29.03.2013 Views

Appendix 4-A - Virginia Department of Conservation and Recreation ...

Appendix 4-A - Virginia Department of Conservation and Recreation ...

Appendix 4-A - Virginia Department of Conservation and Recreation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Virginia</strong> <strong>Department</strong> <strong>of</strong> Rail <strong>and</strong> Public Transportation November 2009<br />

HB 2088 Report<br />

Table <strong>of</strong> Contents<br />

Executive Summary ............................................................................................................ ii<br />

1. Introduction.................................................................................................................... 1<br />

1.1 Purpose <strong>and</strong> Need ................................................................................................... 1<br />

1.2 Stakeholder Interests ............................................................................................... 2<br />

1.2.1 Railroads.......................................................................................................... 2<br />

1.2.2 <strong>Recreation</strong>al Access <strong>and</strong> Public Crossing Advocates...................................... 2<br />

1.3 Limitations <strong>of</strong> the Report .......................................................................................... 2<br />

1.4 <strong>Recreation</strong>al Access <strong>and</strong> Railroad Interface Process.............................................. 3<br />

2. Project Interface <strong>and</strong> Development.............................................................................. 4<br />

2.1 Course <strong>of</strong> Action for Rails with Trails/Pedestrian Crossing Development ............... 4<br />

2.1.1 Project Feasibility............................................................................................. 4<br />

2.1.2 Stakeholder Identification <strong>and</strong> Outreach .......................................................... 6<br />

2.1.3 Master Planning ............................................................................................... 6<br />

2.1.4 Implementation Plans....................................................................................... 7<br />

2.2 Rails with Trails/Pedestrian Crossing Project Initiation, Coordination <strong>and</strong> Review.. 7<br />

2.2.1 Rails with Trails/Pedestrian Crossing Proposal Submission for Existing Rail<br />

Lines................................................................................................................. 7<br />

2.2.2 Process for Considering Rails with Trails/Pedestrian Crossings for new Rail<br />

Projects Funded with Rail Enhancement Funds .............................................. 9<br />

2.3 Legal Issues........................................................................................................... 10<br />

2.4 Additional Resources............................................................................................. 11<br />

Appendices<br />

<strong>Appendix</strong> A: Design Considerations for the Establishment <strong>of</strong> Rails with Trails/Pedestrian<br />

Crossings in the Commonwealth <strong>of</strong> <strong>Virginia</strong> Technical Memor<strong>and</strong>um ...................................12<br />

List <strong>of</strong> Figures<br />

Figure 2-1: Steps in an RWT/PC Feasibility Study..................................................................5<br />

i

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!