx: Kommunikationsstatus SNMP LCPxx: Alarm Water_Out_Temperature<br />

LCPxx: Server_In_Temperature LCPxx: Alarm Durchfluss Kühlmedium<br />

LCPxx: Server_Out_Temperature LCPxx: Alarm Lüfterüberwachung<br />

LCPxx: Water_In_Temperature LCPxx: Alarm Lufttemperatursensor Hardware<br />

LCPxx: Water_Out_Temperature LCPxx: Alarm Wassertemperatursensor Hardware<br />

LCPxx: Waterflow LCPxx: Systemwarnung Durchflussmesser o. Regelventil<br />

LCPxx: Leakage LCPxx: Hardwaremäßiger Modulfehler<br />

LCPxx: Setpoint Warning LCPxx: Rauchmelder<br />

LCPxx: Setpoint High LCPxx: Leckage Doppelboden<br />

LCPxx: Alarm Water_In_Temperature<br />

und Diagnose. Mit dieser kostengünstigen<br />

Lösung erhält<br />

das Amt für Gebäude und<br />

Liegenschaften als Betreiber<br />

der Anlagen alle notwendigen<br />

Informationen über die<br />

Betriebszustände der gesamten<br />

Serverstation zur Betriebsüberwachung<br />

und Wartung.<br />

The Rhineland Regional<br />

Council (LVR) is a municipal<br />

organization with around<br />

15,000 employees which provides<br />

services for the roughly<br />

9.6 million people living in the<br />

Rhineland region. The LVR‘s<br />

Buildings and Property Man-<br />

RIMATRIX5 Serverschrank mit LCP Plus<br />

RIMATRIX5 server cabinet with LCP Plus<br />

agement (GLM) division covers<br />

the entire catchment area<br />

of the LVR and is responsible<br />

for all measures in the property<br />

lifecycle. The central building<br />

services management system<br />

operated by the LVR enablesmanufacturer-independent<br />

connection of existing and<br />

new measurement, control<br />

and instrumentation systems<br />

via standard interfaces.<br />

Expansion of the IT system<br />

As part of an expansion of<br />

the IT system at the LVR data<br />

centre in Cologne, further<br />

<strong>BACnet</strong> integration of the<br />

newly installed RIMATRIX5<br />

system from Rittal GmbH<br />

& Co. KG was carried out<br />

in 20<strong>09</strong>. The RIMATRIX5<br />

system from Rittal consists<br />

of 12 IT cabinets to accommodate<br />

new server racks for<br />

the IT system. The cabinets<br />

are equipped with a Liquid<br />

Cooling Package (LCP Plus)<br />

to control the heat load from<br />

the server. Water/air heat exchanger<br />

systems guarantee<br />

consistent control cabinet<br />

temperatures.<br />

All cabinets are fitted with a<br />

control and monitoring system<br />

from Rittal. The Computer<br />

Multi-Control Top Concept<br />

(CMC-TC) from Rittal<br />

offers a complete security<br />

management system which<br />

controls and monitors the air<br />

and water flows, with a local<br />

display and controls for each<br />

cabinet.<br />

These monitoring systems<br />

communicate using the<br />

SNMP protocol (Simple Network<br />

Management Protocol),<br />

which is well established in<br />

the IT and computing sector,<br />

in order to transfer important<br />

control cabinet operating data<br />

such as water temperatures,<br />

air temperatures, operational<br />

statuses and error messages<br />

across the local area network<br />

(TCP/IP).<br />

Smart gateway<br />

An SNMP/<strong>BACnet</strong> gateway<br />

from INH-GmbH/HHO_Automation<br />

integrates this data<br />

into the <strong>BACnet</strong> system. The<br />

field data is read out periodically<br />

using the SNMP protocol<br />

and standardised MIB<br />

(Management Information<br />

Anwendungen Solutions<br />

Base) data structures. In the<br />

gateway, this data is mapped<br />

to <strong>BACnet</strong> objects and their<br />

properties. and made available<br />

in the BAC network<br />

(TCP/IP). The gateway configuration<br />

is performed using<br />

standardised EDE files via an<br />

integrated configuration web<br />

server with or without <strong>BACnet</strong><br />

file mechanisms and services.<br />

The gateway has additional<br />

field bus interfaces, such as<br />

MODBUS UDP/TCP/RTU,<br />

which are mapped in the EDE<br />

file, and is available in various<br />

configurations (in terms of the<br />

number of <strong>BACnet</strong> objects),<br />

for integration of different<br />

protocols based on <strong>BACnet</strong>.<br />

The Lua interpreter, also integrated<br />

into the gateway,<br />

gives the user direct read and<br />

write access to all devices in<br />

the <strong>BACnet</strong> network. The Lua<br />

syntax extensions make dependencies<br />

and relationships<br />

between different <strong>BACnet</strong> objects<br />

and their properties freely<br />

programmable.<br />

The gateway also provides a<br />

field web server for direct field<br />

monitoring, providing a clearly<br />

laid-out tabular display of<br />

all integrated data for commissioning<br />

and diagnostics<br />

purposes. This economical solution<br />

provides the Buildings<br />

and Property Management<br />

department, as the operator<br />

of the system, all the information<br />

it needs on operating statuses<br />

for the entire server station<br />

for monitoring and maintenance<br />

purposes.<br />

Ingenieurgesellschaft<br />

N. Hartleb mbH<br />

Norbert Hartleb<br />

nhartleb@inh-hho.de<br />

www.hho-automation.de<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

31


TAC is now<br />

Schneider Electric<br />

Same people<br />

Same products<br />

Same priorities<br />

So what’s different?<br />

The name and<br />

new possibilities<br />

As the global specialist in energy management,<br />

Schneider Electric can transform the way you manage,<br />

automate, power and secure buildings. With our<br />

integrated solutions, saving energy in your building<br />

is not just a green policy. It’s a GROWTH policy.<br />

For more information, visit<br />

www.schneider-electric.com/buildings<br />

Make the most of your energy


Bessere Qualität von <strong>BACnet</strong> Projekten<br />

Higher Quality of <strong>BACnet</strong> Projects<br />

Uwe Haeseler 1<br />

Arien Peterse 2<br />

Einleitung<br />

Oftmals sind Betreiber von <strong>BACnet</strong><br />

basierten Gebäudeautomationssystemen<br />

unzufrieden, da ihre Erwartungen<br />

an das System nur unvollständig<br />

erfüllt wurden. Das<br />

kann folgende Ursachen haben:<br />

Die Planung fordert zwar viele<br />

Eigenschaften von <strong>BACnet</strong><br />

Geräten mit einer endlosen Liste<br />

von Properties und BIBBs, nicht<br />

jedoch was als Aufgabe der Gebäudeautomation<br />

realisiert werden<br />

soll (Leistungen).<br />

Die Planung fordert pauschal<br />

„ein Stück <strong>BACnet</strong>“<br />

Ein Auftragnehmer (AN) führt<br />

nur aus, wozu er glaubt, vom<br />

Auftraggeber (AG) beauftragt<br />

zu sein, ohne das gesamte System<br />

aus AS und B-OWS zu<br />

berücksichtigen.<br />

Bei <strong>BACnet</strong>-Systemen ist eine<br />

Dezentralisierung von Aufgaben<br />

(z.B. Alarmgenerierung, Zeitpläne,<br />

Trends) üblich. In Ausschreibungen<br />

erfolgt die Trennung<br />

von Aufgaben der<br />

Gebäudeautomation in der Automationsstation<br />

unzureichend<br />

von den in der B-OWS angesiedelten<br />

Aufgaben.<br />

Aus praktischer Erfahrung sind<br />

nachfolgende Texte entstanden,<br />

die den <strong>BACnet</strong> Teil einer Ausschreibung<br />

darstellen können und<br />

somit die Qualität von <strong>BACnet</strong><br />

Projekten erhöhen.<br />

Die Diskussion und Erweiterung<br />

dieser Texte ist von den Autoren<br />

ausdrücklich erwünscht. Das jeweils<br />

aktuelle Dokument wird auf<br />

Anfrage als Worddokument versandt.<br />

Vorsicht bei der Modifizierung<br />

der Texte, die Erfahrung hat<br />

gezeigt, dass leichte Änderungen<br />

der Formulierung zur Änderung<br />

des Inhaltes in das Gegenteil geführt<br />

haben!<br />

1. <strong>BACnet</strong> – Allgemeines<br />

1.1. Grundlagen<br />

1.1.1 Allgemeines<br />

Der <strong>BACnet</strong> Standard 2004 ist<br />

verbindliche Grundlage für neue<br />

Installationen.<br />

Als Betriebssystem für Datenserver,<br />

Bedienplätze usw. sind<br />

windowsbasierte Betriebssysteme<br />

vorzusehen wie WindowsXP,<br />

Windows Vista, Windows Server<br />

2003 oder Windows Server 2008.<br />

1.1.2 Interoperabilität<br />

Die PICS für sämtliche Geräte,<br />

welche vom AN eingesetzt werden,<br />

müssen mit dem Angebot vorab<br />

geliefert werden. In den PICS ist<br />

aufzuführen, welche Objekteigenschaften<br />

beschreibbar sind. Sämtliche<br />

Einschränkungen bezüglich<br />

der Konfigu ration müssen aufgeführt<br />

sein.<br />

Die Interoperabilität zwischen<br />

B-OWS und AS bezüglich der aufgeführten<br />

Forderungen hinsichtlich<br />

Eigenschaften und Engineering<br />

sind vor Auftragsvergabe in<br />

einer Testinstallation nachzuweisen<br />

oder mit einem vergleichbaren<br />

Interoperabilitätstest zu belegen.<br />

1.1.3 Adressierung/Netzwerk<br />

Die Planung der Adressen er-<br />

1 Dr. Uwe Haeseler ist Leiter Gebäudeautomation der Axima GmbH (NL<br />

Berlin) und Mitglied der Arbeitsgruppe Technik der BIG-EU, uwe.<br />

haeseler@axima.de.<br />

Dr. Uwe Haeseler is Director of Building Automation of Axima GmbH and<br />

member of the working group technique of the BIG-EU, uwe.haeseler@<br />

axima.de.<br />

2 Arien Peterse, Regel Partners B.V., ist Mitglied der Arbeitsgruppe Technik der<br />

BIG-EU. a.peterse@regelpartners.nl.<br />

Arien Peterse, Regel Partners B.V., is member of the working group<br />

technique of the BIG-EU, a.peterse@regelpartners.nl.<br />

folgt vom AN B-OWS in Abstimmung<br />

mit dem AG mittels B-PAT,<br />

siehe <strong>BACnet</strong> Interest Group <strong>Europe</strong><br />

(BIG-EU):<br />

TCP/IP<br />

<strong>BACnet</strong> Netzwerke<br />

<strong>BACnet</strong> Device Object_Identifier<br />

<strong>BACnet</strong> Device Object_Name<br />

Die Planung des BBMD erfolgt<br />

vom AN B-OWS in Abstimmung<br />

mit dem AG mittels B-PAT.<br />

1.1.4 Ausführung<br />

GA-Funktionalität wird in AS und<br />

B-OWS mit <strong>BACnet</strong> Objekten und<br />

Properties ausgeführt, es sind keine<br />

zusätzlichen Hilfsobjekte zulässig.<br />

Die Zeitsynchronisation im<br />

System ist nach folgendem Prinzip<br />

mit Windows- bzw. <strong>BACnet</strong>-<br />

Diensten einzurichten und zu dokumentieren:<br />

Ein GLT-Server führt die eigene<br />

Zeitsynchronisation mit einem<br />

Internet-Zeit-Server oder einer<br />

Funkuhr (Windows-Dienst) aus<br />

Eine B-OWS synchronisiert alle<br />

Automationsstationen, welche<br />

<strong>BACnet</strong>/IP unterstützen (<strong>BACnet</strong>-Dienst)<br />

Die Automationsstationen,<br />

wel che über <strong>BACnet</strong> MS/TP angeschlossen<br />

sind, werden über<br />

die jeweiligen Router bzw. zugeordnetenAutomationsstationen<br />

synchronisiert (<strong>BACnet</strong>-<br />

Dienst)<br />

Es ist darf kein einziges <strong>BACnet</strong>-<br />

Gerät von mehr als einem anderen<br />

<strong>BACnet</strong>-Gerät mit der Zeit synchronisiert<br />

werden.<br />

1.2. Enthaltene Leistungen<br />

Der Betreiber erhält Schulungen<br />

bis zum Administratorlevel.<br />

Der Betreiber erhält eine zeitlich<br />

und inhaltlich unbegrenzte Lizenz<br />

der Engineering-Tools zur Administrierung<br />

von AS und B-OWS<br />

(Programme, Applikationen, Grafiken,<br />

Parameter, <strong>BACnet</strong>…). Eine<br />

projektangepasste Limitierung<br />

bezüglich physikalischer Datenpunkte<br />

ist zulässig.<br />

<strong>BACnet</strong> insight<br />

Der Betreiber erhält alle Systempassworte<br />

für einen zeitlich und<br />

inhaltlich uneingeschränkten Zugriff<br />

auf AS und B-OWS.<br />

Die Steuerung in der Automationsstation<br />

muss vollständig engineert<br />

werden, so dass kein zusätzliches<br />

Engineering auf der Managementebene<br />

(<strong>BACnet</strong> Client) notwendig<br />

ist.<br />

2. <strong>BACnet</strong> – Automationsstation<br />

Der Abdruck von Kapitel 2 erfolgt<br />

in einer weiteren Ausgabe des<br />

<strong>BACnet</strong> <strong>Journal</strong>s und kann vorab<br />

bei den Autoren angefordert werden.<br />

3. <strong>BACnet</strong> – Management- und<br />

Bedieneinrichtungen (B-OWS)<br />

3.1. Grundlagen<br />

3.1.1 Datenaustausch<br />

Die Kommunikation zwischen<br />

B-OWS (<strong>BACnet</strong> Operator Workstation)<br />

und Automationsstation<br />

muss direkt über <strong>BACnet</strong> erfolgen,<br />

zwischengeschaltete OPC-Server<br />

sind nicht zulässig.<br />

Die Kommunikation zwischen AS<br />

und B-OWS erfolgt über <strong>BACnet</strong>,<br />

auch wenn eine proprietäre Kommunikation<br />

seitens des eingesetzten<br />

Automatisierungssystems<br />

möglich wäre.<br />

3.1.2 Alarmmanagements<br />

Beide Formen des Alarmmanagement<br />

(Intrinsic Reporting/Algorithmic<br />

Reporting) werden als<br />

Empfänger unterstützt.<br />

Es erfolgt kein automatischer Eintrag<br />

von Alarm-Empfängern in die<br />

Notification_Class Objects der AS<br />

durch die OWS.<br />

Alarme von den AS werden mit der<br />

B-OWS empfangen, aber nicht auf<br />

Grund der Änderung des Present_<br />

Value bzw. Status_Flags in der AS<br />

durch die B-OWS generiert.<br />

Beim Starten der B_OWS werden<br />

alle anstehenden Alarme angezeigt.<br />

(BIBB AE-INFO-A notwendig, falls<br />

AS dies nicht unterstützt, muss automatisch<br />

AE-ASUM-A bzw. AE-<br />

ESUM-A verwendet werden.)<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong> 33


<strong>BACnet</strong> insight<br />

3.1.3 Zeitpläne<br />

Es sind mindestens acht Schaltzeiten<br />

(Ein/Aus) pro Tag möglich,<br />

die über die OWS einstellbar sind.<br />

Die B-OWS muss in Zeitplänen<br />

unterschiedliche Typen unterstützen:<br />

Binary<br />

Analog<br />

Multistate<br />

Die B-OWS muss in Zeitplänen<br />

Sondertage auf zwei verschiedene<br />

Arten handeln können:<br />

Mit Calendar Objekt<br />

mit direktem Sondertag-Eintrag<br />

im Schedule Objekt<br />

3.1.4 Trends<br />

Die B-OWS muss Trends aus der<br />

AS:<br />

Anzeigen (Historische Daten<br />

über kurze Zeit)<br />

aus der AS auslesen und in eine<br />

Datenbank archivieren (Historische<br />

Daten über lange Zeit)<br />

die gespeicherten Daten als csv<br />

Datei zum Export bereitstellen<br />

können<br />

Die Darstellung der Inhalte der<br />

Trend_Log’s muss in nachfolgend<br />

aufgeführten Formen<br />

möglich sein:<br />

Grafisch<br />

Tabellarisch<br />

Das dynamische Erzeugen/<br />

Löschen von Trend_Log‘s mit der<br />

B-OWS in der AS muss möglich<br />

sein.<br />

3.1.5 Device Management<br />

Die B-OWS unterstützt das dynamische<br />

Erzeugen/Löschen von<br />

Objekten in beliebigen AS. (z.B.<br />

wichtig für das Anlegen von<br />

Trends, Alarmen… mit der B-<br />

OWS).<br />

Die B-OWS unterstützt UTC<br />

Time_Synchronization.<br />

3.2. Enthaltene Leistungen<br />

Der unberechtigte Zugriff wird<br />

über Passwortebenen der B-OWS<br />

geschützt, mindestens in der Abstufung:<br />

Administrator<br />

Programm- und Grafikerstellung<br />

34<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Bedienung mit Sollwertverstellung<br />

