PILLAR 2 -- RURAL DEVELOPMENT AND FOOD SECURITY (INFRASTRUCTURE -- TRANSPORT)<br />

IDB Interventions Output<br />

Intermediate Results<br />

that IDB Group<br />

Expects to Influence<br />

During the MCPS<br />

Period<br />

Outcomes that the<br />

IDB Group Expects to<br />

Support<br />

Current Challenges/<br />

Binding Constraints<br />

Government Goals / Strategy<br />

Source: PRSP III<br />

Feasibility study<br />

for the additional<br />

segments<br />

- Continue<br />

implementing the<br />

North-South Corridor<br />

through Atar-Tidjikja-<br />

Kifa<br />

Feasibility study<br />

for the additional<br />

segments is ready<br />

A significant reduction<br />

in travel time for<br />

traffic through the<br />

new North-South<br />

corridor<br />

Imbalanced funding<br />

for road maintenance<br />

versus road<br />

construction<br />

Steady<br />

implementation of the<br />

on-going projects and<br />

approval of financing<br />

for new segments<br />

Financing of some<br />

segments approved,<br />

(particularly<br />

- Improving rural<br />

access through paving<br />

and tarring rural<br />

feeders and earth<br />

tracks<br />

High transportation<br />

fees, limited<br />

capacity and lack<br />

of competitiveness<br />

of the maritime<br />

transport<br />

Improve the institutional<br />

organization of the sector<br />

Master plan of<br />

improvement of rural<br />

access road prepared<br />

Significant reduction<br />

in the cost of<br />

transport services<br />

through the corridor<br />

Priority rural access<br />

roads based on fair<br />

techno-economic<br />

criteria<br />

MCPS for <strong>Mauritania</strong>, 2011-2015 37<br />

Modernize the development of<br />

infrastructure<br />

- Enhancing the<br />

capacity of the<br />

National Road<br />

Maintenance<br />

Authority<br />

Master Plan for<br />

the ENER activity<br />

expansion is<br />

prepared, Investment<br />

in Heavy material is<br />

defined<br />

Substantial<br />

improvement in<br />

access to markets in<br />

rain fed areas<br />

Limited capacity<br />

of the national<br />

construction sector<br />

Improve the economic<br />

competitiveness of transport<br />

services<br />

Master Business Plan<br />

for the ENER activity<br />

expansion is prepared<br />

including renewal and<br />

Investment plan for<br />

Heavy material<br />

Increased capacity<br />

of the ENER in terms<br />

of roads length<br />

maintained per year.<br />

Limited internal<br />

capacity for M & E of<br />

projects<br />

Reinforce the capacity of the<br />

sector<br />

Feasibility study of<br />

integrated MIS in the<br />

Ministry of Transport<br />

- Technical and<br />

Managerial<br />

capacity building<br />

of the Ministry<br />

and Transport,<br />

particularly in terms<br />

of deployment of an<br />

effective MIS<br />

Needs Assessment<br />

and ToR for the<br />

preparation of<br />

Feasibility study of<br />

integrated MIS in the<br />

Ministry of Transport<br />

is prepared<br />

Comprehensive MIS<br />

of the Ministry of<br />

Transport in line with<br />

the Multi-modal<br />

master plan study<br />

Lack of PPP structures<br />

and regulations and<br />

limited absorption<br />

capacity of public<br />

sector