I 221 Defence Works procedure, 2007<br />
preparation of basic designs or estimates etc. and/or<br />
Ddence Works procedure, 2007<br />
engaging an outside consultancy agenq, then a .Go_Ahead, then a- specific approval of the Government should be<br />
sanction of an amount not exceeding i% of tne ,*gf, .or,<br />
estimate will be taken for such aciivities r.o- ur, ?fficer<br />
of the level of Goc-in-c or equivalent or above with<br />
concurrence of the Integrated Fina:cial Adviser concerned.<br />
sugh- lloposals for'Go-Ahead' sanction should be submitted<br />
to Ministry of Defence/Defence (Finance) in case oi *ort,<br />
proposals for which administrative approval would have to<br />
be accordg.d by GovernmentiCabinei. A copy of such a<br />
'Go-Ahead' sanction wil be sent to the cDA concerned.<br />
, .@ In case of new works proposals requiring<br />
administrative.epproval of a cEA of the'level of i'ervice<br />
tteaoquarters/Government, such proposals may be<br />
submitted to the crA. along with both Board rro."Loing,<br />
and Approximate Estimatei for obtaining Acceptur,." or<br />
Necessity and Administrative Approvar at the same time.<br />
XI. APPROXIMATE ESTIMATES<br />
^ _ l2E (a) Ihg engineer aurhoriries will prepare the<br />
Approximate Estimates in the prescribed' proior-u<br />
(Appendix 'E) as per the lines indicateo in tt " ffiou"o<br />
statement of case and/or Board proceedingsorR.bmice<br />
and domestic accommodation requirementr for the MES<br />
constructional staff,. consultancy .-hurg.r, if any, n.r"rrury<br />
external services and other rrquir.*.nts of technical nature<br />
will be included in the Approximate Estimates, even-ir no<br />
specific recommendation of the Board of officers is e*1sting.<br />
.Q) Nr provision will be made in the estimates for<br />
special tools and plants since a central provision is made<br />
f:l tl,jr pu{pose under Sub Head p (u) of Minor UeaO<br />
111-works to cater for- special toors 'uno prunir for alr<br />
projects. Nevertheless, if fbr special technical reasons any<br />
special.tool or prant is require'd for any works project and<br />
cannot be met out of the above mentionid budgei piouirion,<br />
t23 I<br />
taken for inclusion of the estimated cost thereof with due<br />
rccommendation of the Director General of Works.<br />
. (c) contingencies wilr be provided at 3vo of the<br />
ostimates. Establishment charges will not be included for<br />
MoD establishment works buiwill be included for deposit<br />
wrlrks. Establishment charges, if any, may be included in<br />
the estimates after tecotding reasons therefore in each<br />
cuse, but will not exceed 2 vo-of the estimates. In addition,<br />
consultancy charges, not exceeding 3Vo may be included<br />
ln the estimates. Any additionar expenditure on consurtancy<br />
wlll require the approval of concirned CFA.<br />
... .(d)<br />
No special items of works or superior specifications<br />
will be included without specific upptouul of the competent<br />
Itinancial Authority. variitions in'specifications from those<br />
lncluded in approved plinth area rates, but considered<br />
cssential t.o_ suit peculiar local conditions due to technical<br />
rcasons will be highlighted.<br />
(e) Permissible rolerance limit of ITVo beyond<br />
Administrative Approval amount as per para z (h) above<br />
und s.avings achieved on conclusion of contracts *ilt ,rot<br />
bc utilized either to enhance the scope of the work or to<br />
enrich the specifications afterwards.<br />
(f) Approximate Estimates (as also rough cost at the<br />
lcg,eptance of necessiry stage) wili be pr.pur"i by Engineer<br />
officers competent to oo-so as per guidelines"laid"down<br />
hy the Director General of works. checks of such<br />
fpproximate Estimates will be made by the ,r""i-high".<br />
lingineer Authority as per directives laid down from time<br />
to time.<br />
(g) In case of worrc scheduled to be completed within<br />
two years, no escalation, except statutory increases, will be<br />
ulkrwed in the contracts foi execution of such works.<br />
Approximate Estimates for such works will ue frefareo<br />
ttccordingly.