Gast<br />

Das Passwortkonzept wird vom<br />

AN dokumentiert.<br />

Die B-OWS ist in der Lage,<br />

<strong>BACnet</strong> Devices zu finden und<br />

die enthaltenen Objekte auszulesen.<br />

Die Generierung der Datenbasis<br />

der B-OWS erfolgt auf diesem<br />

Wege und nicht durch den Import<br />

von EDE Files.<br />

Introduction<br />

Users of <strong>BACnet</strong> based building<br />

automation systems are often dissatisfied<br />

because their expectations<br />

have not been fully met. This can<br />

be a due to any of the following<br />

reasons:<br />

The specification laid out extensive<br />

requirements of <strong>BACnet</strong> devices<br />

with an endless list of<br />

properties and BIBBSs, but<br />

failed to describe the actual operational<br />

requirements of the<br />

building automation system<br />

(performance).<br />

The specification simply stated<br />

“it must be <strong>BACnet</strong>”.<br />

The “contracted supplier” (CS)<br />

only delivered what they interpreted<br />

in the contract issued by<br />

the “contracted client” (CC),<br />

without taking the complete<br />

system comprising the automation<br />

stations and the B-OWS.<br />

The various tasks such as alarm<br />

generation, time schedules,<br />

trends, etc. are typically decentralized<br />

in <strong>BACnet</strong> systems. Instead,<br />

the specification failed to<br />

clearly separate the tasks to be<br />

performed in the automation<br />

stations from the tasks to be<br />

performed at the B-OWS level.<br />

The following texts (Sections 1, 2<br />

and 3) are based on practical experience<br />

and define the <strong>BACnet</strong> section<br />

of specifications, which will<br />

result in a higher quality <strong>BACnet</strong><br />

system.<br />

The authors encourage further<br />

discussion and additions to these<br />

texts. To this end, the respective<br />

document will be provided as a<br />

Word document upon request. A<br />

word of caution must be issued,<br />

however, when modifying the<br />

texts because even minor changes<br />

can sometimes work against the<br />

intent of the modifications.<br />

1. <strong>BACnet</strong> - General<br />

1.1. General Requirements<br />

1.1.1. General<br />

The 2004 <strong>BACnet</strong> Standard is the<br />

obligatory basis for any new installations.<br />

The operating system for servers,<br />

workstations, etc. shall be MS<br />

Windows-based operating systems<br />

such as Windows XP, Windows<br />

Vista, Windows Server 2003 or<br />

Windows Server 2008.<br />

1.1.2. Interoperability<br />

The PICS for the various devices<br />

to be included by the CS must be<br />

provided in advance together with<br />

the proposal. The PICS must detail<br />

which object properties are writeable.<br />

Various limitations with respect<br />

to configuration must also be<br />

detailed.<br />

The functionality between the B-<br />

OWS and automation stations in<br />

terms of the fulfilled requirements<br />

and consequent performance and<br />

engineering must be demonstrated<br />

prior to the contract being awarded<br />

in a test installation or in an<br />

equivalent interoperability test.<br />

1.1.3. Addressing/Network<br />

The design scheme of addresses is<br />

given by the CS B-OWS, see <strong>BACnet</strong><br />

Interest Group <strong>Europe</strong> (BIG-<br />

EU):<br />

TCP/IP<br />

<strong>BACnet</strong> Networks<br />

<strong>BACnet</strong> Device Object_Identifier<br />

<strong>BACnet</strong> Device Object_Name<br />

The design scheme of the BBMD is<br />

given by the CS B-OWS in coordination<br />

with the CC using B-PAT.<br />

1.1.4. Execution<br />

BAS functionality shall be performed<br />

within the automation stations<br />

and B-OWS using only <strong>BACnet</strong><br />

Objects and Properties. Sup-<br />

plementary objects to achieve this<br />

shall not be accepted.<br />

Time synchronisation thought out<br />

the system shall be implemented<br />

and documented using the respective<br />

Windows and <strong>BACnet</strong> services<br />

according to the following principle:<br />

A BAS server obtains its time<br />

synchronization from an internet<br />

time server or a radio signal<br />

clock (Windows service)<br />

A B-OWS synchronizes all automation<br />

stations that support<br />

<strong>BACnet</strong>/IP (<strong>BACnet</strong> service)<br />

automation stations connected<br />

via <strong>BACnet</strong> MS/TP are synchronized<br />

from the respective router<br />

or designated higher order automation<br />

stations.<br />

No <strong>BACnet</strong> device shall be time<br />

synchronised by more than one<br />

other <strong>BACnet</strong> device.<br />

1.2. Deliverables<br />

The Owner shall receive training<br />

up to administrator level.<br />

The Owner shall receive all engineering<br />

tools up to administrator<br />

level to administrate automation<br />

stations and B-OWS (programs,<br />

applications, graphics, parameters,<br />

<strong>BACnet</strong>...), which are to be<br />

unlimited in both scope and activation<br />

time. A project related limitation<br />

with respect to the number<br />

of physical data points shall be allowed.<br />

The Owner shall receive all system<br />

passwords for access to the<br />

automation stations and B-OWS,<br />

which are unlimited in both scope<br />

and activation time.<br />

The operating sequences of the<br />

automation stations shall be engineered<br />

to completion without requiring<br />

any additional engineering<br />

on the management level (<strong>BACnet</strong><br />

client).<br />

2. <strong>BACnet</strong> – Automation<br />

Station<br />

Section 2 will be published in a future<br />

edition of the <strong>BACnet</strong> <strong>Journal</strong><br />

and can be provided by the authors<br />

upon request.


3. <strong>BACnet</strong> – Management<br />

and Operator Requirements<br />

(B-OWS)<br />

3.1. Basic Requirements<br />

3.1.1. Data Exchange<br />

The communication between B-<br />

OWS (<strong>BACnet</strong> Operator Workstation)<br />

and the automation stations<br />

shall be direct using <strong>BACnet</strong> protocol;<br />

intermediary OPC server(s)<br />

will not be accepted automation<br />

stations.<br />

The communication between the<br />

automation stations and B-OWS<br />

shall be required to utilize <strong>BACnet</strong><br />

protocol, even when proprietary<br />

communication supported by the<br />

implemented automation systems<br />

could be possible.<br />

3.1.2. Alarm Management<br />

Both types of alarm management<br />

(intrinsic reporting/algorithmic reporting)<br />

shall be supported by the<br />

Subscriber.<br />

There is no automatic entry of<br />

alarm subscibers in the Notifiction_<br />

Class objects in the automation station<br />

by the B-OWS.<br />

Alarms from automation stations<br />

shall be received by the B-OWS,<br />

but not as a result of he change of<br />

Present_Value or status flags in automation<br />

stations generated by the<br />

B-OWS.<br />

The B-OWS shall display all existing<br />

alarms upon start-up. (BIBB<br />

AE-INFO-A required, if not supported<br />

in the automation station<br />

then AE-ASUM-A or AE-ESUM-<br />

A must automatically be utilized).<br />

3.1.3. Time Schedules<br />

A minimum of 8 switch times per<br />

day shall be possible, which can be<br />

programmed from the B-OWS.<br />

The B-OWS shall be able to support<br />

the following Object types:<br />

Binary<br />

Analog<br />

Multistate<br />

The BOWS shall be able to handle<br />

exception days in two different<br />

ways:<br />

using Calendar Objects<br />

exception day entry directly in<br />

the Schedule Object<br />

3.1.4. Trends<br />

The B-OWS shall:<br />

display trends resident in the automation<br />

station (near term historical<br />

data)<br />

retrieve Trends from the automation<br />

station and archive them<br />

in a database (long term historical<br />

data)<br />

be able to export the stored data<br />

as a csv file<br />

The presentation of the Trend_<br />

Log contents shall be possible in<br />

following formats:<br />

graph<br />

tabular<br />

It shall be possible to dynamically<br />

create and delete Trend_Logs in<br />

any automation station from the<br />

B-OWS.<br />

3.1.5. Device Management<br />

The B_OWS shall support dynamic<br />

creation and deletion of<br />

Objects in any automation station<br />

(e.g. important for setting<br />

up trends, alarms... using the B-<br />

OWS).<br />

The B-OWS shall support UTC Time_Synchronisation.<br />

3.2. Deliverables<br />

Unauthorized access shall be protected<br />

by password levels in the<br />

B-OWS, which shall provide the<br />

following levels as a minimum requirement:<br />

administrator<br />

creation of programs and graphics<br />

operator with set point adjustment<br />

guest<br />

The password structure is to be<br />

documented by the CS.<br />

The B-OWS shall be able to find<br />

<strong>BACnet</strong> devices and read the<br />

objects contained therein. The<br />

B-OWS shall generate the data<br />

through this method and not<br />

through the import of EDE files.<br />

Wo von offener Gebäudeautomation<br />

die Rede ist, spricht<br />

man von <strong>BACnet</strong>.<br />

Wo diese auch modular,<br />

mitwachsend und energieeffzient<br />

ist, von SAUTER.<br />

SAUTER EY-modulo 5: Mit <strong>BACnet</strong>/IP.<br />

Energieeffi zienz, Offenheit und Wirtschaftlichkeit. Modul für<br />

Modul für Modul. Modulare, native <strong>BACnet</strong>-Stationen der<br />

SAUTER EY-modulo 5 Familie sind in jeder Hinsicht die intelligente<br />

Lösung für alle Anforderungen im Gebäudemanagement<br />

und bei Raumautomationen. Mit optimalen Funktionsmodulen,<br />

integrierter Web-Anbindung sowie komfortabler<br />

Einzelraumregelung, setzt SAUTER neue Massstäbe. Frei<br />

programmierbar, sorgt SAUTER EY-modulo 5 für optimale Systemintegration<br />

(z.B. M-Bus, Modbus) und reibungslosen Betrieb.<br />

Erfahren Sie mehr über seine vielfältigen Möglichkeiten:<br />

www.sauter-controls.com<br />

Systems<br />

Components<br />

Services<br />

Facility Management


<strong>BACnet</strong> insight<br />

Zeitschaltfunktionen in <strong>BACnet</strong><br />

Teil 2: Wie sind die Zeitschaltfunktionen in <strong>BACnet</strong> realisiert?<br />

Schedule-Integration in <strong>BACnet</strong><br />

Part 2: How are the scheduling functions realized in <strong>BACnet</strong>?<br />

Frank Schubert 1<br />

Im ersten Teil dieses Grundlagenartikels<br />

über Zeitschaltfunktionen<br />

wurden die Objekte Calendar<br />

und Schedule anhand ihrer<br />

Eigenschaften vorgestellt (<strong>BACnet</strong><br />

<strong>Europe</strong> <strong>Journal</strong> <strong>10</strong> S. 42-43).<br />

Dieser Artikel beschreibt nun die<br />

applikationsbezogene Funktionsweise<br />

von Zeitschaltprogrammen.<br />

Generelle Arbeitsweise<br />

des Schedule-Objektes<br />

Zeitschaltpläne werden anhand von<br />

Tagen referenziert, als Wochenplan<br />

(Weekly Schedule, 7 Tage) oder als<br />

Ausnahmeplan (ExceptionSchedule,<br />

Reihe von Sondertagen).<br />

Der aktuelle Wert des Zeitschaltplans<br />

wird über die Eigenschaft<br />

„PresentValue“ repräsentiert, wobei<br />

jede Änderung auf die in der<br />

„List_of_Object_Property_References“<br />

eingetragenen Eigenschaften<br />

geschrieben wird. Wenn<br />

es sich um externe Geräte handelt,<br />

wird hierzu der Dienst WriteProperty<br />

oder WritePropertyMultiple<br />

verwendet, handelt es sich um Objekte<br />

im selben Gerät wie der Zeitschaltplan,<br />

werden diese intern<br />

übergeben (lokale Aufgabe der Anwendung).<br />

Jedem Tag des Wochen- oder Ausnahmezeitplans<br />

ist eine Liste von<br />

Zeitpunkt-/Werte-Pärchen (Time-<br />

Value) zugeordnet. Diese stellen<br />

die Schaltzeiten und den gewünschten<br />

Wert zum jeweiligen Zeitpunkt<br />

dar. Erreicht die aktuelle Uhrzeit einen<br />

Schaltpunkt, so wird der zu diesem<br />

Zeitpunkt gültige Wert auf die<br />

in der Liste enthaltenen Referenzen<br />

geschrieben. Ist es aufgrund kommunikativer<br />

Fehlfunktionen nicht<br />

möglich, einen einzelnen Wert zu<br />

schreiben, so wird die Liste dennoch<br />

bis zum Ende abgearbeitet.<br />

36<br />

Mit dem Zeitschaltplan ist es ebenfalls<br />

möglich, einen Wert auch<br />

wieder zurück zu nehmen, hierzu<br />

wird die Konstante NULL verwenden<br />

(vergl. hierzu Insight Artikel<br />

zum Thema Kommandopriorisierung).<br />

Ermittlung des Wertes<br />

Die Ermittlung des jeweils gültigen<br />

Wertes ergibt sich durch folgendes<br />

vorgegebene Verfahren:<br />

1) Es wird die höchste relative Priorität<br />

des Ausnahmezeitplans<br />

des jeweiligen Tages ermittelt<br />

und der Wert (sofern ungleich<br />

NULL) auf den PresentValue geschrieben.<br />

Dazu hat jeder Eintrag<br />

im Ausnahmeplan eine Ereignispriorität<br />

von 1-16, die<br />

relativ zu den anderen Einträgen<br />

des Ausnahmeplans betrachtet<br />

wird. Diese Ereignispriorität<br />

steht jedoch in keinem Zusammenhang<br />

zur Schreibpriorität,<br />

welche als separate Eigenschaft<br />

festgelegt ist.<br />

2) Wenn in Schritt 1 kein Wert gefunden<br />

wurde, wird der Wochenschaltplan<br />

nach Einträgen<br />

ungleich NULL durchsucht und<br />

ggf. geschrieben.<br />

3) Als Vorgabewert wird als letzte<br />

Möglichkeit der Wert der Eigenschaft<br />

„ScheduleDefault“ verwendet.<br />

Die Methode zur Ermittlung des<br />

PresentValue basiert auf der Evaluierung<br />

desjenigen TimeValues, der<br />

vor oder zur aktuellen Zeit gültig<br />

war, andernfalls ist dieser NULL.<br />

Die Berechnung kann zu jedem<br />

Zeitpunkt erfolgen, muss aber<br />

zwingend um 00:00 Uhr jedes Tages,<br />

bei Neustart des Gerätes, oder<br />

bei Änderung von Werten, die den<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Zeitschaltplan beeinflussen, bei relevanten<br />

Uhrzeitänderungen sowie<br />

bei allen Zeitpunkten erfolgen, die<br />

für eine korrekte Zeitschaltfunktion<br />

erforderlich sind.<br />

Aus Kompatibilitätsgründen zu<br />

<strong>BACnet</strong> Revisionen < 4 wurde eine<br />

spezielle Behandlung der Uhrzeit<br />

00:00 eingeführt. Grundsätzlich<br />

nimmt der Zeitschaltplan um<br />

Mitternacht den Wert der Eigenschaft<br />

ScheduleDefault an, es sei<br />

denn, für den Zeitpunkt 00:00<br />

Uhr des jeweiligen Tages ist ein<br />

Eintrag gesetzt (dieser gilt dann<br />

für den ganzen Tag als Vorgabe).<br />

Soll also der Zeitschaltplan fortlaufend<br />

arbeiten, muss ein Eintrag um<br />

00:00 Uhr mit dem gewünschten<br />

Wert vorhanden sein.<br />

Die Gültigkeit des Zeitschaltplans<br />

kann durch die Eigenschaft „EffectivePeriod“jahreszeitabhängig<br />

festgelegt werden (Datum von/<br />

bis), weiterhin ist es möglich, Zeitschaltvorgänge<br />

zu simulieren (Outof-Service).<br />

Datums- oder Zeitangaben<br />

Bei der Festlegung von Datums-<br />

oder Zeitangaben sind Platzhalter<br />

erlaubt, so könnte zum Beispiel<br />

jedes Jahr Heiligabend an beliebigen<br />

Wochentagen durch Setzen<br />

des Platzhalters für Jahr und<br />

Wochentag und der Festlegung<br />

Tag=24 und Monat=12 definiert<br />

werden, jedoch können sich z.B.<br />

bei Datumsbereichen ungültige<br />

Kombinationen wie „von Donnerstag<br />

bis 20<strong>11</strong>“ ergeben, zu denen<br />

es keine reale Entsprechung<br />

gibt. Hierzu ist jedoch bereits eine<br />

Ergänzung der Spezifikationen<br />

in Vorbereitung.<br />

Der verwendete Datentyp ergibt<br />

sich aus den Propertyreferenzen,<br />

die vom Schedule-Objekt beein-<br />

1 Frank Schubert, MBS GmbH, ist Mitglied des Advisory Board und der Arbeitsgruppe Technik der BIG-EU sowie als<br />

Schulungsleiter der <strong>BACnet</strong> Interest Group <strong>Europe</strong> aktiv, frank.schubert@mbs-software.de.<br />

