26.03.2013 Views

Y-IM-Single Package AC and Single Package Gas/Electric Units ...

Y-IM-Single Package AC and Single Package Gas/Electric Units ...

Y-IM-Single Package AC and Single Package Gas/Electric Units ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

127083-Y<strong>IM</strong>-B-0606<br />

DUCTWORK<br />

Ductwork should be designed <strong>and</strong> sized according to the<br />

methods in Manual D of the Air Conditioning Contractors of<br />

America (<strong>AC</strong>CA) or as recommended by any other recognized<br />

authority such as ASHRAE or SM<strong>AC</strong>NA.<br />

A closed return duct system should be used. This will not<br />

preclude use of economizers or outdoor fresh air intake. The<br />

supply <strong>and</strong> return air duct connections at the unit should be<br />

made with flexible joints to minimize noise.<br />

The supply <strong>and</strong> return air duct systems should be designed<br />

for the CFM <strong>and</strong> static pressure requirements of the job. They<br />

should NOT be sized to match the dimensions of the duct<br />

connections on the unit.<br />

Refer to Figure 9 for bottom air duct openings. Refer to Figure<br />

10 for rear air duct openings.<br />

6 ; 2 <br />

# <br />

!<br />

FIGURE 11 - PREDATOR ® ROOF CURB D<strong>IM</strong>ENSIONS<br />

$<br />

& # &<br />

% $ # &<br />

4 - 6 7 4 <br />

5 7 2 2 ;<br />

& H "<br />

DUCT COVERS<br />

<strong>Units</strong> are shipped with the side duct openings covered <strong>and</strong> a<br />

covering over the bottom of the unit. For bottom duct application,<br />

no duct cover changes are necessary. For side duct<br />

application, remove the side duct covers <strong>and</strong> install over the<br />

bottom duct openings. The panels removed from the side<br />

duct connections are designed to be reused by securing each<br />

panel to its respective downflow opening. But keep in mind<br />

that the supply panel is installed with the painted surface UP,<br />

facing the heat exchanger, while the return panel is installed<br />

with the painted surface DOWN, facing the downflow duct<br />

opening. The supply panel is secured with the bracket<br />

(already in place from the factory) <strong>and</strong> two screws. It’s a snug<br />

fit for the panel when sliding it between the heat exchanger<br />

<strong>and</strong> unit bottom, but there is room. The return panel is<br />

secured with four screws.<br />

1 5 7 ) 6 - , , - + 7 , - 4<br />

+ 2 4 - 5 5 4 5 - + 6 1 <br />

1 5 7 ) 6 - , , - + 7 , - 4<br />

+ , - 5 - 4 5 - + 6 1 <br />

Unitary Products Group 15<br />

. 4 6<br />

FIGURE 12 - SUNLINE TO PREDATOR ® TRANSITION ROOF CURBS<br />

# <br />

' "<br />

! <br />

4 - 6 7 4 <br />

6 ; 2<br />

! "<br />

5 7 2 2 ;<br />

4 1/ 0 6<br />

$ & # &<br />

# ' "<br />

. 4 6 4 1/ 0 6<br />

$ " "

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!