Revised scheme for B.Tech. - Punjab Technical University
Revised scheme for B.Tech. - Punjab Technical University
Revised scheme for B.Tech. - Punjab Technical University
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PTU/BOS/ME/101/10-06-2005/BATCH-2003<br />
DE/PE-3.2 NETWORK ANALYSIS<br />
Internal Marks: 40 L T P<br />
External Marks: 60 3 1 0<br />
Total Marks: 100<br />
Introduction<br />
Characteristics of effective planning, historical background to network charts, where<br />
network charts can be used; the basic essentials; analysis and scheduling;<br />
controlling and introducing PERT & CPM into an organisation.<br />
Elements of a Network<br />
Activities and events; conventions adopted in drawing networks; the graphical<br />
representation of events and activities; identification of activities; fundamental<br />
properties of events and activities; errors in logic;<br />
Drawing the Network<br />
Drawing the network; interfacing; duration times; duration times under uncertainty;<br />
PERT , assigning duration times, numbering the events,listing the events and<br />
activities; drawing arrow diagrams.<br />
Analysing the Networks<br />
Calculating the total project time; isolation of the critical path- earliest and<br />
latest events, time; total float; free and independent float; negative float; use of<br />
different float.<br />
Applications<br />
Application of PERT and CPM; calculation of the load; the problem of optimisation,<br />
smoothing the load; scheduling manual resource allocation.<br />
NOP Networks<br />
Representation of logic in MOP; representation of time-milestone in MOP; analysis of<br />
a MOP network resource allocation; matrix method of expressing and analysis MOP<br />
diagrams.<br />
Introduction to LOB Networks<br />
Where LOB be used; node times LOB chart; LOB life table control using LOB.<br />
Books:<br />
1. CPM in Construction Management O'Brien McGraw-Hill<br />
2. Network Based Management System Archibald & Villaria John Wiley<br />
3. A Programmed Introduction to PERT Federal Elect.Corp. Prentice Hall<br />
4. A Management Guide to PERT/CPM Wiest & Levy Prentice Hall<br />
5. Management by Network Bhattacharya Institution of Engrs