I 221 Defence Works procedure, 2007<br />

preparation of basic designs or estimates etc. and/or<br />

Ddence Works procedure, 2007<br />

engaging an outside consultancy agenq, then a .Go_Ahead, then a- specific approval of the Government should be<br />

sanction of an amount not exceeding i% of tne ,*gf, .or,<br />

estimate will be taken for such aciivities r.o- ur, ?fficer<br />

of the level of Goc-in-c or equivalent or above with<br />

concurrence of the Integrated Fina:cial Adviser concerned.<br />

sugh- lloposals for'Go-Ahead' sanction should be submitted<br />

to Ministry of Defence/Defence (Finance) in case oi *ort,<br />

proposals for which administrative approval would have to<br />

be accordg.d by GovernmentiCabinei. A copy of such a<br />

'Go-Ahead' sanction wil be sent to the cDA concerned.<br />

, .@ In case of new works proposals requiring<br />

administrative.epproval of a cEA of the'level of i'ervice<br />

tteaoquarters/Government, such proposals may be<br />

submitted to the crA. along with both Board rro."Loing,<br />

and Approximate Estimatei for obtaining Acceptur,." or<br />

Necessity and Administrative Approvar at the same time.<br />

XI. APPROXIMATE ESTIMATES<br />

^ _ l2E (a) Ihg engineer aurhoriries will prepare the<br />

Approximate Estimates in the prescribed' proior-u<br />

(Appendix 'E) as per the lines indicateo in tt " ffiou"o<br />

statement of case and/or Board proceedingsorR.bmice<br />

and domestic accommodation requirementr for the MES<br />

constructional staff,. consultancy .-hurg.r, if any, n.r"rrury<br />

external services and other rrquir.*.nts of technical nature<br />

will be included in the Approximate Estimates, even-ir no<br />

specific recommendation of the Board of officers is e*1sting.<br />

.Q) Nr provision will be made in the estimates for<br />

special tools and plants since a central provision is made<br />

f:l tl,jr pu{pose under Sub Head p (u) of Minor UeaO<br />

111-works to cater for- special toors 'uno prunir for alr<br />

projects. Nevertheless, if fbr special technical reasons any<br />

special.tool or prant is require'd for any works project and<br />

cannot be met out of the above mentionid budgei piouirion,<br />

t23 I<br />

taken for inclusion of the estimated cost thereof with due<br />

rccommendation of the Director General of Works.<br />

. (c) contingencies wilr be provided at 3vo of the<br />

ostimates. Establishment charges will not be included for<br />

MoD establishment works buiwill be included for deposit<br />

wrlrks. Establishment charges, if any, may be included in<br />

the estimates after tecotding reasons therefore in each<br />

cuse, but will not exceed 2 vo-of the estimates. In addition,<br />

consultancy charges, not exceeding 3Vo may be included<br />

ln the estimates. Any additionar expenditure on consurtancy<br />

wlll require the approval of concirned CFA.<br />

... .(d)<br />

No special items of works or superior specifications<br />

will be included without specific upptouul of the competent<br />

Itinancial Authority. variitions in'specifications from those<br />

lncluded in approved plinth area rates, but considered<br />

cssential t.o_ suit peculiar local conditions due to technical<br />

rcasons will be highlighted.<br />

(e) Permissible rolerance limit of ITVo beyond<br />

Administrative Approval amount as per para z (h) above<br />

und s.avings achieved on conclusion of contracts *ilt ,rot<br />

bc utilized either to enhance the scope of the work or to<br />

enrich the specifications afterwards.<br />

(f) Approximate Estimates (as also rough cost at the<br />

lcg,eptance of necessiry stage) wili be pr.pur"i by Engineer<br />

officers competent to oo-so as per guidelines"laid"down<br />

hy the Director General of works. checks of such<br />

fpproximate Estimates will be made by the ,r""i-high".<br />

lingineer Authority as per directives laid down from time<br />

to time.<br />

(g) In case of worrc scheduled to be completed within<br />

two years, no escalation, except statutory increases, will be<br />

ulkrwed in the contracts foi execution of such works.<br />

Approximate Estimates for such works will ue frefareo<br />

ttccordingly.