Frank Schubert, MBS GmbH, is member of the Advisory Board and Working Group Technique of the BIG-EU as well<br />

as training-leader of the <strong>BACnet</strong> Interest Group <strong>Europe</strong>, frank.schubert@mbs-software.de.<br />

flusst werden. Haben diese durch<br />

falsche Konfiguration unterschiedliche<br />

Datentypen, nimmt die Verfügbarkeit<br />

des Zeitschaltplans den<br />

Wert „Configuration_Error“ an<br />

und die Statusinformationen werden<br />

entsprechend gesetzt. Dies<br />

bedeutet, dass sowohl die Werte<br />

als auch die referenzierten Eigenschaften<br />

vom Datentyp übereinstimmen<br />

müssen. Normalerweise<br />

werden Analogwerte, Digitalwerte<br />

oder mehrstufige Werte zeitgesteuert,<br />

jedoch können auch andere<br />

Datentypen (z.B. Zeichenketten)<br />

zeitgesteuert gesetzt werden.<br />

Der PresentValue und Schedule-<br />

Default sind vom Typ „Any (beliebig)“<br />

und können jeden unterstützten<br />

primitiven Datentyp<br />

abbilden.<br />

The first part of this article introduced<br />

the object-types Schedule<br />

and Calendar by their properties<br />

(<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>10</strong>, p. 42-<br />

43). This article describes how the<br />

schedule application works in <strong>BACnet</strong><br />

devices.<br />

General function<br />

of schedule objects<br />

Schedules are divided into weekly<br />

(7 days) or exception schedules<br />

(array of special events).<br />

The actual value of the schedule is<br />

referenced by it’s property “PresentValue”<br />

and each change of<br />

this value causes the referenced<br />

properties in the “List_of_Object_<br />

Property_References” to be updated.<br />

If the reference is set to an<br />

external device, the services Write-<br />

Property or WritePropertyMultiple<br />

are used to write the value. If<br />

both the schedule and the referenced<br />

object and property are located<br />

within the same device, updating<br />

the values is a local matter.<br />

Each day of the weekly and exception<br />

schedule contains a list<br />

of time/value pairs. These are intended<br />

to be used as circuit times<br />

where the associated value is set at


the given point in time. If the time<br />

of day reaches a TimeValue, the<br />

value is written to the referenced<br />

properties. In case of a write error<br />

to an entry, the list is processed<br />

until the end and all elements have<br />

been tried to write.<br />

The schedule may also allow withdrawal<br />

of a previously written value<br />

using the NULL value to write<br />

a priority (see Insight article about<br />

command prioritization in <strong>BACnet</strong>).<br />

Determination of Value<br />

Determination of the currently<br />

valid value of the schedule follows<br />

these rules specified in the standard:<br />

1) The highest relative priority of<br />

the exception schedule is determined<br />

and the value (if not<br />

NULL) is written to the PresentValue.<br />

Each entry in the exception<br />

schedule has it’s event<br />

priority in the range from 1-16<br />

relative to the other entries in<br />

Over Years In Networked Controls<br />

the exception list. This event<br />

priority has no relationship to<br />

the write priority though. This<br />

is a separate property in the<br />

schedule.<br />

2) If in Step 1 no value could be<br />

determined, the application<br />

evaluates the current value<br />

from the weekly schedule for<br />

the specific day and if it is not<br />

NULL, the value is written to<br />

PresentValue.<br />

3) As the default value, the value<br />

for PresentValue is taken from<br />

the property ScheduleDefault.<br />

The method to determine the value<br />

for PresentValue is based on<br />

the evaluation of the TimeValue<br />

which was active before or at the<br />

time of day, otherwise NULL.<br />

Evaluation of the schedule can<br />

be performed anytime, but is required<br />

at least at midnight (00:00)<br />

each day, after device restart, when<br />

changes occur that affect the sched-<br />

ule, schedule-relevant time changes<br />

and at all times where it is necessary<br />

to assure a valid schedule.<br />

Due to compatibility to <strong>BACnet</strong><br />

revisions < 4 a special function was<br />

added at midnight (midnight evaluation).<br />

At midnight the schedule<br />

is reset to the value in ScheduleDefault<br />

except a TimeValue is set for<br />

00:00, which then becomes the default<br />

for that day. If the schedule<br />

is intended to work continuously<br />

over many days, each day requires<br />

an entry at midnight with the expected<br />

schedule value.<br />

The general validity of the schedule<br />

within the year may be set using<br />

the EffectivePeriod property<br />

(date from/to), furthermore it is<br />

possible to simulate scheduled values<br />

(Out-of-Service).<br />

Time or Date Values<br />

Wildcards are allowed for certain<br />

parts of time or date values, so<br />

Christmas Eve each year (regardless<br />

which day of the week) may<br />

<strong>BACnet</strong> insight<br />

be specified by setting wildcards<br />

for the year and day of week and<br />

setting day to 24 and month to 12.<br />

There are invalid combinations<br />

possible though especially when<br />

using date-ranges, e.g. “from<br />

Thursday until 20<strong>11</strong>”, which has<br />

no real-world equivalent.<br />

The SSPC is already about to extend<br />

the specifications for this.<br />

The data-type of the schedule is<br />

determined by the property references,<br />

in case those are unequal<br />

by mistake, the reliability of the<br />

schedule changes to “Configuration_Error”<br />

and the status flags<br />

reflect this state, too. Normally<br />

analog, binary or multi-state values<br />

are scheduled, but other data-types<br />

may be scheduled as well<br />

(e.g. Character Strings).<br />

The properties PresentValue and<br />

ScheduleDefault have the datatype<br />

“Any” so they can support any<br />

specified primitive <strong>BACnet</strong> datatype.<br />

The BAS Router<br />

Connecting <strong>BACnet</strong> MS/TP<br />

to Your <strong>BACnet</strong> ® /IP Network<br />

• N-Way Routing<br />

• <strong>10</strong>/<strong>10</strong>0 Mbps Ethernet<br />

<strong>BACnet</strong>/IP to <strong>BACnet</strong> MS/TP<br />

<strong>BACnet</strong>/IP to <strong>BACnet</strong>/Ethernet<br />

<strong>BACnet</strong>/Ethernet to <strong>BACnet</strong> MS/TP<br />

<strong>BACnet</strong>/IP (net 1) to <strong>BACnet</strong>/IP (net 2)<br />

• BBMD with FDR<br />

• <strong>BACnet</strong>/IP to <strong>BACnet</strong>/IP for NAT traversal<br />

Building Connectivity<br />

• 24 VAC or VDC powered<br />

• Rugged metal enclosure<br />

• DIN rail mounting<br />

• Optically isolated MS/TP port<br />

• MS/TP baud rates 9.6 to 76.8 kbps<br />

Visit www.ccontrols.com/bro<br />

Or call +44 (0)24 7641 3786 or +49 341 5203590


<strong>BACnet</strong> insight<br />

Planung der Gebäudeautomation<br />

mit <strong>BACnet</strong> – wesentliche funktionelle Vorgaben<br />

Building Automation Planning with <strong>BACnet</strong> –<br />

Essential Functional Requirements<br />

Marius Hartel 1<br />

Bei der Planung der Gebäudeautomation<br />

hat sich die Forderung nach<br />

dem offenen und herstellerneutralen<br />

Datenkommunikationsprotokoll<br />

<strong>BACnet</strong> inzwischen durchgesetzt.<br />

Bei der Umsetzung der funktionellen<br />

Anforderungen der Gebäudeautomation<br />

an die Spezifikationen von<br />

<strong>BACnet</strong> fehlt hingegen in den meisten<br />

Ausschreibungsunterlagen vielfach<br />

die notwendige Planungstiefe.<br />

<strong>BACnet</strong><br />

Der <strong>BACnet</strong> Standard als Teil der<br />

Weltnorm für Gebäudeautomation<br />

DIN EN ISO 16484 bietet das<br />

umfänglichste und leistungsfähigste<br />

Datenkommunikationsprotokoll in<br />

der Gebäudeautomation, das ohne<br />

Lizenzrechte und ohne herstellerspezifische<br />

Hardware für jedermann<br />

zugänglich ist. Bei der Planung von<br />

Gebäudeautomationssystem mit<br />

<strong>BACnet</strong> wird hingegen die vorhandene<br />

Leistungsfähigkeit von <strong>BACnet</strong><br />

meistens nicht vollständig genutzt.<br />

Planungsvorgaben<br />

Sofern der beauftragte Gebäudeautomationsplaner<br />

nicht bereits als<br />

Integrationsplaner im Rahmen der<br />

Bedarfsplanung aktiv auf die Gestaltung<br />

des GA-Gesamtsystems und<br />

der betreffenden TGA-Anlagenkomponenten<br />

mitwirken kann, basiert<br />

seine Tätigkeit auf den Grundlagen<br />

der gültigen Normen und<br />

Richtlinien, den Vorgaben des Auftraggebers<br />

(z.B. Lastenhefte) und<br />

den Vorleistungen der beteiligten<br />

TGA-Fachplanung.<br />

GA-Funktionsliste<br />

Eine der wesentlichen Tätigkeiten<br />

des GA-Fachplaners ist die Erstellung<br />

der Automationsschemen und<br />

der zugehörigen GA-Funktionslisten<br />

gemäß DIN EN ISO 16484-<br />

3 bzw. VDI 3814 Blatt 1. Diese<br />

Listen enthalten sämtliche erforderlichen<br />

physikalischen und kommunikativen<br />

Datenpunkte sowie de-<br />

38<br />

ren Funktionen im GA-System. Die<br />

GA-Funktionsliste wird ebenfalls als<br />

Kalkulationstabelle zum Addieren<br />

von GA-Funktionen genutzt.<br />

Beachte: Funktion ≠ Datenpunkt,<br />

oder eine hohe Anzahl von Funktionen<br />

bedeutet nicht eine gleich hohe<br />

Anzahl von Datenpunkten!<br />

Obwohl die Vorgaben an die GA-<br />

Funktionslisten umfangreich sind,<br />

werden diese in der Praxis oft nicht<br />

umgesetzt und speziell beim Einsatz<br />

von <strong>BACnet</strong> fehlen die wesentlichen<br />

Inhalte. Es sollten grundsätzlich<br />

nur die erforderlichen Funktionen<br />

in diese Liste aufgenommen werden<br />

(keine Reservefunktionen). Die<br />

einzelnen Funktionen sollten nicht<br />

interpretiert sondern gemäß den<br />

Vorgaben der Norm verwendet werden.<br />

E/A-Funktionen mit eigener<br />

Benutzeradresse und Zeilen Nr.<br />

Sämtliche Eingabe- und Ausgabefunktionen<br />

(physikalische sowie<br />

gemeinsame, kommunikative und<br />

virtuelle) mit einer eigenen Datenpunktadresse<br />

(bzw. Benutzeradresse)<br />

sollen in einer eigenen Zeile der<br />

GA-Funktionsliste aufgeführt werden.<br />

Das gilt auch für sämtliche Datenpunkte<br />

eines Aggregates (siehe<br />

Abb. 1).<br />

Nur so lassen sich die erforderlichen<br />

zugehörigen Verarbeitungs-, Management-<br />

und Bedienfunktionen<br />

eindeutig zuordnen (siehe Abb. 2).<br />

Die Zeilen-Nummer muss pro zugehörige<br />

Betrachtungseinheit (meistens<br />

ISP) fortlaufend und durchgängig<br />

verwendet werden.<br />

Nur so können die eindeutigen Verweise<br />

innerhalb der Bemerkungsspalten<br />

angegeben werden (siehe<br />

Abb. 3).<br />

Gemeinsame Funktionen<br />

Im Abschnitt 2 der GA-Funktionsliste<br />

müssen alle E/A-Funktionen<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

für gemeinsame, kommunikative<br />

und virtuelle Datenpunkte mit einer<br />

eindeutigen Datenpunkt- oder Benutzeradresse<br />

eingetragen werden.<br />

Hierzu gehören neben gemeinsamen<br />

E/A-Funktionen von einem anderen<br />

System auch eindeutig gemeinsam<br />

genutzte E/A-Funktionen aus anderen<br />

Automationsstationen des eigenen<br />

Systems (siehe Abb. 4).<br />

Beachte: Die Kosten für physikalische<br />

E/A-Funktionen sind höher<br />

als die Kosten für gemeinsame<br />

Funktionen!<br />

Komplexe<br />

Steuerungsfunktionen<br />

Die im Abschnitt 4 der GA-Funktionsliste<br />

einzutragenden komplexen<br />

Steuerungsfunktionen wie<br />

Anlagensteuerung und Motorsteuerung<br />

bedingen zur Darstellung<br />

der gewünschten Steuerungsaufgaben<br />

den Einsatz von zusätzlichen<br />

erläuternden Unterlagen in<br />

Form von Zustandsgraphen bzw.<br />

Ablauf diagrammen (siehe Abb. 5<br />

und 6).<br />

Nur so werden eine Kalkulation und<br />

eine Ausführung der geplanten Leistung<br />

gemäß den Vorgaben des Planers<br />

möglich.<br />

Komplexe Objekttypen<br />

Gerade bei GA-Systemen mit<br />

<strong>BACnet</strong> sind die planerischen Vorgaben<br />

der zu verwendenden komplexen<br />

Objekttypen unerlässlich<br />

(siehe Abb. 7).<br />

Der planende Ingenieur muss alle<br />

projektspezifischen Anforderungen<br />

an sämtliche (Ein-/Ausgabe-, Verarbeitungs-,<br />

Management- und Bedien-)<br />

Funktionen mit Zuordnung<br />

der zu verwendenden <strong>BACnet</strong>-Objekttypen<br />

in der Bemerkungsspalte<br />

spezifizieren. Erst mit der Auswahl<br />

der notwendigen Funktionen<br />

und der zugehörigen <strong>BACnet</strong>-Objekte<br />

ist eine globale Spezifizierung<br />

der <strong>BACnet</strong>-Anforderungen gemäß<br />

1 Marius Hartel, geschäftsführender Gesellschafter der GA Ingenieurgesellschaft mbH, ist Mitglied der BIG-EU,<br />

mh@ga-ing.de.<br />

Marius Hartel, Managing Partner GA Ingenieurgesellschaft mbH, is member of the BIG-EU, mh@ga-ing.de.<br />

