load calculations, the requirement is essential to work out the<br />
capacity of the plant.<br />
'<br />
fO The layout plan giving the orientation of the buildings<br />
is also iequired-to hive the realistic estimation of the A'/C load.<br />
(d) Accn fcrr plant room and AHUs is .required to be<br />
under the air conditioning estimates whish is normally<br />
"ou".id<br />
missing.<br />
(-e) Ventilation schemes are not properly designed viz a<br />
viz flow rates are not given. As a result, the capacity of the<br />
mechanical plant is not realistic.<br />
(f) Energy conservation methods 919 qroposg{ to be<br />
adoptlO but wfiile designing and planning A/C plants, this aspect<br />
is not taken into consideration.<br />
(g) Building estimates for air conditioned sPac9 do not<br />
cover'Insulation -to roof/ceiling and double glazed windows to<br />
cut down A/C load. It should be considered while working out<br />
the cost of Bldg.<br />
(h) While- preparing the AEs for. rePlacement of A'/C<br />
olants. ihe system of aiiconditioning should not be changed<br />
irntil ihere ii reduction/increase of air conditioning load.<br />
(i) ED rates for centralized A/C plants are inclusive of<br />
ductirig/piping involved. However cost of standby unit should<br />
be tak?ir'as-50%o of rate given in ED for each ton'<br />
O Authorisation of water coolers and refrigerators are<br />
.<br />
not w6rked out as per scales of accommodation'<br />
(k) Many a timb, the air-conditioning requirements as given<br />
in texi'"f tnei BPs, and A/C questionnaire/Appendices/drgs ere<br />
at variance with each other. these must be reconciled'<br />
4. Ext Water SuPPIY SYstem<br />
Following details should be forwarded alongwith AEs'<br />
(a) Frictional Head Loss calculation.<br />
(U) Stotage capacity and staging of proposed<br />
-res-ervoirs<br />
based on lettei No. -84397/GenlPol/E4 (U3) dated 05 May 93'<br />
(c) Details of existing watgl-leJglvoirs should be furnished<br />
a* pei App* 'A' to letter\o. 84397lGenlPoVEa (U3) dated 05<br />
May 93. ' (d) Design calculations of pumps based on the proposed<br />
number of pumPing hours.<br />
(e) If ^BP'reiommends a borewell, a report ot CGWB<br />
must be accomPained with AEs.<br />
(f) For Fire Fighting Schemes the requirement of water<br />
I lse I<br />
lirr I'illing should be workcd out as per scale o[ accn 1983 Tablcr<br />
A.ll Sl No. 12 and pumping capacity be decided accordingly'<br />
5. Sewage System<br />
Foilowing details/info should accompany with AEs'<br />
(a) Layo"ut plan showing existing and proposed system of<br />
sewer'tfnes sno*ing both the GL and ILs of the existing lines<br />
and of the new sewer lines.<br />
(b) Capacity of septic tanks should be restricted to 300<br />
users as per manual on sewerage and sewage Treatment'<br />
(c) in case pr