Defence Works Procedure, 2007<br />
@| Steps upto Administrative Approval<br />
(a) After the "Go-Ahead" sanction the engineer<br />
authorities will start preparation of basic designs<br />
and Approximate Estimates. However, in cases<br />
where a Detailed Project Report has to be<br />
prepared as per Para 57 (a) (iii) above, the<br />
preparation of the Approximate Estimates may<br />
be undertaken on the basis of the approved<br />
DPR.<br />
(b) The AEs for works which are to be completed<br />
in two years shall be so framed that it caters<br />
for escalation for two years. However, the contract<br />
shall not include any escalation clause except<br />
statutory increases.<br />
(c) On the basis of the Approximate Estimates, the<br />
Technical sanction for the works will be given<br />
by the competent engineer authorities to enable<br />
taking of Tender Action. In case of works of<br />
high technical complexity tendering for Item Rate<br />
Contracts may be resorted to.<br />
(d) (i) In case of selective tendering, when<br />
approved by the CFA the time to submit<br />
tenders will be normally restricted to 4<br />
weeks from the date of issue of tender<br />
notice.<br />
(ii) The Offer of Mobilization Advance as<br />
indicated in Para 47 above will be made<br />
to ensure prompt mobilization of resources<br />
and commencement of works.<br />
(e) Simuitaneously with the issue of tenders, the<br />
Engineer authorities will submit the Approximate<br />
Estimates to the CFA for issue of Administrative<br />
' Approval. The Administrative, approval' will<br />
indicate thc detailed scope' 'of the works<br />
Drlonce Workl Procedure, 2007 147 I<br />
sanctionecl, the date by which the works will be<br />
completed and the budgetary sources from which<br />
fun