04.05.2013 Views

Mauritania - Islamic Development Bank

Mauritania - Islamic Development Bank

Mauritania - Islamic Development Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cross-cutting Theme: CAPACITY BUILDING<br />

Capacity Building for Generic and Systemic Weaknesses (Continued)<br />

44<br />

IDB Interventions Output<br />

Intermediate Results<br />

that IDB Group<br />

Expects to Influence<br />

During the MCPS<br />

Period<br />

Outcomes that the<br />

IDB Group Expects to<br />

Support<br />

Government Goals / Strategy Current Challenges/<br />

Binding Constraints<br />

Electricity<br />

- Weak capacity<br />

in identification,<br />

formulation of PPP<br />

Energy projects<br />

- Targeted Training<br />

Sessions in PPP<br />

Contracts negotiation,<br />

- Setting-up of the<br />

Agency for Renewable<br />

Energy<br />

- Master Plan for<br />

Electricity Distribution<br />

Grid<br />

- Institutional<br />

framework of energy<br />

production outdated,<br />

- To enhance the capacity of<br />

identification, formulation and<br />

negotiation of PPP Electricity<br />

Projects<br />

- Reverse linkage<br />

agreements between<br />

<strong>Mauritania</strong> and IDB<br />

member countries in<br />

Rural Electrification<br />

and Renewable<br />

Energy,<br />

- Technical Capacity<br />

for Capacity Building<br />

Operations (Grants<br />

and Loans)<br />

- Review of the<br />

Institutional<br />

Framework for Energy<br />

Production<br />

- Preparation of the<br />

strategy of Renewable<br />

Energy<br />

- Weak capacity of<br />

implementation of<br />

rural electrification<br />

and renewable energy<br />

projects<br />

- To enhance the capacity<br />

of implementation of rural<br />

electrification projects and<br />

Renewable Energy Projects<br />

- To review the<br />

institutional<br />

Framework of Energy<br />

Production,<br />

- Lack of master<br />

plan for Electricity<br />

distribution grid<br />

MCPS for <strong>Mauritania</strong>, 2011-2015

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!