130 I Ootgncs Works procedure, 2007<br />
th".<br />
.F:ul Engineer or'r'ccr. I,urrher, skilred/semi-rHr"al<br />
itrTi"i #Tpi:::i:ll ll:'"i'r;Il.vctr "' J;ir;;;;;; p'v<br />
lut p:: Para-_35(c) above) rry it--"rgr"."t, ';fi:# exceeding 15 ffil<br />
days overall in ferms of time and 1000<br />
days<br />
man<br />
in effort.<br />
r_ lTl..*. procedures outlined in paras 34 to 36above<br />
9o. lol dispense with the necessity for the issue of<br />
Administrative Approv{by ttre Cne.Uased on subsequently<br />
prepared Approximate Esiimate at the .urri"ri ofp-J.iunity<br />
not exceeding six months after commencement of works.<br />
Further such works can t. rtuii.o *ith;;;-;iii"g ro.<br />
specific allotment of funds for the project rru;"li- t3 tne<br />
condition that necessary allotm"rrt of funO, f;;;i,;;uipo*<br />
is applied for and obtiined u, ,h" ,urliest opportunity as<br />
per provisions in para 45 below.<br />
XV. SPECIAL POWERS FOR ENGINEERS<br />
-, -F When an urgent w,ork (under paras 3l(d),<br />
34-36) is entrusted to th-e engineu", io" .o-prutio' oi trru<br />
works in a compressed time frame, the Ctrief errgirr.u"<br />
can exercise the fouowing speciar powers in connection<br />
with planning and executi"on of such works :<br />
(i) Detailing officers anywhere in the country.<br />
(1i) Resorting ro consultancy for any irem of work.<br />
(iii) Purchasing of stationery, reprographic<br />
equipments, typewriters or any other office<br />
equipment required.<br />
(iv) Installation . of Telex, Fix, Internet or other<br />
communication equipmenr in CBICWE/CE<br />
office.<br />
(r) Payment of charges for telephone connections<br />
including STD fa-itity on priority Uuri" ----"''<br />
(vi) Hiring of civil transport for project work.<br />
(vii) fliring of office and temporary accommodation<br />
for construction staff.<br />
Delence Works Procedure, 2007 31 I<br />
(viii)Procurement of cement and Steel frorn open<br />
market, if necessary.<br />
(ix)1 Selective tendering.<br />
(x)2 Dispensing with adverlisement for tendering and<br />
contracting.<br />
Note : The expenditure to be incurred fttr items cited in<br />
sub-Paras (iii) to (vii) above will be met out b7 conttngencies of<br />
the p_roject. The cost of consurtancy wilr be" arso m"et i"t ,iy<br />
Contingencies if not separately providbd fcr.<br />
XVI. PROCESSING OF LOW BUDGETED WORKS<br />
. ld| In case of Low Budgeted Works, i.e., original<br />
capital works costing more than Rs. 2 Lakh,.nut iess Ilan<br />
Rs. 15 Lakh, these works will be sanctioned by the cEAs<br />
after the Annual Low Budgeted works programme has<br />
been approved as per para 19 above and bulf ailotments<br />
of funds for this purpose in the relevant financial year have<br />
been made to the respective cEAs. Board proceedings can<br />
be dispensed with in case of Low Budgeted works c"osting<br />
upto Rs. 10 Lakh, if so decided by tne ene. Administrativl<br />
Approval in such cases will be based on consideration and<br />
approval of a Statement of case as per para 22 above by<br />
the cEA and Approximate Estimates as per para 30 above.<br />
lhl| In case of Low Budgeted Works carried out for<br />
urgent reasons as cited in paras 34 to 36 above, the<br />
procedures laid down therein can be adopted.<br />
XVII. REVENUE AND MINOR WORKS<br />
|Zil| (a) In case of Revenue Works and Minor Works<br />
as defined in para 5 (a) (iii) & (iv) above, these works<br />
The dispensation.mentioned in para OB (ix) & (x) woutd be<br />
clearly sp9t- out in the administrative ipirrbvat b6coroei Ei<br />
ths coWCFA not betow the tevel ot cod_in_b;"d ili;;i<br />
The_re_a_cons tor dispensing wirh compirition *au il;illi;<br />
on record ln writing.<br />
Chief .Englneer coud exercise these po{rers ln connection<br />
wlth the urgent work, after taklng ne lppronf of-iFA.--- -