Abb. 1: Funktionsliste<br />

Einzelzeilendarstellung<br />

Fig. 1: BACS function list: single<br />

line for each function<br />

Abb. 2: GA-Verarbeitungs-<br />

funktionen<br />

Fig. 2: BACS processing<br />

functions<br />

Abb. 3: eindeutige Zeilenverweise<br />

innerhalb<br />

der Bemerkungsspalte<br />

Fig. 3: Unique references<br />

in the Remarks column<br />

Abb. 4: GA-Ein-/<br />

Ausgabefunktionen<br />

Fig. 4: BACS I/O functions


Abb. 5: GA-Anlagensteuerung<br />

Fig.5: BACS plant control<br />

Abb. 6: zugehöriges<br />

Ablaufdiagramm<br />

Fig. 6: Corresponding flow chart<br />

Abb. 7: GA-komplexe Objekte.<br />

Fig. 7: BACS complex Objects<br />

Abb. 8: STLB-Bau Beiblatt <strong>BACnet</strong><br />

Fig. 8: <strong>BACnet</strong> Annex for<br />

German master<br />

specification for tenders<br />

Abb. 9: GA-Datenpunkt<br />

Motorstörung<br />

Fig.9: Motor failure data point<br />

Abb. <strong>10</strong>: zugehörige<br />

Bemerkungsspalte<br />

Fig. <strong>10</strong>: Corresponding<br />

Remarks column<br />

dem Beiblatt 070-12 im STLB-Bau<br />

sinnvoll (siehe Abb. 8).<br />

Beispiel: Erst wenn der Einsatz eines<br />

Event Enrollment Objektes gemäß<br />

der GA-Funktionsliste erforderlich<br />

wird, ist eine generelle Forderung<br />

dieses Objektes und der zugehörigen<br />

Dienste im Beiblatt der Ausschreibungsunterlagen<br />

gerechtfertigt.<br />

Beachte: Zuerst die erforderlichen<br />

GA-Funktionen ermitteln und erst<br />

dann übergeordnete Anforderungen<br />

an <strong>BACnet</strong> festschreiben!<br />

Bemerkungsspalte<br />

Neben den zu verwendenden<br />

<strong>BACnet</strong>-Objekttypen müssen alle<br />

zusätzlichen, ergänzenden bzw.<br />

nicht zur Norm gehörende Funktionen<br />

datenpunktbezogen, zeilenweise<br />

in der Bemerkungsspalte erläutert<br />

werden (Abb. 9 und <strong>10</strong>). Ist<br />

der Platz für die erforderlichen Angaben<br />

innerhalb der Bemerkungsspalten<br />

nicht ausreichend, sind zusätzliche,<br />

eindeutig referenzierende<br />

Beiblätter zu verwenden.<br />

Empfehlung<br />

Der beste und kosteneffektivste Weg<br />

zur Planung und Überwachung der<br />

Ausführung der Gebäudeautomation<br />

mit <strong>BACnet</strong> ist der Einsatz von<br />

qualifizierten, neutralen GA-Fachplanern.<br />

In planning the building automation<br />

and control systems, the demand<br />

for the open and multivendor data<br />

communications protocol <strong>BACnet</strong> is<br />

now enforced.<br />

However in implementing the functional<br />

requirements of the building<br />

automation and control systems to<br />

the specifications of <strong>BACnet</strong>, the<br />

necessary planning depth in the tender<br />

documents is mostly lacking.<br />

<strong>BACnet</strong><br />

The <strong>BACnet</strong> standard, as part of<br />

the global standard for building automation<br />

and control systems DIN<br />

EN ISO 16484, offers the most extensive<br />

and powerful communications<br />

protocol for building automation<br />

and control systems, without<br />

the license rights and without the<br />

need for specific vendor hardware.<br />

However in planning the Building<br />

Automation and Control System<br />

(BACS) with <strong>BACnet</strong>, the existing<br />

capability of <strong>BACnet</strong> is usually not<br />

fully used.<br />

Planning guidelines<br />

Unless the instructed building automation<br />

planners are already active<br />

as integration engineers in the planning<br />

of the overall BAC-Systems<br />

and the relevant system components<br />

of the building services, their work<br />

is based on the foundations of the<br />

current standards and guidelines,<br />

the requirements of the owner (e.g.<br />

specification) and the inputs of the<br />

participating building services planners.<br />

BACS function list<br />

One of the main activities of the<br />

BACS planner is to create the automation<br />

schematic and related<br />

BACS function lists in accordance<br />

with DIN EN ISO 16484-3 or VDI<br />

3814 Part 1. These lists contain all<br />

the necessary physical and communicative<br />

data points and their functions<br />

in the BAC-system. The BACS<br />

function list is also used as a calculation<br />

table for adding up automation<br />

functions.<br />

Note: Function ≠ data point, or<br />

a high number of functions does<br />

not mean an equal number of data<br />

points!<br />

Although the guidelines for the<br />

BACS function lists are extensive,<br />

they are not often implemented in<br />

practice and especially in the use of<br />

<strong>BACnet</strong> lack substantial content. In<br />

principle, only the necessary functions<br />

should be included in that list<br />

(no reserve functions). The various<br />

functions should not be interpreted<br />

but used in accordance with the requirements<br />

of the standard.<br />

I/O functions with a unique data<br />

point address and row No.<br />

All input/output functions (physical<br />

and for shared, communicative and<br />

virtual data points), with a unique<br />

data point address (or user address),<br />

shall be entered in their own line of<br />

the BACS function list. This also applies<br />

to all data points of one aggregate<br />

(fig. 1).<br />

Only then the necessary associated<br />

processing, management and operator<br />

functions can be clearly assigned<br />

(fig. 2).<br />

The row No. per associated observation<br />

unit (usually set of controllers)<br />

continuously and consistently<br />

must be used. Only then the unique<br />

references in the remarks columns<br />

can be indicated (fig. 3).<br />

Shared-functions<br />

In section No. 2 of the BACS function<br />

list all I/O functions for shared,<br />

communicative and virtual data<br />

points with a unique data point address<br />

must be entered. This includes<br />

not only such shared I/O functions<br />

from another system but also shared<br />

I/O functions from other controllers<br />

of their own system (fig. 4).<br />

<strong>BACnet</strong> insight<br />

Note: The costs of physical I/O<br />

functions are higher than the cost of<br />

shared functions!<br />

Complex control functions<br />

The desired complex control functions<br />

such as plant control and motor<br />

control to be entered in section<br />

No. 4 of the BACS function list,<br />

require an additional explanatory<br />

documentation in the form of state<br />

graphs or flow charts (fig. 5 and 6).<br />

Thus, a cost estimate and a design<br />

of the planned performance in accordance<br />

with the requirements of<br />

the planner will be possible.<br />

Complex object types<br />

Especially in building automation<br />

systems with <strong>BACnet</strong>, the planning<br />

requirements of the complex object<br />

types to be used are essential (fig. 7).<br />

The planning engineer has to specify<br />

all project requirements for all<br />

functions (e.g. I/O, processing,<br />

management and operator functions)<br />

with an assignment to used<br />

<strong>BACnet</strong> object types in the remarks<br />

column. Only with the selection<br />

of the necessary functions and the<br />

corresponding <strong>BACnet</strong> objects, a<br />

global specification of <strong>BACnet</strong> requirements<br />

according to the <strong>BACnet</strong><br />

Annex for German master specification<br />

for tenders makes sense<br />

(fig. 8).<br />

Example: only when the use of an<br />

Event Enrollment object according<br />

to the BAC function list is necessary,<br />

a general requirement of this<br />

object and related services in the<br />

Annex to the tender documents is<br />

justified.<br />

Note: First identify the necessary<br />

BAC functions and then enact the<br />

overall requirements of <strong>BACnet</strong>!<br />

Remarks column<br />

Besides <strong>BACnet</strong> object types to be<br />

used, all additional, complementary<br />

and non-standard functions<br />

based on each data point need to<br />

be explained in the remarks column<br />

(fig. 9 and <strong>10</strong>).<br />

If the space for the required information<br />

within the comment column<br />

is not sufficient, additional,<br />

clearly referenced separate sheets<br />

have to be used.<br />

Recommendation<br />

The best and most cost effective<br />

way of planning and monitoring<br />

the performance of building<br />

automation and control systems<br />

with <strong>BACnet</strong> is the use of qualified,<br />

neutral and professional BAC<br />

planners.<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong> 39


TM<br />

buildings under control<br />

������<br />

Visualization<br />

OPC XML/DA Server<br />

Alarming<br />

Scheduling<br />

Trending<br />

Notification<br />

Remote Access<br />

Calculation<br />

LOYTEC offers a suite of Building Management<br />

Systems featuring graphical user interfaces,<br />

integration platforms, gateways and infrastructure<br />

products. Open protocol devices that provide efficient,<br />

effective and user-friendly integration for property<br />

management.<br />

Customers worldwide utilize LOYTEC solutions to<br />

manage individual buildings and distributed real estate.<br />

Contact us today for details on how we can become<br />

your network partner.<br />

LOYTEC electronics GmbH, Blumengasse 35, <strong>11</strong>70 Vienna, Austria<br />

info@loytec.com • Tel.: +43 (1) 40208050 • Fax: +43 (1) 4020805-99<br />

www.loytec.com<br />

TM<br />

networks under control


Alle <strong>BACnet</strong>-Daten auf einen Blick –<br />

die neuen L-VIS Touch Panels<br />

All <strong>BACnet</strong> Data at a Glance –<br />

the New L-VIS Touch Panels<br />

LOYTEC erweitert die L-VIS Produktlinie. Mit LVIS-<br />

ME212 und LVIS-ME215 stehen ab Dezember 20<strong>09</strong> zwei<br />

Touch Panels für das Bedienen und Beobachten von<br />

Informationen aus <strong>BACnet</strong> Netzwerken zur Verfügung.<br />

LOYTEC expands the L-VIS product line. The LVIS-ME<strong>11</strong>2<br />

and LVIS-ME215 Touch Panels are available December<br />

20<strong>09</strong> to visualize and control information from a <strong>BACnet</strong><br />

