Mauritania - Islamic Development Bank
Mauritania - Islamic Development Bank
Mauritania - Islamic Development Bank
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PILLAR 2 -- RURAL DEVELOPMENT AND FOOD SECURITY (INFRASTRUCTURE -- TRANSPORT)<br />
IDB Interventions Output<br />
Intermediate Results<br />
that IDB Group<br />
Expects to Influence<br />
During the MCPS<br />
Period<br />
Outcomes that the<br />
IDB Group Expects to<br />
Support<br />
Current Challenges/<br />
Binding Constraints<br />
Government Goals / Strategy<br />
Source: PRSP III<br />
Feasibility study<br />
for the additional<br />
segments<br />
- Continue<br />
implementing the<br />
North-South Corridor<br />
through Atar-Tidjikja-<br />
Kifa<br />
Feasibility study<br />
for the additional<br />
segments is ready<br />
A significant reduction<br />
in travel time for<br />
traffic through the<br />
new North-South<br />
corridor<br />
Imbalanced funding<br />
for road maintenance<br />
versus road<br />
construction<br />
Steady<br />
implementation of the<br />
on-going projects and<br />
approval of financing<br />
for new segments<br />
Financing of some<br />
segments approved,<br />
(particularly<br />
- Improving rural<br />
access through paving<br />
and tarring rural<br />
feeders and earth<br />
tracks<br />
High transportation<br />
fees, limited<br />
capacity and lack<br />
of competitiveness<br />
of the maritime<br />
transport<br />
Improve the institutional<br />
organization of the sector<br />
Master plan of<br />
improvement of rural<br />
access road prepared<br />
Significant reduction<br />
in the cost of<br />
transport services<br />
through the corridor<br />
Priority rural access<br />
roads based on fair<br />
techno-economic<br />
criteria<br />
MCPS for <strong>Mauritania</strong>, 2011-2015 37<br />
Modernize the development of<br />
infrastructure<br />
- Enhancing the<br />
capacity of the<br />
National Road<br />
Maintenance<br />
Authority<br />
Master Plan for<br />
the ENER activity<br />
expansion is<br />
prepared, Investment<br />
in Heavy material is<br />
defined<br />
Substantial<br />
improvement in<br />
access to markets in<br />
rain fed areas<br />
Limited capacity<br />
of the national<br />
construction sector<br />
Improve the economic<br />
competitiveness of transport<br />
services<br />
Master Business Plan<br />
for the ENER activity<br />
expansion is prepared<br />
including renewal and<br />
Investment plan for<br />
Heavy material<br />
Increased capacity<br />
of the ENER in terms<br />
of roads length<br />
maintained per year.<br />
Limited internal<br />
capacity for M & E of<br />
projects<br />
Reinforce the capacity of the<br />
sector<br />
Feasibility study of<br />
integrated MIS in the<br />
Ministry of Transport<br />
- Technical and<br />
Managerial<br />
capacity building<br />
of the Ministry<br />
and Transport,<br />
particularly in terms<br />
of deployment of an<br />
effective MIS<br />
Needs Assessment<br />
and ToR for the<br />
preparation of<br />
Feasibility study of<br />
integrated MIS in the<br />
Ministry of Transport<br />
is prepared<br />
Comprehensive MIS<br />
of the Ministry of<br />
Transport in line with<br />
the Multi-modal<br />
master plan study<br />
Lack of PPP structures<br />
and regulations and<br />
limited absorption<br />
capacity of public<br />
sector