13.06.2013 Views

The Villager

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CAN THE REOPENING OF A RAILWAY<br />

STATION BECOME A REALITY? CONTINUED<br />

gateway to the National Rail Network for work,<br />

business, leisure and tourism. Putting Magor<br />

and Undy on the Rail and Geographical Map of<br />

Wales and Great Britain.<br />

We do not suggest that our own Station would<br />

be in direct competition with Severn Tunnel<br />

Junction. We propose something uniquely<br />

different. We have a unique selling point, that<br />

the entire population of the villages of about<br />

9000 can access the centre by foot or cycle in<br />

less than 15 minutes. <strong>The</strong>refore, unlike Severn<br />

Tunnel junction, which is a Parkway. We<br />

propose an environmentally friendly Walkway<br />

station. In other words, car and congestion<br />

unfriendly. Drop off facilities yes for the few,<br />

the so called “kiss and drop”. But there is no<br />

need for car parking, when that can be<br />

avoided. <strong>The</strong> new plans for enlarged parking at<br />

Severn Tunnel Junction serves that desire. We<br />

propose a station at the heart of the villages.<br />

<strong>The</strong>re is no better heart than the proposed<br />

Community Centre site on the B4245 and<br />

access to the main bus routes. As a Community<br />

Station, profits from ticket sales can be<br />

ploughed back into the community.<br />

We have an opportunity now to put this case<br />

forward, with the billions being spent on<br />

electrification. If we don’t get our Station in<br />

before the new electric overhead cables, then<br />

we may never achieve our aims. We are aiming<br />

for a date of March 2018 to open a new station.<br />

This timescale is determined by the<br />

replacement rail franchises of 2018. We need<br />

to be discussing with the likes of First Group<br />

about the electric services of the future calling<br />

at Magor, so they can build this into their bid.<br />

This will be a struggle and from the support<br />

already shown, we know the community is<br />

behind us. What we need is help and the<br />

community standing beside us. As many hands<br />

make light work. If you feel you would like to<br />

be actively involved and join the committee or<br />

just willing to help deliver information, help<br />

conduct travel survey’s in your street, please<br />

contact us.<br />

16<br />

Neil Farrant Ltd<br />

Electrical Contractor<br />

13 Celtic Close, Undy<br />

Monmouthshire. NP26 3PB<br />

Email: neil.elc1@yahoo.co.uk<br />

Home: 01633 549649<br />

Mobile: 07818 621467<br />

National Inspection Council for<br />

Electrical Installation Contracting<br />

APPROVED CONTRACTOR<br />

Please mention <strong>The</strong> <strong>Villager</strong> when responding to adverts

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!