1 2 3 4 5 6<br />

1. Purchase order number<br />

2. Total joints per layer<br />

3. Total footage per layer<br />

4. Length of this joint<br />

5. Size, weight, schedule<br />

6. Pipe rack number<br />

Figure 8-5. Identification of pipe s<strong>to</strong>red on racks.<br />

Step 5. Threaded and coupled line pipe is tallied in over-<br />

all lengths, including the coupling and the threads. This<br />

rule also applies <strong>to</strong> oilwell tubing, casing and drill pipes in<br />

s<strong>to</strong>rage. It is not necessary <strong>to</strong> remove pipe thread protec-<br />

<strong>to</strong>rs during a pipe tally at the warehouse or dockside (see<br />

Figure 8-6).<br />

Step 6. When issuing pipe, always send an extra<br />

amount, never less than requested. Record the length and<br />

joint number on the tally sheet, and verify accuracy. Do not<br />

s<strong>to</strong>re mixed pipe schedules or types on the same rack.<br />

I i<br />

Figure 8-6. Measure entire length of threaded and coupled pipe.<br />

t<br />

153