Network.<br />

Die Touch Panels eignen<br />

sich hervorragend zur<br />

Visualisierung und Bedienung<br />

von HLK-Anwendungen<br />

(HVAC, Heizung,<br />

Lüftung, Klima). Ohne den<br />

Einsatz von PC-Hardware<br />

übernehmen Sie die Visualisierung<br />

in Gebäudeautomationssystemen,<br />

wo kein Gebäudemanagementsystem<br />

zum Einsatz kommt. Auch in<br />

repräsentativen Konferenzräumen<br />

machen die L-VIS<br />

Touch Panels eine gute Figur.<br />

Die geringe Einbautiefe<br />

und eine geringe Verlustleistung<br />

(Abwärme) erlauben<br />

eine Montage an jedem weiteren<br />

Ort.<br />

Integration in<br />

ein Ethernet/IP Netzwerk<br />

Beliebige Informationen<br />

aus einem <strong>BACnet</strong>-Netzwerk<br />

lassen sich darstellen<br />

und bedienen. Binary-, Analog-<br />

oder Multi-State-Objekte<br />

(Ein- und Ausgänge)<br />

bilden hierbei die Schnittstelle<br />

zum <strong>BACnet</strong>-Netzwerk.<br />

LVIS-ME212 (12”,<br />

800x600) und LVIS-ME215<br />

(15”, <strong>10</strong>24x768) können<br />

entweder am <strong>BACnet</strong> MS/TP<br />

oder am <strong>BACnet</strong>/IP (Ethernet/IP)<br />

Kanal eingesetzt wer-<br />

den. Die Integration in ein<br />

Ethernet/IP Netzwerk wird<br />

durch zwei Ethernet-Anschlüsse<br />

erleichtert, die ein<br />

Durchschleifen von Ethernetverbindungen<br />

mittels integriertem<br />

Switch erlauben.<br />

Optional können die Panels<br />

auch drahtlos im IP-Netzwerk<br />

kommunizieren.<br />

Ein eingebauter VNC-Server<br />

bietet PCs oder mobilen Geräten<br />

mit installiertem VNC-Client<br />

Fernzugriffsmöglich keiten<br />

über eine TCP/IP-Verbindung.<br />

Ein integrierter Webserver<br />

dient zur Gerätekonfiguration<br />

und zum<br />

Datenpunkt-Monitoring.<br />

Zeitschaltprogramme laufen<br />

lokal auf den Panels und sind<br />

über Fernzugriff konfigurierbar.<br />

Alarmzustände werden<br />

protokolliert. Trendkurven<br />

werden dargestellt. Alarme<br />

und Trenddaten können<br />

lokal gespeichert (CSV-Datei)<br />

und via E-Mail an eine zentrale<br />

Datenbank (LWEB-801)<br />

übermittelt werden. Per<br />

E-Mail wird ereignisabhängig<br />

über den Betriebsstatus<br />

oder Störungen informiert.<br />

LVIS touch panels allow this<br />

Loytec stellt neue L-VIS Produktlinie vor.<br />

Loytec presents the new L-VIS product-line.<br />

visualization of HVAC automation<br />

systems for local operations<br />

in a clear manner.<br />

LVIS is a graphical interface<br />

solution in a building automation<br />

system which avoids<br />

the use of PC hardware. The<br />

L-VIS Touch Panel can be<br />

the user interface for individual<br />

rooms or larger areas.<br />

The small installation depth<br />

and the low thermal power<br />

loss allow an installation in<br />

most locations.<br />

Any information from a<br />

<strong>BACnet</strong> network can be displayed<br />

or controlled by the<br />

touch panels. Binary, analog,<br />

or multi-state objects (input,<br />

output, value) represent the<br />

interface to the <strong>BACnet</strong> network.<br />

Integration in<br />

an Ethernet/IP network<br />

The L-VIS can be connected<br />

to a <strong>BACnet</strong> MS/TP or a<br />

<strong>BACnet</strong>/IP (Ethernet) channel.<br />

The integration in an<br />

IP network is made easy by<br />

two Ethernet ports for de-<br />

Produkte Products<br />

vice daisy-chaining with an<br />

integrated Ethernet switch.<br />

Alternatively, the panels can<br />

communicate wireless in an<br />

IP-Network.<br />

An embedded VNC-Server<br />

allows remote access via an<br />

IP connection for PCs and<br />

mobile devices with a VNC-<br />

Client installed. Further<br />

more, an embedded Web<br />

server allows device configuration<br />

and data point listing.<br />

The LVIS contains scheduling<br />

access both local and remote.<br />

Alarms are recorded. Trend<br />

graphs are displayed. Alarms<br />

and trend data are stored locally<br />

(CSV file) and sent via<br />

E-mail to a central database<br />

(LWEB-801). Event driven<br />

E-mail notifications inform<br />

about operating states and<br />

alarm conditions.<br />

LOYTEC electronics GmbH<br />

info@loytec.com<br />

www.loytec.com<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

41


Produkte Products<br />

Produkte zur einfachen <strong>BACnet</strong> Integration<br />

Products for Easy <strong>BACnet</strong> Integration<br />

Die MBS GmbH aus Krefeld rundet ihre Produktlinie<br />

von <strong>BACnet</strong>-Infrastrukturkomponenten ab. Die neue<br />

Serie Universal-Gateways/Compact ermöglicht die<br />

unkomplizierte und schnelle Aufschaltung und Integration<br />

von Anlagenteilen.<br />

The company MBS from Krefeld, Germany completes its<br />

productline of <strong>BACnet</strong> infrastructure components. The<br />

new series of Universal-Gateways/Compact allows the<br />

uncomplicated and fast integration of plant components.<br />

Für die Integration von<br />

Nicht-<strong>BACnet</strong> Gewerken an<br />

<strong>BACnet</strong>-Netzwerke steht die<br />

Serie Universal-Gateways/<br />

Compact zur Verfügung.<br />

Mit mehr als 60 verschiedenenKommunikationsprotokollen<br />

bieten diese Produkte<br />

die Möglichkeit der<br />

Aufschaltung und der Integration<br />

von Anlagenteilen,<br />

die bisher nur mit Hilfe von<br />

potenzialfreien Kontakten<br />

oder 0-<strong>10</strong>V Ein-/Ausgängen<br />

aufgeschaltet und daher nur<br />

mit hohem Aufwand und<br />

Kosten integrierbar waren.<br />

Die seit mehr als zehn Jahren<br />

erfolgreich eingesetzten<br />

Universal-Gateways in der<br />

Schaltschrankbauform, als<br />

Industrie-PC sowie in 19“<br />

Einschubtechnik sind selbstverständlich<br />

weiter verfügbar.<br />

Die Gateways erfüllen das<br />

Geräteprofil B-AAC und erlauben<br />

eine zuverlässige<br />

Verarbeitung von bis zu 250<br />

<strong>BACnet</strong>-Objekten.<br />

Zur Kopplung von <strong>BACnet</strong>/<br />

IP, Ethernet und MS/TP Netzwerken<br />

stehen die Router der<br />

Serie Universal-<strong>BACnet</strong> Router<br />

zur Verfügung.<br />

Mit Hilfe des integrierten<br />

Webinterfaces wird die Konfiguration<br />

zum Kinderspiel,<br />

als besondere Funktion stehen<br />

insgesamt 200MB zur<br />

Ablage eigener Dokumente<br />

bereit, die über den Webserver<br />

erreichbar sind.<br />

I/O-Module<br />

Für die Aufschaltung und Integration<br />

von digitalen oder<br />

analogen Eingangssignalen<br />

sowie für die Realisierung<br />

von Schaltfunktionen als digitaler<br />

Ausgang stehen die<br />

<strong>BACnet</strong> I/O Module bereit.<br />

Die digitalen Signale werden<br />

durch eine LED pro Kanal<br />

zusätzlich optisch angezeigt,<br />

eine Handbedienebene<br />

für die Schaltausgänge gehört<br />

ebenfalls zur Standardausstattung.<br />

To integrate non-<strong>BACnet</strong><br />

plant components to <strong>BACnet</strong><br />

networks the series of<br />

Universal-Gateways/Compact<br />

allows connectivity as<br />

a universal protocol transla-<br />

tor. More than 60 communications<br />

protocols are ready<br />

to be used to combine <strong>BACnet</strong><br />

networks with devices<br />

which formerly required<br />

integration by connecting<br />

them over wired contacts or<br />

0-<strong>10</strong>V I/O, which was often<br />

complex and expensive.<br />

The series of Universal-<br />

Gateways as cabinetcontrollers,<br />

industry PCs and 19"<br />

rack-mount devices are continued<br />

as integration products<br />

as well.<br />

The gateways support the<br />

B-AAC device profile and<br />

allow highly reliable processing<br />

of up to 250 <strong>BACnet</strong><br />

objects.<br />

Router<br />

To connect <strong>BACnet</strong>/IP, Ethernet<br />

and MS/TP networks,<br />

the UBR-01 links these media<br />

to form a single <strong>BACnet</strong>internetwork.<br />

Using the integrated webserver<br />

makes the configuration<br />

process extremely simple.<br />

As a unique feature, a<br />

memory space of 200MB<br />

may be used to store project<br />

documentation directly on<br />

the device, accessible using<br />

the web server.<br />

I/O-Modules<br />

To integrate digital or analog<br />

input signals without<br />

any controls function, or to<br />

realize digital output switching<br />

functions, the series of<br />

<strong>BACnet</strong> I/O modules can be<br />

used for integration jobs.<br />

The digital signals are locally<br />

displayed with a signal<br />

LED per channel, a manual<br />

override operation for digital<br />

output is integrated as a<br />

standard function as well.<br />

MBS GmbH<br />

info@mbs-software.de<br />

www.mbs-software.de<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

43


Produkte Products<br />

Steigerung der Energieeffizienz<br />

durch novaPro Open<br />

Increasing Energy Efficiency<br />

With the Aid of novaPro Open<br />

Die Software novaPro Open aus dem Hause Sauter<br />

ermöglicht ein vollständiges und internetbasiertes<br />

Gebäudemanagement. novaPro Open ist eine vollständige<br />

Implementation einer <strong>BACnet</strong>-Operation Workstation<br />

(B-OWS).<br />

The software novaPro Open by Sauter allows a complete<br />

and internet-based building management. novaPro Open<br />

is the complete implementation of a <strong>BACnet</strong> Operating<br />

Workstation (B-OWS).<br />

SAUTER novaPro Open ist<br />

die vollständige, internetbasierteGebäudemanagementlösung<br />

für Betrieb,<br />

Überwachung und Steuerung.<br />

Die neueste Version<br />

der Software bedeutet für<br />

den Anwender weniger Konfigurationsaufwand,<br />

eine<br />

komfortable Inbetriebnahme<br />

und einheitliche Bedienoberfläche<br />

sowohl unter Windows<br />

wie auch via Standard<br />

Web-Browser. Bei novaPro<br />

Open handelt es sich um eine<br />

vollständige Implementation<br />

einer <strong>BACnet</strong>-Operating<br />

Workstation (B-OWS).<br />

Der native <strong>BACnet</strong>-Treiber<br />

ermöglicht die direkte Einbindung<br />

an ein <strong>BACnet</strong>-Netzwerk.<br />

Ein besonderes Highlight<br />

ist der Object-Browser.<br />

Dieser gestattet dem Anwender<br />

einen sofortigen Zugriff<br />

auf alle Automationsstationen<br />

und die Übersicht aller<br />

verbundenen Objekte und<br />

deren Eigenschaften.<br />

<strong>BACnet</strong> Alarm Routing<br />

Eine wertvolle Eigenschaft<br />

ist auch das <strong>BACnet</strong> Alarm<br />

Routing: Alle <strong>BACnet</strong>-<br />

Alarme aus den Automationsstationen<br />

werden ohne<br />

Konvertierung direkt in<br />

44<br />

der Alarmliste dargestellt;<br />

dies zusammen mit Alarmen<br />

anderer Kommunikationsprotokolle.<br />

Es erfolgt eine<br />

durchgehende Alarmier ung<br />

von der Automations- bis<br />

hin zur Management ebene.<br />

Trend Objects sorgen für<br />

die Aufzeichnung, das Auslesen,<br />

Archivieren und die<br />

Darstellung der Daten entweder<br />

im Online- oder im<br />

historischen Modus. Mit Hilfe<br />

des Web-Browsers können<br />

Schedule- und Calendar-Objekte<br />

erstellt und parametriert<br />

werden. Der Benutzer<br />

konfiguriert die Zeitschaltbefehle<br />

somit direkt im <strong>BACnet</strong><br />

Schedule- bzw. Calendar-<br />

Object. Eine Besonderheit<br />

stellt die integrierte Symbolbibliothek<br />

(Cluster) dar. Sie<br />

visualisiert die <strong>BACnet</strong>-Eigenschaften<br />

und erlaubt dem<br />

Benutzer die Bedienung ohne<br />

spezifische <strong>BACnet</strong>-Kenntnisse.<br />

SAUTER novaPro Open is<br />

a complete, internet-based<br />

building management solution<br />

for operation, monitoring<br />

and control. For the user,<br />

the latest version of the software<br />

means less time spent<br />

on configuration, easier com-<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Vertikale und horizontale Systemintegration<br />

ohne Grenzen: für ein individuelles System.<br />

Vertical and horizontal system integration<br />

with no limits: for an individualized system.<br />

missioning and a uniform<br />

user interface, using either<br />

Windows or a standard web<br />

browser. SAUTER’s novaPro<br />

Open is the complete implementation<br />

of a <strong>BACnet</strong> Operating<br />

Workstation (B-OWS).<br />

The native <strong>BACnet</strong> driver enables<br />

direct integration to a<br />

<strong>BACnet</strong> network. A special<br />

highlight is the object browser,<br />

which provides the user<br />

with immediate access to all<br />

automation stations and an<br />

overview of all the linked objects<br />

and their properties.<br />

<strong>BACnet</strong> alarm routing<br />

Another valuable feature is<br />

<strong>BACnet</strong> alarm routing: all<br />

<strong>BACnet</strong> alarms from the automation<br />

stations are presented,<br />

without conversion,<br />

directly in the alarm list; this<br />

includes the alarms of other<br />

communication protocols.<br />

There is continuous notifica-<br />

tion from the automation level<br />

up to the management level.<br />

Trend objects provide for the<br />

recording, retrieving, archiving<br />

and presentation of data<br />

in either online or historical<br />

mode. Schedule and calendar<br />

objects can be created and parameterised<br />

with the aid of<br />

the web browser. Therefore,<br />

the user configures the timeswitch<br />

commands directly inside<br />

the <strong>BACnet</strong> schedule or<br />

calendar object. One special<br />

feature is the integrated symbol<br />

library (cluster), which<br />

visualises the <strong>BACnet</strong> properties<br />

and enables the user to<br />

operate the system without<br />

having any specific knowledge<br />

of <strong>BACnet</strong>.<br />

Fr. Sauter AG<br />

peter.schoenenberger@ch.<br />

sauter-bc.com<br />

www.sauter-controls.com


Produkte Products<br />

Universeller Dolmetscher<br />

und mehr für <strong>BACnet</strong><br />

Universal Translators and more for <strong>BACnet</strong><br />

Der JACE (Java Application Control Engine) ist eine flexible<br />

web-basierte Gatewayplattform auf Basis Power PC und<br />

QNX für Anwendungen in der Gebäudeautomation.<br />

Tridium´s JACE (Java Application Control Engine) is a<br />

flexible, web-based gateway platform using a Power PC<br />

under QNX for applications in building automation.<br />

Mit dem Treibermodell der<br />

NiagaraAX-Plattform von Tridium<br />

stellt der JACE standardmäßig<br />

folgende offene<br />

Protokollschnittstellen zur Verfügung:<br />

<strong>BACnet</strong>/IP und MS/TP<br />

LON-TP/FT<strong>10</strong> (über LON-<br />

Schnittestellenmodul) und<br />

LON–IP852<br />

EIBnet (per EIB-Router<br />

kann auch KNX aufgeschaltet<br />

werden)<br />

MODBUS/IP und RTU<br />

M-BUS<br />

oBIX<br />

Mit dem Serial-Flex-Treiber,<br />

einem universellen frei konfigurierbaren<br />

seriellen Treiber, lässt<br />

sich der JACE auch für andere<br />

serielle Protokolle anpassen.<br />

Ein Entwicklungs-Kit für kundenspezifisch<br />

JAVA-Treiber ist<br />

verfügbar.<br />

Je nach Leistungsanforderungen<br />

unterstützen die Varianten<br />

JACE-200 und JACE-600<br />

eine unterschiedliche Anzahl<br />

von Protokollen und Datenpunkten.<br />

Die IP-Adressierung<br />

ist für IPv6 ausgelegt.<br />

Der Zugriff auf den JACE als<br />

Gateway erfolgt über die im<br />

JACE integrierte Management-<br />

Software „WorkplaceAX“ via<br />

Web-Browser. Zusätzliche PC-<br />

Konfigurationstools sind nicht<br />

nötig. Steht eine installierte Sun<br />

Java-Virtual-Machine (JVM)<br />

zur Verfügung, so ist eine besonders<br />

komfortable Nutzung<br />

möglich.<br />

Abstraktion<br />

der Datenmodelle<br />

Zentrales Element in den Protokolltreibern<br />

ist die Abstraktion<br />

der unterschiedlichen Datenmodelle<br />

in eine normalisierte<br />

Form (Proxy Points), die auf<br />

den Datentypen numerischer<br />

Wert, Wahrheitswert, Aufzählung<br />

und Text basiert. Datenpunkte<br />

besitzen zusätzlich die<br />

Eigenschaften Nur-Lesen oder<br />

Lesen + Schreiben und können<br />

durch Anfügen sogenannter Facetten<br />

beliebig skaliert werden<br />

(z.B. °F in °C umwandeln). Im<br />

NiagaraAX-Framework wurde<br />

großer Wert auf eine verlustlose<br />

Abstraktion der Datenmodelle<br />

gelegt, so dass sich alle Datenpunkte<br />

eines Protokolls vollständig<br />

auf die eines anderen<br />

Protokolls umsetzen lassen. Das<br />

ist die entscheidende Voraussetzung<br />

für die Nutzung des JACE<br />

als universelles Gateway.<br />

Zusätzlich verfügt der JACE<br />

über alle Funktionen, um ihn zu<br />

einem kompletten frei programmierbaren<br />

dezentralen Systemmanager<br />

zu erweitern. Zeitsteuerung<br />

(Calendar, Schedule),<br />

Trendaufzeichnung (History),<br />

Alarm-Handling, ein ausgefeiltes<br />

Benutzermanagement sowie<br />

das in den Protokolltreibern<br />

integrierte Geräte-Management<br />

(z.B. <strong>BACnet</strong>-Server-Konfiguration<br />

im JACE) und die umfangreichen<br />

grafischen Visualisierungsmöglichkeiten<br />

erlauben<br />

es, aus dem Gateway einen leistungsstarken,<br />

interoperablen<br />

Multiprotokoll-Automations-<br />

server zu machen. JACE ist somit<br />

die leistungsfähige und<br />

anwendungsfreundliche Alternative<br />

zu anderen Gatewaylösungen.<br />

With the driver model of<br />

Tridium´s NiagaraAX platform,<br />

the JACE provides the<br />

following open protocol interfaces<br />

by default:<br />

<strong>BACnet</strong>/IP and MS/TP<br />

LON-TP/FT-<strong>10</strong> (via LON<br />

interface module) and LON–<br />

IP852<br />

EIBnet (KNX can be connected<br />

via EIB router)<br />

MODBUS/IP and RTU<br />

M-BUS<br />

oBIX<br />

A development kit for programming<br />

customer specific Java<br />

drivers is available.<br />

Covering different performance<br />

requirements, the models<br />

JACE-200 and JACE-600 support<br />

a different number of protocols<br />

and data points. The IP<br />

addressing supports IPv6.<br />

The JACE is accessed as a gateway<br />

by the built-in management<br />

software “WorkplaceAX” via<br />

any standard web browser. Additional<br />

PC tools are not necessary.<br />

An installed Sun Java-Virtual-Machine<br />

(JVM) allows for<br />

especially easy operation.<br />

Abstraction of data models<br />

A key element of the protocol<br />

drivers is the abstraction of dif-<br />

Der Java Application Control<br />

Engine JACE -200 von Tridium<br />

The Java Application Control<br />

Engine JACE-200 by Tridium<br />

ferent data models into a normalized<br />

form (proxy points),<br />

which is based upon the data<br />

type’s numerical value, boolean<br />

value, enumeration and text.<br />

Data points have the additional<br />

properties of read-only or readwrite,<br />

and can be freely scaled<br />

by attaching so-called facets<br />

(for instance to convert °F to<br />

°C). In the NiagaraAX framework<br />

great emphasis has been<br />

placed on a lossless abstraction<br />

of the data models, which<br />

allows conversation of convert<br />

all data points of one protocol<br />

completely to those of another<br />

protocol. This is the crucial precondition<br />

for using the JACE as<br />

universal gateway.<br />

Additionally, the JACE has all<br />

functions to extend it to a complete,<br />

freely programmable, distributed<br />

system manager. Time<br />

control (calendar, schedule),<br />

trend logging (history), alarm<br />

handling, a sophisticated user<br />

management, as well as device<br />

management which is integrated<br />

in the protocol drivers (i.e.<br />

<strong>BACnet</strong> server configuration in<br />

the JACE), and extensive options<br />

of graphical visualization<br />

allow this gateway to turn into<br />

a powerful, interoperable, multi-protocol<br />

automation server.<br />

JACE is therefore the powerful<br />

and user-friendly alternative to<br />

other gateway solutions.<br />

Sysmik<br />

www.sysmik.de<br />

service@sysmik.de<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

45


Mit uns überzeugen Sie Ihre Kunden.<br />

Egal wo. Weltweit.<br />

MarDirect spricht die Sprachen Ihrer Kunden.<br />

Um technologische Produkte und Dienstleistungen<br />

zu bewerben, muss man sie verstehen.<br />

Unsere Mitarbeiter bringen diese Qualifi kation mit.<br />

Sie verfügen über technologisches Know-how<br />

in Automation, Software sowie technischer<br />

Kommunikation und verbinden diese mit Expertenwissen<br />

in Marketing, Öffentlichkeitsarbeit sowie<br />

Messe- und Kongressorganisation.<br />

Muttersprachler aus vielen Ländern Europas,<br />

USA und China sorgen dafür,<br />

dass man Ihre Technologie weltweit versteht.<br />

Möchten Sie international aktiv werden?<br />

Sprechen Sie mit uns,<br />

wir lassen uns an Ihrem Erfolg messen.<br />

MarDirect<br />

Marketing Direct GbR<br />

Droste-Hülshoff-Str. 1<br />

44141 Dortmund<br />

Tel. + 49 231 / 42 78 67-31<br />

Fax + 49 231 / 42 78 67-32<br />

info@mardirect.de<br />

www.mardirect.de<br />

promote<br />

your technology<br />

Persuade your customers with us.<br />

Globally no matter where.<br />

MarDirect speaks your customers’ languages.<br />

One must understand technological products and<br />

services in order to promote them.<br />

Our employees are equipped with these skills.<br />

They have technological know-how in<br />

automation, software and technical communications,<br />

and they connect them with expertise in<br />

marketing, public relations as well as trade fair<br />

and congress organization.<br />

Native speakers from many countries in <strong>Europe</strong>,<br />

the USA and China ensure that your technology is<br />

understood around the world.<br />

Do you want to become an international player?<br />

Talk to us. We measure ourselves by your success.


