Advanced Welding Processes: Technologies and Process Control
Advanced Welding Processes: Technologies and Process Control
Advanced Welding Processes: Technologies and Process Control
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
References 273<br />
[178] Benn B, 1988 ‘Joining technology at Rolls Royce PLC, Bristol’, Weld Metal<br />
Fabric, 56(6).<br />
[179] Nightingale K R, 1983 ‘Electron beam welding of copper <strong>and</strong> its alloys’, Weld<br />
Inst Res Bull, 24(1).<br />
[180] Russell J D, 1981 ‘Electron beam welding – a review’, Metal Construct, 13(7).<br />
[181] Malin V Y, 1983 ‘The state-of-the-art of narrow gap welding Weld J, 62(6).<br />
[182] Foote W, 1987, PhD thesis, Cranfield Institute of Technology.<br />
[183] Farish E, 1989 ‘Modelling the GTAW process with cold wire addition’, MSc<br />
thesis, Cranfield Institute of Technology.<br />
[184] R<strong>and</strong>all M D <strong>and</strong> Nelson J W, 1979 ‘CRC automatic welding system’, Proc Conf<br />
Recent Developments in Pipeline <strong>Welding</strong>, Cambridge, The <strong>Welding</strong> Institute.<br />
[185] Meister R P et al., 1966 ‘Narrow gap welding process’, Br Weld J, 13(5).<br />
[186] Modenesi P, 1990 ‘Statistical modelling of narrow gap gas metal arc welding<br />
process’, PhD thesis, Cranfield Institute of Technology.<br />
[187] Kimura S et al., 1979 ‘Narrow gap gas metal arc welding process in the flat<br />
position’, Weld J.<br />
[188] Nakayama M <strong>and</strong> Arikana M, 1975 ‘Development <strong>and</strong> application of narrow gap<br />
arc welding processes in Japan’, Weld World, 13(9/10).<br />
[189] Alfaro S 1989 ‘Mathematical modelling in narrow gap submerged arc welding’,<br />
PhD thesis, Cranfield Institute of Technology.<br />
[190] Alfaro S C A <strong>and</strong> Apps R L A, 1989 ‘Mathematical modelling of narrow gap<br />
submerged arc welding’, Proc int conf on Joining of Materials, JOM-4, Helsingor,<br />
Denmark, 19–22 March.<br />
[191] de Altamer A, 1980 ‘Submerged arc narrow gap welding’, Metal Construct,<br />
12(10).<br />
[192] Hirai et al., 1981 ‘Application of narrow gap submerged arc welding to fabrication<br />
of 2.25%Cr–1%Mo forged steel heat exchangers’, Int Inst Weld Doc, XIIA-009-<br />
81.<br />
[193] Lochead J C, 1983 ‘Narrow gap welding’, Proc Joint Conf South African Institute<br />
of <strong>Welding</strong> <strong>and</strong> Institute of Mechanical Engineers, <strong>Welding</strong> <strong>and</strong> the Engineer, the<br />
Challenge of the 80s.<br />
[194] Kennedy N A, 1986 ‘Narrow gap submerged arc welding of steel; Part 1<br />
Applications’, Metal Construct 18(11).<br />
[195] Ellis D J, 1988 ‘Mechanised narrow gap welding of ferritic steel’, Join Mater,<br />
1(2).<br />
[196] Curtis G, Lovegrove G L <strong>and</strong> Farrar R A, 1990 ‘WASPS’ – an advisory system<br />
for welding process selection’, Weld Metal Fabric, 58(1).<br />
[197] Hicks J, 1979 A Guide to Designing Welds, Cambridge, Abington Publishing.<br />
[198] British St<strong>and</strong>ards Institution, 1986 BS 4871, Specification for approval testing of<br />
welders working to approved welding procedures; 1986 BS 4872, Specification<br />
for approval testing of welders when welding procedure approval is not required.<br />
[199] Queen D M, 1989 ‘The evaluation <strong>and</strong> implementation of a computerised welding<br />
procedure database management system’, Shell Expro.<br />
[200] Robinson P, Private communication.<br />
[201] Smith D S, 1988 ‘<strong>Control</strong> of MMA welding in practice – a user’s view’, Who’s<br />
In <strong>Control</strong> seminar, Cranfield Institute of Technology, 25–26 May.<br />
[202] Smith C J, 1988 ‘The calibration of welding equipment’, Who’s in <strong>Control</strong> seminar,<br />
Cranfield Institute of Technology, 25–26 May.