to execute all the operational works planned. In such cases<br />

work orders rnay be placed on the Military Engineer Services,<br />

Border Roads Organi-sation and other construction agencies if<br />

permitted by theii own department- procedures. However, no<br />

work will b6 ordered on civil agencies in areas where Military<br />

Engineer Services exist, withouf prior concurrence from Command<br />

Headquarters.<br />

Execution bY Formation Engineers<br />

8. Formation engineers will execute operational works<br />

ordered on them depaitmentally. They will not execute works<br />

through contract.<br />

i. Formation engineers who are ordered to execute olerational<br />

works will be piovided with Supplies and Services (S and<br />

S) lmprest under the sanction of the Chief Engineer, Corps<br />

Tire sinction issued by the chief engineer for this purpose will<br />

specifu the monetary -<br />

limit. The imprest account number will<br />

b^e allctted by Contioller of Det'ence Accounts on application,<br />

after issue of sanction by the Chief Engineer. Units will operate<br />

the S and S Imprest aCcounts in accordance with the relevant<br />

orders.<br />

1.0. Engineer stores specifically issued for use in^operational<br />

works and incorporated in them will be struck off charge on<br />

completion of the works on the basis of proper. incorporation<br />

certificate rendered by the executing units or sub units.<br />

L1. The commander competent to sanction the operational<br />

works may authorise formation engineers to purchase stores<br />

required (being not available wi.th dependent ordnance or engineer<br />

defots) from anywhere within the area of his responsibility.<br />

tlo-"n"., the Corps Commander may' if he so considers fit,<br />

give the commander competent .to sanction the operational<br />

iorks general or specific permission_to_-make purchases from<br />

ureas el*tending upio the whole of India or only a specified<br />

part thereof.<br />

L2, No separate sanction is necessary for using troops,<br />

war Equipment Table (wET) lquipment and transport available<br />

with th'e unit for execution of operational works. No charges<br />

are to be levied for these.<br />

13. No civilian tradesmen will be employed on operational<br />

works in sensitive areas. However, in security cleared areas<br />

civilian tradesmen can be employed to an extent Of five percent<br />

i;f the estimated cost of each lob, provided it is included in<br />

ihe Technical Sanction issued by the Chief Engineer, Corps'<br />

lssl<br />

No civilian tradesmen and labour will be employed on mainl(:nllrcc<br />

of operational works assets.<br />

14. It local labour is hired, the nerrick rates should be<br />

published in the formation routine orders and a copy of the<br />

r;nmc should be appended to the muster rolls while forwarding<br />

Irr thc Controller of Defence Accounts. [Paragraphs 1l of<br />

Iingineer-in-Chief's Depanmental Instructions issued vide their<br />

l.attcr No. 66449/F2 (WPC) dated 19 May 1977 refersl.<br />

Execution by Other Agencies<br />

15. When operational works are ordered on agencies other<br />

lhnn the formation engineers the procedure of the respective<br />

dcpartments will be followed in executing these works.<br />

L6. In case of operational works executed by the Military<br />

lingineer Services, monthly expenditure return will be submitted<br />

by the Military Engineer Services unit concerned to the Chief<br />

lingineer, Corps and the Controller of Defence Accounts through<br />

thc AAOGE. For other executing agencies, the Chief Engineer,<br />

(-'ommand, will coordinate the procedure to be followed for<br />

lncurring expenditure and for submission of returns to the<br />

Controller of Defence Accounts and the agency concerned.<br />

Pnyments by cheque, instead of book debit, may be made to<br />

thc executing agency, if so required by them.<br />

Technical and Financial Control<br />

17. Prior to the execution of operational works, technical<br />

*nnction will be issued by the competent engineer authority<br />

trrncd on a detailed technical project and a draft technical<br />

runction initiated by the formation engineers or the concerned<br />

cxecuting agency.<br />

18. Chief Engineer of the formations will assess the aproximate<br />

cost on the basis of draft technical sanction submitted<br />

y the formation engineers soon after the work has been<br />

*rnctioned and intimate it to the Controller of Defence Accounts<br />

eoncerned. The Controller of Defence Accounts will thereafter<br />

maintain the construction account and will inform the sanctioning<br />

and technical authority as and when the ceiling is exceeded.<br />

lf, however, at any stage during the execution of work, the<br />

npproximate cost assessed earlier is expected to be exceeded<br />

due to change in scope of work or design, the Chief Engineer,<br />

will intimate the Controller of Defence Accounts the revised<br />

ceiling, giving reasons for the variation, under intimation to all<br />

c