Produkte Products<br />

Technische Symbiose in der Gebäudeautomation<br />

– <strong>BACnet</strong> und EnOcean verbinden<br />

Technical Symbiosis in the Building Automation<br />

– conjoin <strong>BACnet</strong> with EnOcean<br />

Warum nur eine der zahlreichen Netzwerktechnologien in<br />

der Gebäudeautomation nutzen? Thermokon kombiniert<br />

mit dem neuen <strong>BACnet</strong>-EnOcean-Gateway SRC65-<br />

<strong>BACnet</strong> zwei etablierte Netzwerktechnologien, um<br />

energieeffiziente, umweltfreundliche „Green Buildings“ zu<br />

ermöglichen.<br />

Why only using one of the numerous network technologies<br />

in the building automation? By means of the new <strong>BACnet</strong><br />

EnOcean gateway SRC65-<strong>BACnet</strong> Thermokon combines<br />

two established network technologies to enable energyefficient<br />

and environmentally friendly “green buildings”.<br />

Bei der Entwicklung im Hause<br />

Thermokon wurde großer<br />

Wert auf die Einhaltung der<br />

<strong>BACnet</strong>-Standards gelegt. Dies<br />

gewährleistet eine einwandfreie<br />

Interoperabilität und bereits<br />

existierende Projekte<br />

sind mühelos erweiterbar. Der<br />

SRC65-<strong>BACnet</strong> fungiert als<br />

Gateway zwischen der drahtlosen<br />

LowPower-Technologie<br />

aus dem Hause EnOcean und<br />

<strong>BACnet</strong>.<br />

Die Funktion des Gerätes umfasst<br />

einen Funkempfänger für<br />

EnOcean Funktelegramme<br />

und wird stets gemeinsam mit<br />

anderen <strong>BACnet</strong>-Automationsstationen<br />

betrieben. Alle<br />

Parametrier- und Konfigurationseinstellungen<br />

sind über das<br />

<strong>BACnet</strong>-Netzwerk möglich.<br />

Anschluss an Automationsstationen<br />

oder GLTs<br />

Das verwendete und international<br />

standardisierte <strong>BACnet</strong><br />

MS/TP Protokoll ermöglicht<br />

den Anschluss an Automationsstationen<br />

oder GLTs. Die<br />

Baudrate ist frei wählbar und<br />

über DIP-Schalter einstellbar.<br />

Als Schnittstelle auf Bus-Seite<br />

dient der RS485-Standard.<br />

Die maximale Anzahl an<br />

Busteilnehmern wird durch<br />

den verwendeten RS485<br />

Transceiver vorgegeben und<br />

ermöglicht 128 Geräte pro<br />

Segment. Die Adressierung<br />

der Geräte zur Identifikation<br />

im Netzwerk erfolgt ebenfalls<br />

über DIP-Schalter und wird<br />

jedem Gerät individuell vergeben.<br />

Das Gateway arbeitet mit<br />

dem Geräteprofil B-ASC und<br />

stellt eine Vielzahl an BIBBs<br />

zur Verfügung.<br />

Es lassen sich bis zu 32 En-<br />

Ocean-basierte Geräte einlernen<br />

und verwenden. Nach<br />

dem erfolgreichen „Bekanntmachen“<br />

von Sensoren und<br />

SRC65-<strong>BACnet</strong> ist unmittelbar<br />

ein kombiniertes Arbeiten<br />

mit beiden Netzwerktechnologien<br />

möglich.<br />

During the indoor development<br />

at Thermokon great<br />

importance was given to the<br />

compliance with the <strong>BACnet</strong><br />

standards, thus, guaranteeing<br />

a smooth interoperability as<br />

well as an easy modification of<br />

already existing projects. The<br />

SRC65-<strong>BACnet</strong> is designed as<br />

Der SRC65-<strong>BACnet</strong> fungiert als Gateway zwischen<br />

der drahtlosen EnOcean-Technologie und <strong>BACnet</strong>.<br />

The SRC65-<strong>BACnet</strong> act as a gateway between the<br />

wireless EnOcean-technology and <strong>BACnet</strong>.<br />

a gateway between the wireless<br />

LowPower-technology by<br />

EncOcean and <strong>BACnet</strong>.<br />

The function of the SRC65-<br />

<strong>BACnet</strong> includes a radio receiver<br />

for EnOcean radio telegrams<br />

and is always operated<br />

with other <strong>BACnet</strong> automation<br />

systems or control technologies,<br />

such as <strong>BACnet</strong> operating<br />

work stations. All parameterization<br />

and configuration<br />

properties can be set over<br />

the <strong>BACnet</strong> network.<br />

Connection to automation<br />

stations or BMS<br />

The used protocol is the international<br />

standardized <strong>BACnet</strong><br />

MS/TP enabling the connection<br />

to automation stations<br />

or BMS. The baud rate is arbitrarily<br />

and adjustable via a<br />

DIP switch. The RS485 standard<br />

works as an interface on<br />

the bus side. The maximum<br />

number of bus sharing units<br />

is preset by the RS485 trans-<br />

ceiver and enables 128 devices<br />

per bus segment. The addressing<br />

of the devices for the identification<br />

in the network is also<br />

realized with a DIP-switch<br />

and is individually assigned to<br />

each device.<br />

The gateway works with the<br />

device profile <strong>BACnet</strong> Application<br />

Specific Controller (B-<br />

ASC) which offers a multiplicity<br />

of the BIBBs described<br />

above. It is possible to seamlessly<br />

connect and to use up<br />

to 32 EnOcean based devices.<br />

After a successful “learningin”<br />

procedure of the sensors<br />

to the<br />

SRC65-<strong>BACnet</strong>, a combined<br />

operation with both network<br />

technologies is possible immediately.<br />

THERMOKON<br />

Sensortechnik GmbH<br />

www.thermokon.de<br />

email@thermokon.de<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

47


<strong>BACnet</strong> Interest Group<br />

<strong>BACnet</strong> in Multivendor-Systemen –<br />

Plugfest in Helsinki war ein Erfolg<br />

<strong>BACnet</strong> in Multivendor Systems –<br />

20<strong>09</strong> Plugfest Event Deemed a Success<br />

Im April 20<strong>09</strong> organisierte ABB den vierten BIG-EU Interoperabilitäts-Workshop,<br />

bekannt auch als Plugfest, in seiner Niedrigspannung Antriebsfabrik in Helsinki,<br />

Finnland. Dreißig internationale Anbieter von <strong>BACnet</strong>-Geräten nahmen an<br />

diesem Event teil, mit dem Ziel individuelle Produkte und neue Funktionalitäten<br />

miteinander in Multivendor-Systemen zu testen.<br />

In April 20<strong>09</strong>, ABB organized the 4th BIG-EU Interoperability Workshop at its low<br />

voltage AC drives factory in Helsinki, Finland. About 30 global vendors and suppliers<br />

of <strong>BACnet</strong> devices attended the event with the aim of testing individual products<br />

and new functionalities with each other in multivendor systems.<br />

“Die Veranstaltung war ein<br />

voller Erfolg“, so Teemu T.<br />

Heikkila von ABB. „Vertreten<br />

waren 16 führende<br />

<strong>BACnet</strong> Anbieter aus Europa,<br />

den USA und Kanada<br />

nebst 33 Entwicklern aus der<br />

ganzen Welt, von Australien,<br />

über die USA bis hin nach Indien<br />

und Finnland.“<br />

Das Highlight der Veranstaltung<br />

war das Testen der neuesten<br />

Produkte in System-<br />

Sessions, wobei alle Anbieter<br />

und die meisten ihrer Geräte<br />

miteinander in einem <strong>BACnet</strong><br />

System verbunden waren.<br />

Das „RoundTable Testing“<br />

gibt allen Unternehmen die<br />

Möglichkeit einen zielgerichteten<br />

Test durchzuführen,<br />

wie etwa das Sub-Netzwerk<br />

Testing oder das MS/<br />

TP Interoperabilitäts Testing.<br />

„Die Idee von <strong>BACnet</strong> ist es,<br />

mehrere Gebäude im gleichen<br />

System zu vereinen. Dies<br />

können aktuell bis zu 4,2<br />

Millionen Geräte sein. Jedes<br />

Gebäude hat für gewöhnlich<br />

sein eigenes Netzwerk, das<br />

von oben betrachtet als Sub-<br />

Netzwerk angesehen wird, so<br />

wie das MS/TP ein Sub-Netzwerk<br />

von <strong>BACnet</strong>/IP ist“, erklärt<br />

Teemu T. Heikkila.<br />

Ein neues Konzept bei den<br />

diesjährigen Meetings war<br />

die Nutzung von Tischen auf<br />

Rollen, so konnte sich jeder<br />

48<br />

Teilnehmer frei zwischen<br />

zwei Test-Sessions bewegen,<br />

ohne Werkzeuge zur Trennung<br />

der Geräte verwenden<br />

zu müssen.<br />

Die <strong>BACnet</strong>-Schnellstraße<br />

„Wir haben eine <strong>BACnet</strong>-<br />

,Schnellstraße‘ gebaut, mit<br />

Tischen an der linken und<br />

rechten Raum seite und mit<br />

Anwendern, die mit ihren Tischen<br />

in vorgegebener Richtung<br />

um diese <strong>BACnet</strong>-Straße<br />

herumliefen”, berichtet<br />

Frank Schubert von der MBS<br />

GmbH, Krefeld. „Bei den<br />

vorangegangenen Plugfests<br />

saßen wir an ,festen‘ Tischen<br />

und mussten die Geräte abklemmen.<br />

Nun klemmen wir<br />

einfach die Controller ab,<br />

dies verursacht lediglich eine<br />

geringe Betriebsstörung<br />

und es steht mehr Zeit zum<br />

Testen zur Verfügung. Wir<br />

müssen dieses Format für<br />

weitere Veranstaltungen adaptieren.“<br />

Der letzte “All in” Test, bei<br />

dem die Geräte aller Anbieter<br />

miteinander verbunden<br />

sind und Informationen<br />

über die Zusammenarbeit<br />

der verschiedenen Geräte<br />

austauschen, wurde von den<br />

Vertretern als „gut funktionierend“<br />

beschrieben.<br />

Die Veranstaltung wurde<br />

von Panu Virolainen, dem<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Vize-Präsident Technologie<br />

der ABB Niedrigspannung<br />

Antriebsfabrik, eröffnet.<br />

Dabei hob er die Wichtigkeit<br />

von <strong>BACnet</strong> für ABB´s Niedrigspannung<br />

Antriebsgeräte,<br />

die in HVAC-Systemen im<br />

Gebäudesektor verwendet<br />

werden, hervor.<br />

„<strong>BACnet</strong> wächst schnell“,<br />

sagt Virolainen, „dank dem<br />

exzellenten zugrundeliegenden<br />

Produkt, der internationalen<br />

Förderung von<br />

<strong>BACnet</strong> durch die BIG-EU<br />

und durch den enormen<br />

Marketingaufwand durch<br />

Newsletter, Kampagnen<br />

und Ausstellungen wie der<br />

Light&Building. Dies ist definitiv<br />

eine große Chance für<br />

uns alle.“<br />

Mit <strong>BACnet</strong> in die Zukunft<br />

Während des Meetings umriss<br />

Bill Swan von Alerton<br />

die ambitionierte Zukunftsrichtung<br />

von <strong>BACnet</strong>,<br />

die sich allein daran ablesen<br />

lässt, dass derzeit etwa<br />

120 Änderungsanträge in<br />

der Warteschlange sind. Der<br />

Umfang der Arbeit spiegelt<br />

sich in der Anzahl der aktiven<br />

Working-Groups, welche<br />

unter anderem Licht-Anwendungen,<br />

Sicherheit und<br />

Schutz, MS/TP LAN oder<br />

serielle Kommunikation, Integration<br />

und XML-Anwendungen<br />

beinhaltet.<br />

BIG-EU Plugfest Helsinki 20<strong>09</strong><br />

Andere Anwendungen, die<br />

derzeit für <strong>BACnet</strong> studiert<br />

werden, u.a. CCTV zu überwachen.<br />

Um diese und die<br />

Gebäude-Energieversorger<br />

mit <strong>BACnet</strong> zu integrieren,<br />

finden aktive Gespräche zwischen<br />

den Versorgungsunternehmen<br />

der USA und dem<br />

<strong>BACnet</strong> Komitee statt.<br />

Darüber hinaus stellte Frank<br />

Schubert von der MBS<br />

GmbH die Neuigkeiten des<br />

nächsten BTL Testplaners<br />

vor, der im Sommer 20<strong>09</strong><br />

veröffentlicht wurde. Er umfasst<br />

auch Tests und Profile<br />

von Workstations, Advanced<br />

Workstations, Life Safety<br />

Workstations, Operator<br />

Workstations und Operator<br />

Displays.<br />

“The event went very well,”<br />

says Teemu T. Heikkila of<br />

ABB. “There were 16 lead-


ing <strong>BACnet</strong> vendors from <strong>Europe</strong>,<br />

US and Canada along<br />

with 33 developers from Australia<br />

to the US and India to<br />

Finland.”<br />

The highlight of the event<br />

was testing the latest products<br />

in system sessions where<br />

all vendors and most of their<br />

devices were connected together<br />

within the same <strong>BACnet</strong><br />

system. Round table testing<br />

gave all the companies the<br />

opportunity to do some specific<br />

testing, like sub-network<br />

testing or MS/TP interoperability<br />

testing. “The idea of<br />

<strong>BACnet</strong> is to combine multiple<br />

buildings to the same system,<br />

which actually can be up<br />

to almost 4.2 million devices.<br />

Each building usually has its<br />

own network, which is seen<br />

as a sub-network from the<br />

top, in such as way that MS/<br />

TP is a sub-network to <strong>BACnet</strong>/IP,”<br />

explains Heikkila.<br />

A new concept at this year’s<br />

meeting was the use of<br />

Plugfest tables, or stations,<br />

with wheels, so that each<br />

participant could move freely<br />

between each test session<br />

without having to use tools<br />

to disconnect devices.<br />

The <strong>BACnet</strong> highway<br />

“This created a <strong>BACnet</strong> highway,<br />

with tables down the<br />

left and right side of the room<br />

and with users travelling with<br />

their table along the highway,<br />

in an agreed direction to<br />

the next session,” says Frank<br />

Schubert from MBS GmbH.<br />

“Previously we used permanent<br />

tables and had to disconnect<br />

devices. Now we simply<br />

disconnect the controllers and<br />

as laptops use batteries, there<br />

is minimal disruption, while<br />

maximizing time. We need to<br />

adopt this format for future<br />

Plugfest events.”<br />

The last “all in” test was described<br />

by delegates as “going<br />

very well,” with all devices<br />

and vendors connected<br />

together and sharing valuable<br />

information about how each<br />

other’s devices work together.<br />

The event was opened by<br />

Panu Virolainen, Vice President,<br />

Technology, of ABB’s<br />

low voltage AC drives business,<br />

who highlighted the<br />

importance of <strong>BACnet</strong> for<br />

ABB’s low voltage AC drives<br />

used in HVAC systems<br />

within the building sector.<br />

“<strong>BACnet</strong> is growing fast,”<br />

Virolainen said, “thanks to<br />

an excellent underlying product,<br />

BIG-EU’s promotion of<br />

<strong>BACnet</strong> globally; and the<br />

enormous marketing efforts<br />

through newsletters, campaigns<br />

and exhibitions like<br />

Light & Building. This is definitely<br />

a big opportunity for all<br />

of us.”<br />

The future with <strong>BACnet</strong><br />

During the meeting Bill Swan<br />

of Alerton outlined the ambitious<br />

future direction of<br />

<strong>BACnet</strong>, indicating that some<br />

120 change proposals are in<br />

the pipeline. The extent of<br />

the work is reflected in the<br />

number of active working<br />

groups which include lighting<br />

applications, safety and secu-<br />

<strong>BACnet</strong> Interest Group<br />

rity, MS/TP LAN and serial<br />

communications, utilities integration<br />

and XML applications.<br />

Other applications being<br />

studied for <strong>BACnet</strong> include<br />

CCTV monitoring, with<br />

proposals already submitted<br />

from China and Germany;<br />

elevator monitoring, where<br />

Hong Kong is planning to<br />

monitor the alarms and status<br />

of thousands of elevators;<br />

and building energy utility<br />

integration within <strong>BACnet</strong>,<br />

with active discussions<br />

taking place between the<br />

US utilities and the <strong>BACnet</strong><br />

committee.<br />

Meanwhile Frank Schubert<br />

of MBS GmbH outlined<br />

what was new in the<br />

next BTL test plan which<br />

was released in the summer<br />

of 20<strong>09</strong> including workstation<br />

tests and profiles such as<br />

advanced workstation, lifesafety<br />

workstation, operator<br />

workstation and operator<br />

display.


<strong>BACnet</strong> Interest Group<br />

Mit intelligenter Gebäudetechnik<br />

zu mehr Gebäudeeffizienz<br />

Using Intelligent Building Automation<br />

for Greater Building Efficiency<br />

Wie sich durch Gebäudeautomation und Energiemanagement eine größtmögliche<br />

Energieeffizienz in Gebäuden erreichen lässt, zeigt die Kongressmesse<br />

„GebäudeEffizienz 20<strong>09</strong>“ am 12. November im Congress Center der Messe<br />

Frankfurt am Main. Die <strong>BACnet</strong> Interest Group <strong>Europe</strong> (BIG-EU) unterstützt<br />

die Veranstaltung aktiv. Volker Röhl, BIG-EU Präsident und Mitglied des<br />

Programmkomitees: „Mit fünf parallelen Betreiberforen bieten wir ein<br />

Programm für den Bedarf der Entscheider.“<br />

How to achieve the greatest possible energy efficiency in buildings by means<br />

of building automation and energy management will be shown at the<br />

“GebäudeEffizienz 20<strong>09</strong>” congress and trade show on 12 November at the Messe<br />

Frankfurt Congress Center. The <strong>BACnet</strong> Interest Group <strong>Europe</strong> (BIG-EU) i<br />

s actively supporting the event. According to Volker Röhl, BIG-EU president and<br />

a member of the program committee, “With five parallel user forums,<br />

we offer a program to meet the needs of decision makers.”<br />

Die diesjährige „Gebäude-<br />

Effizienz 20<strong>09</strong>“ ist eine facettenreiche<br />

Plattform für nachhaltiges<br />

Planen, Bauen und<br />

50<br />

Betreiben energieeffizienter<br />

Immobilien. Betreiber stellen<br />

nicht nur neue Best-Pratices<br />

für verschiedene Gebäu-<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

detypen vor – für Bildung,<br />

Gesundheit, Verwaltung, Industrie<br />

und Infrastruktur.<br />

Auch modernes Energiema-<br />

Letztes Jahr erfolgreich als „GebäudeSysteme 2008“ gestartet, wird die „Gebäudeeffizienz<br />

20<strong>09</strong>“ dieses Jahr aktiv von Planern und Architekten unterstützt.<br />

Successfully initiated as „GebäudeSysteme 2008“, the „Gebäudeeffizienz 20<strong>09</strong>“will this<br />

year be supported actively by planners and architects.<br />

nagement, aktuelle Förderprogramme,<br />

neue Trends und<br />

Visionen rund um das Thema<br />

Automation und Energieeffizienz<br />

werden praxisnah<br />

präsentiert.<br />

Erstmals verleiht das Pogrammkomitee<br />

dieses Jahr<br />

den „GebäudeEffizienz<br />

Award“. Ausgezeichnet werden<br />

das beste Produkt, das<br />

herausragendste Produktdesign<br />

und die effizientesten<br />

Services. Bewertungskriterien<br />

sind neben der Dokumentation<br />

die Funktionalität, die Energieeffizienz,<br />

die Kommunikationsfähigkeit<br />

sowie der<br />

wirtschaftliche Nutzen. Teilnahmeberechtigt<br />

sind alle<br />

Aussteller und Sponsoren.<br />

Mit ihrem abwechslungsreichen<br />

Programm richtet<br />

sich die „GebäudeEffizienz<br />

20<strong>09</strong>“ an „Endnutzer“ wie<br />

Betreiber, Investoren, Technisches<br />

Management, Facility<br />

Manager, Liegenschaftsverwaltungen,<br />

aber vor allem


Fachliche Diskussion auf der „GebäudeSysteme 2008“<br />

in Frankfurt.<br />

Professional discussion at the „GebäudeSysteme 2008“<br />

at Frankfurt.<br />

auch an Planer und Architekten.<br />

Neben der BIG-EU, Lon-<br />

Mark Deutschland und der<br />

enocean alliance unterstützen<br />

dieses Jahr erstmalig<br />

auch der VBI (Verband Beratender<br />

Ingenieure) und der<br />

BDA (Bund Deutscher Architekten)<br />

das Event. Darüber<br />

hinaus konnten die Veranstalter<br />

TEMA Technologie<br />

Marketing und MarDirect<br />

auch die Messe Frankfurt<br />

und den VDMA (Deutscher<br />

Maschinen- und Anlagenbau<br />

e.V.) als Partner gewinnen.<br />

Information und Anmeldung<br />

unter www.gebaeudeeffizienz20<strong>09</strong>.de<br />

This year’s “GebäudeEffizienz<br />

20<strong>09</strong>” is a multifaceted<br />

platform for the sustainable<br />

design, construction and<br />

operation of energy-efficient<br />

properties. Operators will not<br />

only present new best-practices<br />

for different building types,<br />

such as education, health<br />

care, administrative, industrial<br />

and infrastructure, but<br />

modern energy management,<br />

current support programs,<br />

new trends and visions relating<br />

to the theme of automation<br />

and energy efficiency will<br />

also be presented in practical<br />

terms.<br />

This year for the first time,<br />

the program committee will<br />

give the “GebäudeEffizienz<br />

Award”. The best product,<br />

the most outstanding product<br />

design and the most<br />

efficient services will be recognized.<br />

Besides documenting<br />

product functionality, the<br />

evaluation criteria include<br />

energy efficiency, ability<br />

to communicate, as well as<br />

economic benefits. The competition<br />

is open to all exhibitors<br />

and sponsors.<br />

With its diverse program<br />

“GebäudeEffizienz 20<strong>09</strong>” is<br />

aimed at “end users” such<br />

as operators, investors, technical<br />

management, facility<br />

managers, property management<br />

companies, and especially<br />

planners and architects.<br />

Besides the BIG-EU, Lon-<br />

Mark Germany and the<br />

enocean alliance, this year<br />

the VBI (Association of<br />

Consulting Engineers) and<br />

the BDA (Association of<br />

German Architects) will<br />

also support the event for the<br />

first time. Furthermore, event<br />

organizers TEMA Technologie<br />

Marketing and Mar-<br />

Direct were also able to obtain<br />

Messe Frankfurt and the<br />

VDMA (German Machinery<br />

and Plant Manufacturing<br />

Association) as partners.<br />

Information and registration<br />

can be found at www.gebaeudeeffizienz20<strong>09</strong>.de.<br />

Whenever open building<br />

automation is under<br />

discussion, talk turns to<br />

<strong>BACnet</strong>. And if it has to<br />

be modular, extensible and<br />

energy effi cient as well,<br />

talk turns to SAUTER.<br />

SAUTER EY-modulo 5: with <strong>BACnet</strong>/IP.<br />

Energy effi cient, open and economical – module for module<br />

for module. Modular, native <strong>BACnet</strong> stations of the SAUTER<br />

EY-modulo 5 series are the intelligent solutions in every respect<br />

for any needs relating to building management and room automation.<br />

With its optimal function modules, integrated web connection<br />

and comfortable intelligent unitary control, SAUTER sets<br />

new standards. Because it is freely programmable, SAUTER<br />

EY-modulo 5 provides perfect system integration (e.g. M-Bus,<br />

Modbus) and smooth operation. Find out more about its versatility:<br />

www.sauter-controls.com<br />

Systems<br />

Components<br />

Services<br />

Facility Management


<strong>BACnet</strong> Interest Group<br />

<strong>BACnet</strong> France auf der interclima+elec Paris<br />

<strong>BACnet</strong> France at interclima+elec Paris<br />

Interclima+elec, die größte<br />

Messe für Automationslösungen<br />

und Energie in Industrie<br />

und Infrastruktur<br />

Frankreichs, findet vom 9.<br />

bis 12. Februar 20<strong>10</strong> in Paris<br />

statt. Zum zweiten Mal<br />

seit Gründung der französischen<br />

<strong>BACnet</strong> Organisation<br />

wird auch <strong>BACnet</strong> France mit<br />

seinen Mitgliedern vertreten<br />

sein. Sie zeigt die Integration<br />

der verschiedenen Gewerke<br />

mit <strong>BACnet</strong>.<br />

Bereits auf der vergangenen<br />

interclima+elec im Jahr 2008<br />

präsentierte sich <strong>BACnet</strong><br />

France mit einem institutionellen<br />

Stand. Der Stand<br />

weckte auf Anhieb großes<br />

Interesse und wurde an allen<br />

vier Messetagen von zahlreichen<br />

Planern, Integratoren<br />

und Beratern besucht.<br />

Inzwischen hat der weltweite<br />

Kommunikationsstandard<br />

<strong>BACnet</strong> viele Marktanteile in<br />

Frankreich gewonnen und die<br />

meisten Hersteller bieten jetzt<br />

<strong>BACnet</strong> kompatible Komponenten<br />

und Lösungen an.<br />

<strong>BACnet</strong> France zählt mittlerweile<br />

ein Dutzend Mitglieder,<br />

Italienisches <strong>BACnet</strong> <strong>Journal</strong> am Start<br />

<strong>BACnet</strong> Italy <strong>Journal</strong> on the Move<br />

In Kürze erscheint das erste<br />

<strong>BACnet</strong> Italy <strong>Journal</strong> –<br />

in italienischer Sprache: Für<br />

Antonio Catalano, den die<br />

Gründungsmitglieder der<br />

italienischen <strong>BACnet</strong>-Gruppe<br />

zu ihrem Vertreter wählten,<br />

steht jetzt schon fest,<br />

dass dieses Magazin sich in<br />

Kürze zum Informations-<br />

und Werbeträger der <strong>BACnet</strong><br />

Hersteller und Anwender in<br />

Italien entwickeln wird. Als<br />

sein Stellvertreter wurde Sal-<br />

52<br />

die abwechselnd den Stand<br />

besetzen werden, um Fachauskünfte<br />

zu erteilen und<br />

über die nächsten Trainings<br />

oder <strong>BACnet</strong> France Aktionen<br />

zu berichten.<br />

<strong>BACnet</strong> France wird auffällig<br />

im Zentrum der Automationsanbieter<br />

platziert, in<br />

einem eigens für offene Standards<br />

reservierten Bereich.<br />

Interclima+elec, France’s<br />

largest exhibition for automation<br />

solutions and energy<br />

in industry and infrastructure<br />

is taking place in Paris<br />

from 9-12 February, 20<strong>10</strong>.<br />

For the second time since<br />

the foundation of the French<br />

<strong>BACnet</strong> organization, <strong>BACnet</strong><br />

France and its members<br />

will be represented. They will<br />

show how the various trades<br />

are integrated with <strong>BACnet</strong>.<br />

<strong>BACnet</strong> France was showcased<br />

at a joint stand at the<br />

2008 interclima+elec. The<br />

stand immediately aroused<br />

great interest and was visited<br />

by many planners, integrators<br />

and consultants on all<br />

four exhibition days.<br />

vatore Cataldi von der ESAC<br />

gewählt.<br />

Das <strong>BACnet</strong> Italy <strong>Journal</strong><br />

bestätigt die Bedeutung des<br />

Standards auf dem italienischen<br />

Markt und wird den<br />

Lesern – Anwendern, Herstellern<br />

und allen Interessierten<br />

aus den Bereichen Gebäudeautomation,<br />

Facility<br />

Management, Energiemanagement<br />

und Energy Services<br />

– als Kommunikati-<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

Plattform zur Netzwerkbildung und zum Informationsaustausch:<br />

Der Messestand der <strong>BACnet</strong> France Organisation<br />

auf der interclima+elec.<br />

Platform for networking and exchange of information:<br />

The joint stand of the <strong>BACnet</strong> France community at<br />

interclima+elec.<br />

In the meantime, <strong>BACnet</strong> has<br />

won a large market share in<br />

France as a global communication<br />

standard, and most<br />

manufacturers now offer<br />

<strong>BACnet</strong> compatible components<br />

and solutions.<br />

By now <strong>BACnet</strong> France has<br />

more than a dozen members<br />

who will alternately oc-<br />

onsmedium dienen. Neue<br />

Produkte und Best Practices<br />

werden vorgestellt, technische<br />

Fragen erläutert,<br />

und die News informieren<br />

über Entwicklungen aus allen<br />

europäischen und internationalen<br />

<strong>BACnet</strong> Interest<br />

Groups.<br />

Bedeutende Unternehmen<br />

aus dem Bereich der Gebäudeautomation<br />

haben sofort<br />

zugesagt und das neue Ma-<br />

cupy the joint stand in order<br />

to provide specialized information<br />

and to report on the<br />

next trainings or <strong>BACnet</strong><br />

France projects.<br />

<strong>BACnet</strong> France will be conspicuously<br />

situated in the<br />

center of the automation<br />

vendors in a special area reserved<br />

for open standards.<br />

gazin mit Anzeigen, Anwenderartikeln<br />

und Produktberichten<br />

unterstützt.<br />

„Wir wissen alle, dass andere<br />

Kommunikationsprotokolle<br />

ihr eigenes <strong>Journal</strong> haben,<br />

jedoch nicht in verschiedenen<br />

Landessprachen. Das<br />

<strong>BACnet</strong> Italy <strong>Journal</strong> setzt<br />

auf die italienische Sprache,<br />

um damit die Kommunikation<br />

innerhalb einer eigenständigen<br />

<strong>BACnet</strong> Community


keep cool!<br />

It's cool to be green<br />

The Vacon <strong>10</strong>0 HVAC begins a new wave of<br />

fresh green thinking in HVAC matters.<br />

Vacon <strong>10</strong>0 HVAC AC drives excel in effi cient<br />

investment, installation, operation and<br />

maintenance.<br />

Es ist cool Grün zu sein<br />

Der neue Vacon <strong>10</strong>0 HVAC Frequenzumrichter<br />

bringt eine neue Dimension von<br />

umweltbewusstem Denken in den HKL-<br />

Bereich.<br />

Der Vacon <strong>10</strong>0 HVAC ist allemal eine gute<br />

Investition, denn er überzeugt auch durch<br />

Installationsfreundlichkeit, Zuverlässigkeit und<br />

Wartungsarmut.<br />

<strong>BACnet</strong> Version Standard<br />

<strong>BACnet</strong>/IP (Ethernet) ✔<br />

<strong>BACnet</strong> MS/TP (RS-485) ✔<br />

www.vacon.com


<strong>BACnet</strong> Interest Group<br />

in Italien zu stärken und ein<br />

echtes ‚<strong>BACnet</strong> Kompetenzzentrum’<br />

in Italien zu gründen“,<br />

so Antonio Catalano,<br />

der das italienische <strong>BACnet</strong><br />

Markting auch als Business<br />

Manager von Delta Controls<br />

Italy unterstützt.<br />

Wir wünschen den italienischen<br />

Kollegen viel Spaß<br />

beim Lesen und dem <strong>BACnet</strong><br />

Italy <strong>Journal</strong> viel Erfolg!<br />

The first <strong>BACnet</strong> Italy <strong>Journal</strong><br />

will appear shortly – purely<br />

in Italian. For Antonio Catalano,<br />

chosen as representative<br />

by the founding members of<br />

the Italian <strong>BACnet</strong> group, it<br />

is now already clear that the<br />

magazine will develop into<br />

the information and advertising<br />

medium for <strong>BACnet</strong> manufacturers<br />

and users in Italy.<br />

Salvatore Cataldi of ESAC<br />

was also chosen by the members<br />

of the Italian <strong>BACnet</strong><br />

group to be the deputy representative<br />

for Mr. Catalano.<br />

54<br />

Innovation by<br />

integration<br />

Does your organisation enjoy the advantages of <strong>BACnet</strong>?<br />

Interoperable system integration; a one-time investment that<br />

provides supplier independence; no licensing costs and freedom to<br />

choose hardware technology. Remote access utilizing <strong>BACnet</strong> over<br />

Ethernet makes systems operation from any location a reality. The<br />

result: low-cost investment + optimal ease-of-use = an innovative<br />

building management system.<br />

Regel Partners does it right!<br />

The <strong>BACnet</strong> Italy <strong>Journal</strong><br />

confirms the importance of<br />

the <strong>BACnet</strong> standard on the<br />

Italian market, and it will<br />

serve as a communication<br />

medium for its readers - users,<br />

manufacturers and all those<br />

interested in the fields of<br />

building automation, facility<br />

management, energy management<br />

and energy services.<br />

New products and best practices<br />

will be presented, technical<br />

questions discussed,<br />

and news on developments<br />

from all <strong>Europe</strong>an and international<br />

<strong>BACnet</strong> Interest<br />

Groups will be covered.<br />

Major companies in the<br />

building automation field<br />

have already confirmed their<br />

participation and will support<br />

the new magazine with<br />

ads, user articles, and product<br />

reviews.<br />

“We all know that other<br />

communication protocols<br />

have their own journal, but<br />

not in various languages. The<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

www.bacnetitalia.org<br />

<strong>BACnet</strong> Italy<br />

Benvenuti alla prima edizione<br />

del <strong>BACnet</strong> Italy <strong>Journal</strong>!<br />

Un esempio perfetto<br />

<strong>10</strong>/<strong>09</strong> d’integrazione Bus 7 01 La più grande rete <strong>BACnet</strong> in<br />

un edifi cio pubblico italiano! <strong>10</strong><br />

<strong>BACnet</strong>: oggetti virtuali per<br />

sistemi reali 23<br />

<strong>BACnet</strong> Italy <strong>Journal</strong> is published<br />

in Italian in order to<br />

strengthen communi cation<br />

within the autonomous <strong>BACnet</strong><br />

community in Italy and to<br />

form a true ‘<strong>BACnet</strong> expertise<br />

center’ in Italy ”, said Mr.<br />

Catalano, supporting Italian<br />

<strong>Journal</strong><br />

<strong>BACnet</strong> marketing in his role<br />

as business manager for Delta<br />

Controls Italy as well.<br />

We wish our Italian colleagues<br />

enjoyable reading and we wish<br />

the <strong>BACnet</strong> Italy <strong>Journal</strong> every<br />

success!<br />

System Integrators with Content<br />

Regel Partners B.V.<br />

Hogebrinkerweg 8<br />

3871 KN Hoevelaken<br />

P.O. Box 86<br />

ISSN ISSN 1614-9572 1614-9572<br />

3870 CB Hoevelaken<br />

T. +31 (0)33 254 48 48<br />

F. +31 (0)33 254 48 44<br />

info@regelpartners.nl<br />

www.regelpartners.nl


Willkommen in der BIG-EU<br />

Welcome to the BIG-EU<br />

Danfoss GmbH<br />

Tobias Dietz<br />

Tobias.dietz@danfoss.com<br />

www.danfoss.com/Germany<br />

Danfoss, gegründet 1933, ist<br />

ein internationaler Konzern.<br />

Das Produktprogramm umfasst<br />

Wärmetechnik, Kälte-<br />

und Klimatechnik sowie<br />

Elektrische Antriebstechnik.<br />

Bereits 1968 lieferte Danfoss<br />

den ersten in Serie gefertigtenFrequenzumrichter<br />

und verfügt über mehr<br />

als 25 Jahre Erfahrung in<br />

der Antriebsregelung für<br />

die Gebäudeautomation,<br />

gekennzeichnet durch die<br />

Einführung des ersten darauf<br />

spezialisierten Umrichters.<br />

2006 stellte Danfoss<br />

den VLT ® HVAC Drive vor,<br />

der sich durch sein modulares<br />

Systemdesign optimal<br />

an die jeweilige Anwendung<br />

anpassen lässt. Er verfügt<br />

über ein Optionsmodul für<br />

die einfache Integration in<br />

<strong>BACnet</strong>-Netze.<br />

Ein umfassendes Dienstleistungsangebot<br />

rundet das<br />

Portfolio ab. Dazu zählen<br />

eine 24-Stunden-Hotline,<br />

die mit hoch qualifizierten<br />

Technikern besetzt ist, sowie<br />

das dichte Servicenetz<br />

mit den Danfoss Systempartnern.<br />

Danfoss is an international<br />

concern, founded in 1933.<br />

The product program consists<br />

of heating, refrigeration<br />

and air conditioning technology<br />

as well as electrical<br />

drives. In 1968 Danfoss delivered<br />

the first serially pro-<br />

duced frequency converter<br />

and has more than 25 years<br />

experience in drives control<br />

for building automation,<br />

characterised through<br />

the introduction of the first<br />

HVAC specialised drive.<br />

In 2006 Danfoss introduced<br />

the VLT HVAC Drive. The<br />

modular concept of the<br />

drive makes it easy to adapt<br />

to particular applications. It<br />

also offers an optional module<br />

for easy integration into<br />

<strong>BACnet</strong> networks.<br />

The broad range of services<br />

offered makes the portfolio<br />

complete. This includes a 24<br />

hour. hotline with qualified<br />

engineers and a close service<br />

network with Danfoss system<br />

partners.<br />

Hosch Gebäudeatuomation<br />

Holger Schaefe GmbH<br />

Jörg Balow<br />

jbalow@hosch-ga.de<br />

www.hosch-ga.de/<br />

Die HOSCH Gebäudeautomation<br />

ist ein Spezialist für<br />

Gebäudeautomation und Systemintegration.<br />

Ein großes<br />

Team von Mitarbeitern projektiert,<br />

erstellt und verknüpft<br />

Systeme der Gebäudeautomation.<br />

HOSCH ist<br />

ein markenunabhängiger Systemintegrator<br />

und verwendet<br />

auch in vielen Projekten<br />

das Protokoll <strong>BACnet</strong>.<br />

Durch Mitwirkung in verschiedenstenArbeitskreisen<br />

des DIN und des VDI im<br />

Bereich der Elektrotechnik<br />

und der Gebäudeautomation<br />

ist eine kompetente Be-<br />

ratung unserer Kunden auf<br />

höchstem Niveau gesichert.<br />

Markenunabhängige Systemintegration<br />

und maßgeschneiderte<br />

Anwendung des<br />

<strong>BACnet</strong>-Protokolls sorgen<br />

für sichere, energiesparende<br />

und komfortable Nutzung<br />

von Gebäuden und Anlagen.<br />

Auch ist die HOSCH Gebäudeautomation<br />

ein erfahrender<br />

Dienstleister im<br />

Bereich des technischen Gebäudemanagements.<br />

HOSCH setzt die Gebäudeautomation<br />

für kundengerechte<br />

Energieeffizienz ein<br />

und berät Kunden mit Contractingmodellen.<br />

HOSCH Gebäudeautomation<br />

is a specialist for building<br />

automation and system<br />

integration. A large team of<br />

employees designs, prepares<br />

and connects building automation<br />

systems. HOSCH<br />

is a brand-independent system<br />

integrator and uses the<br />

<strong>BACnet</strong> protocol in many<br />

projects, too.<br />

Participation in the most diverse<br />

study groups for DIN<br />

and VDI in the area of electrical<br />

engineering and building<br />

automation guarantees<br />

competent consultation for<br />

our clients on the highest<br />

level.<br />

Brand-independent system<br />

integration and tailor-made<br />

use of the <strong>BACnet</strong> protocol<br />

provide for safe, energysaving<br />

and comfortable use<br />

of buildings and installations.<br />

HOSCH Gebäudeautomation<br />

is also an experienced<br />

service provider in the area<br />

of technical building management.<br />

<strong>BACnet</strong> Interest Group<br />

HOSCH applies building<br />

automation for customeroriented<br />

energy efficiency<br />

and advises clients in the use<br />

of contracting models.<br />

Stefan Seyfarth<br />

s.seyfarth@thermokon.de<br />

www.thermokon.de<br />

Thermokon Sensortechnik<br />

GmbH ist ein mittelständisches<br />

deutsches Unternehmen<br />

mit Niederlassungen in<br />

Österreich, Schweden und<br />

Polen und hat sich auf die<br />

Produktion von Sensorik<br />

für die Klima- und Gebäudeleittechnik<br />

spezialisiert.<br />

Dank modernster Sensortechnologie<br />

sorgt Thermokon<br />

dafür, dass hier Einsparpotenziale<br />

optimal<br />

ausgeschöpft werden durch<br />

individuell zugeschnittene<br />

Lösungen, die eine Anpassung<br />

von Heizung, Klimatisierung<br />

und Lichtsteuerung<br />

an die tatsächliche Nutzung<br />

des Raumes ermöglichen.<br />

Ideal für Neubauten<br />

als auch zur Nachrüstung<br />

sind dabei die innovativen<br />

Erfolgsprodukte des Easy-<br />

Sens Funksensor-Systems.<br />

Thermokon is a mediumsized<br />

company in the middle<br />

of Germany with three<br />

branches in Austria, Sweden<br />

and Poland and specializes<br />

in the production<br />

of sensors for HVAC and<br />

building control technology.<br />

Thanks to the latest sensor<br />

technologies Thermokon ensures<br />

an ideal utilization of<br />

saving potentials, e.g. by of-<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

55


<strong>BACnet</strong> Interest Group<br />

fering individually matched<br />

solutions for the adaptation<br />

of heating, air-conditioning<br />

and light control to the actual<br />

use of a room. The innovative<br />

and proven wireless<br />

sensor system EasySens<br />

is specially designed for new<br />

buildings and retrofitting.<br />

56<br />

Beyond Comfort<br />

Viconics Inc.<br />

Trevor Palmer<br />

tpalmer@viconics.com<br />

www.viconics.com<br />

Viconics Inc. wurde 1981 in<br />

Montreal, Kanada als Quantum<br />

Electronics gegründet.<br />

Die Gründung war Antwort<br />

auf die Forderung des<br />

Marktes nach kostengünstiger<br />

industrieller Prozess-<br />

und Temperaturausrüstung.<br />

Anfang der 90er Jahre erweiterte<br />

Viconics seine Produktions-<br />

und R&D Einrichtungen.<br />

Dieses Wachstum<br />

wurde durch die Einführung<br />

eines kompletten Sortiments<br />

der microcontrollerbasierten<br />

HLK-Temperatur und Feuchtigkeits-Controllerangetrieben.<br />

Mit der Verbreitung offener<br />

Kommunikationsstandards<br />

wie <strong>BACnet</strong> hat Viconics seine<br />

Produktlinien weiter ausgedehnt.<br />

Dabei wurde die<br />

komplette Produktlinie der<br />

Controller entwickelt, um<br />

Gesamtkosten, traditionell<br />

arbeitsintensive Inbetriebnahme<br />

Prozeduren und komplizierte<br />

Programmiertechniken<br />

verbunden mit programmierbaren<br />

DDC-Steuerelementen<br />

zu verringern.<br />

Die nächste Generation<br />

der Controller-Produkte<br />

von Viconics werden sich<br />

fast vollständig auf den<br />

bestehenden Gebäudesanierungs-Markt<br />

konzentrieren.<br />

Produkte, die leichter zu installieren<br />

sind und bestehendeVerdrahtungs-Infrastrukturen<br />

verwenden während<br />

sie gleichzeitig großen Kontrollkomfort,<br />

große Energieeinsparungen<br />

und einen<br />

schnellen Return on Investment<br />

unterstützen.<br />

Viconics Inc. was founded in<br />

1981 in Montreal, Canada as<br />

Quantum Electronics in response<br />

to a market demand<br />

for cost-effective industrial<br />

process and temperature controls<br />

equipment.<br />

In the early 1990s Viconics<br />

Inc. expanded its manufacturing<br />

and R&D facilities.<br />

This growth was fueled with<br />

the introduction of a complete<br />

line of microcontrollerbased<br />

HVAC temperature<br />

and humidity controllers.<br />

With the proliferation of<br />

open communication standards<br />

like <strong>BACnet</strong>, Viconics<br />

has further expanded its<br />

product line. This complete<br />

line of controllers has been<br />

developed to reduce overall<br />

costs, traditional labor-intensive<br />

commissioning procedures,<br />

and complicated<br />

programming techniques associated<br />

with programmable<br />

DDC controls.<br />

The next generation of control<br />

products from Viconics<br />

will focus almost entirely on<br />

the existing building retrofit<br />

market. These are products<br />

that are easier to install, using<br />

existing wiring infrastructure<br />

while providing<br />

exceptional comfort control,<br />

energy savings and return on<br />

investment.<br />

<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> <strong>11</strong> <strong>10</strong>/<strong>09</strong><br />

<strong>BACnet</strong> Kalender<br />

Calendar of <strong>BACnet</strong> Events<br />

Datum<br />

Date<br />

20<strong>09</strong><br />

Ort<br />

Location<br />

20.<strong>10</strong>.20<strong>09</strong> Beijing, CN<br />

27.<strong>10</strong>.20<strong>09</strong><br />

Schiphol<br />

Airport<br />

Amsterdam,<br />

NL<br />

05.<strong>11</strong>.20<strong>09</strong> Hoevelaken,<br />

NL<br />

<strong>09</strong>.<strong>11</strong>.20<strong>09</strong> Zürich, CH<br />

Veranstaltung<br />

Event<br />

<strong>BACnet</strong> Forum<br />

Bejing<br />

<strong>BACnet</strong> Academy<br />

<strong>Europe</strong><br />

Smart Buildings<br />

20<strong>09</strong><br />

Green Building<br />

20<strong>09</strong><br />

12.<strong>11</strong>.20<strong>09</strong> Frankfurt, D GebäudeEffizienz<br />

20<strong>09</strong><br />

17.-<br />

18.<strong>11</strong>.20<strong>09</strong><br />

23.-<br />

26.<strong>11</strong>.20<strong>09</strong><br />

20<strong>10</strong><br />

25.-<br />

27.01.20<strong>10</strong><br />

<strong>09</strong>.-<br />

12.02.20<strong>10</strong><br />

23.-<br />

24.02.20<strong>10</strong><br />

23.-<br />

27.03.20<strong>10</strong><br />

<strong>11</strong>.-<br />

16.04.20<strong>10</strong><br />

<strong>09</strong>.-<br />

<strong>10</strong>.06.20<strong>10</strong><br />

Tours, F <strong>BACnet</strong> Training<br />

Dubai, UAE<br />

Orlando,<br />

USA<br />

Paris, F<br />

Joint <strong>BACnet</strong> booth<br />

at the Big 5<br />

AHR Expo 20<strong>10</strong>,<br />

Common Booth<br />

<strong>BACnet</strong> booth<br />

interclima + elec<br />

home&building<br />

Mannheim, D <strong>BACnet</strong> VDI<br />

Training<br />

Milan, I<br />

20.<strong>09</strong>.20<strong>10</strong> Zug, CH<br />

<strong>BACnet</strong> booth<br />

Mostra Convegno<br />

Frankfurt, D <strong>BACnet</strong> booth<br />

Light+Building 20<strong>10</strong><br />

Frankfurt, D <strong>BACnet</strong> VDI<br />

Training<br />

WG-T and WG-M<br />

meetings<br />

Kontakt<br />

Information<br />

MarDirect, china@mardirect.de,<br />

www.bacnetforum.org<br />

Britta von Helden, MarDirect,<br />

vonhelden@mardirect.de<br />

BIG-EU Office, info@big-eu.org,<br />

www.smart-buildings.nl<br />

BIG-EU Office, info@big-eu.org,<br />

www.tage-der-technik.ch<br />

Bruno Kloubert, MarDirect,<br />

Dortmund, D.,<br />

kloubert@mardirect.de,<br />

www.gebaeudeeffizienz20<strong>09</strong>.de<br />

Association <strong>BACnet</strong> France,<br />

Paris F, info@mardirect.de,<br />

Tel. Paris: 01 46 89 67 25<br />

MarDirect, Dortmund, D.,<br />

info@mardirect.de<br />

MarDirect, Dortmund, D.,<br />

info@mardirect.de<br />

Association <strong>BACnet</strong> France,<br />

Paris F, info@mardirect.de,<br />

Tel. Paris: 01 46 89 67 25<br />

Frank Schubert, MBS GmbH,<br />

Krefeld, D.,<br />

frank.schubert@mbs-software.de<br />

Hans R. Kranz,<br />

HAK-Ingenieurberatung<br />

Haustechnik Automation Kranz,<br />

Forst, D., hans.kranz@vdi.de<br />

MarDirect, italy@mardirect.de,<br />

BIG-EU Office, info@big-eu.org<br />

MarDirect, Dortmund, D.,<br />

info@mardirect.de<br />

Frank Schubert,<br />

MBS GmbH, Krefeld, D.,<br />

frank.schubert@mbs-software.de<br />

Hans R. Kranz,<br />

HAKIngenieurberatung<br />

Haustechnik Automation Kranz,<br />

Forst, D., hans.kranz@vdi.de<br />

BIG-EU Office, info@big-eu.org<br />

20.<strong>09</strong>.20<strong>10</strong> Zug, CH General Meeting BIG-EU Office, info@big-eu.org<br />

21.<strong>09</strong>.20<strong>10</strong> Zug, CH<br />

19.-<br />

20.<strong>10</strong>.20<strong>10</strong><br />

Advisory Board<br />

meeting<br />

Düsseldorf, D <strong>BACnet</strong> VDI<br />

Training<br />

w<br />

BIG-EU Office, info@big-eu.org<br />

Frank Schubert,<br />

MBS GmbH, Krefeld, D.,<br />

frank.schubert@mbs-software.de<br />

Hans R. Kranz,<br />

HAKIngenieurberatung<br />

Haustechnik Automation Kranz,<br />

Forst, D., hans.kranz@vdi.de


GebäudeEffizienz<br />

nachhaltig planen<br />

und wirtschaftlich<br />

nutzen<br />

� Intelligente Lösungen<br />

� Effiziente Technik<br />

� Best Services<br />

Top Themen<br />

� Anwendung von Effizienztechnologien<br />

� Energetische Anforderungen an Planung,<br />

Bau und Betrieb<br />

� Optimierung durch Energiemanagement<br />

und Services<br />

� Trends und Visionen für die Stadt von morgen<br />

� Nachhaltige Schulsanierung<br />

Hochkarätige Referenten<br />

� Tarek Al-Wazir, MdL<br />

� Bertram Canzler, Canzler Ingenieure<br />

� Dr. Michael Bauer, Drees & Sommer<br />

Advanced Building Technologies<br />

� Gemeinde Beckerich aus Luxemburg<br />

� Hans-Dieter Hegner, Bundesministerium<br />

für Verkehr, Bau und Stadtentwicklung<br />

� Prof. Dr. Rainer Hirschberg, FH Aachen<br />

� Fraunhofer InHaus Zentrum<br />

� Dieter Leipoldt, Ebert-Ingenieure<br />

� Richard Weller, makon GmbH & Co. KG<br />

GebäudeEffizienz Award<br />

Das beste Produkt, das herausragendste Design<br />

und die effizientesten Services werden mit dem<br />

GebäudeEffizienz Award 20<strong>09</strong> ausgezeichnet.<br />

Funktionalität, Energieeffizienz, Kommunikationsfähigkeit<br />

und wirtschaftlicher Nutzen sind<br />

die Kriterien.<br />

Partner<br />

Kongressmesse für<br />

energieeffiziente Immobilien<br />

Donnerstag,<br />

12. November 20<strong>09</strong><br />

Congress Center der<br />

Messe Frankfurt<br />

Information. Bewerbung. Anmeldung.<br />

www.gebaeudeeffizienz20<strong>09</strong>.de<br />

VERBAND<br />

BERATENDER<br />

INGENIEURE

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!